If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-089-25744 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.21,"lon":-82.47,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Licking | |
Municipality: Burlington Township | |
Operator Name: NORTHWOOD ENERGY CORP | |
Well Pad ID: | |
Farm/Lease Name: WESLEY LOUIS & RHADA | |
License Status: Producing | |
License Date: 2002-09-09 | |
Spud Date: 2002-10-17 | |
Spud Drilling Contractor: G & H DRLG | |
Final Drill Date: 2002-10-22 | |
Well Total Depth: 2559.00 ft | |
Configuration: Vertical | |
Latitude: 40.210000 | |
Longitude: -82.470000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2002-09-09 | Proposed Formations:BEREA TO CLINTON, Issued Date:9/9/2002, Expired Date:9/9/2003 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
Original Spud | 2002-10-17 | RBDMS Rec |
Completed | 2002-10-22 | RBDMS Rec |
Reached Total Depth | 2002-10-22 | RBDMS Rec |
Completion Report Received | 2003-02-24 | RBDMS Rec |
Construction Permit Expires | 2003-09-09 | RBDMS Rec |
Record Last Modified | 2017-02-15 | RBDMS Rec |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2003-04-17 | 2434 | 2458 | 20 |
2434 | 2458 | 20 | |
2434 | 2458 | 20 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 15 | 2000 Bbl | 20000 | 500 GALLONS HCL ACID |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2003 | HOPEWELL OIL & GAS DEVELOPMENT | 0.00 | 0.00 | 120 |
2004 | HOPEWELL OIL & GAS DEVELOPMENT | 2658.00 | 0.00 | 365 |
2005 | HOPEWELL OIL & GAS DEVELOPMENT | 2063.00 | 0.00 | 365 |
2006 | HOPEWELL OIL & GAS DEVELOPMENT | 2356.00 | 0.00 | 365 |
2007 | HOPEWELL OIL & GAS DEVELOPMENT | 2249.00 | 0.00 | 0 |
2008 | HOPEWELL OIL & GAS DEVELOPMENT | 2158.00 | 0.00 | 365 |
2009 | HOPEWELL OIL & GAS DEVELOPMENT | 1579.00 | 0.00 | 365 |
2010 | HOPEWELL OIL & GAS DEVELOPMENT | 2251.00 | 0.00 | 0 |
2011 | HOPEWELL OIL & GAS DEVELOPMENT | 2362.00 | 0.00 | 0 |
2012 | HOPEWELL OIL & GAS DEVELOPMENT | 2311.00 | 0.00 | 366 |
2013 | HOPEWELL OIL & GAS DEVELOPMENT | 1763.00 | 0.00 | 365 |
2014 | HOPEWELL OIL & GAS DEVELOPMENT | 1333.00 | 0.00 | 365 |
2015 | HOPEWELL OIL & GAS DEVELOPMENT | 825.00 | 0.00 | 365 |
2016 | HOPEWELL OIL & GAS DEVELOPMENT | 0.00 | 0.00 | 60 |
2017 | HOPEWELL OIL & GAS DEVELOPMENT | 0.00 | 0.00 | 0 |
2018 | HOPEWELL OIL & GAS DEVELOPMENT | 0.00 | 0.00 | 0 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2003 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 4010 | 120 |
2004 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 75 | 365 |
2005 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 0 | 365 |
2006 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 0 | 365 |
2007 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | ||
2008 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 0 | 365 |
2009 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 0 | 365 |
2010 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 0 | 0 |
2011 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 0 | |
2012 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 0 | 366 |
2013 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 0 | 365 |
2014 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 0 | 365 |
2015 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 0 | 365 |
2016 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 0 | 60 |
2017 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 0 | 0 |
2018 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 0 | 0 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1525680852 | 2002-10-17 0:00 | DD | No Violations | |
-1967062127 | 2015-2-5 0:00:0 | PW | No Violations | |
1414203758 | 2016-03-02 | Production Wells | No Violations | Inspection conducted as a status check. The well was equipped with a pumping unit and motor. It was not pumping. The tank battery consists of (1) 210 barrel tank. Identification was posted on the tank. No violations. Time of inspection: 2:15 PM. Weather: 27*F, Partly cloudy |
1525680852 | 2002-10-17 | Drill / Deepen / Reopen | No Violations | G & H Drilling rigging up on location. No violations noted this date. WEATHER CONDITIONS: Partly cloudy and 48 degrees. |
1967062127 | 2015-02-05 | Production Wells | No Violations | This inspection was conducted as a production well status check. The well was equipped with a pumping unit and motor. The tank battery consists of (1) 210 barrel tank. Identification was posted on the tank. No violations. Note: Entry is @ N 40.22424 W -82.45782. Time of inspection: 3:49 PM. Weather: 15 degrees F, Sunny, 3 snow |
For data sources see[9]