34-089-25907

Well Details

Well ID: 34-089-25907
Loading map...
Country: United States
State: Ohio
County: Licking
Municipality: Newton Township
Operator Name: KNOX ENERGY INC.
Well Pad ID:
Farm/Lease Name: WALKER D
License Status: Producing
License Date: 2008-02-20
Spud Date: 2008-04-21
Spud Drilling Contractor: BOWMAN DRILLING
Final Drill Date: 2008-04-23
Well Total Depth: 2515.00 ft
Configuration: Vertical
Latitude: 40.140000
Longitude: -82.420000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2008-02-20 Proposed Formations:OHSH THRU CLINTON, Issued Date:2/20/2008, Expired Date:2/19/2009 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:EOUT
Reached Total Depth 2008-04-23
Completion Report Received 2008-09-17
Construction Permit Expires 2009-02-19
Last Compliance Report 2014-07-24
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2008-10-28 2357 2363 13
2357 2363 13
2357 2363 13

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 58000 Gal 20000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2008 KNOX ENERGY INC. 2876.00 0.00 365
2009 KNOX ENERGY INC. 5583.00 0.00 365
2010 KNOX ENERGY INC. 2310.00 0.00 365
2011 KNOX ENERGY INC. 1666.00 0.00 365
2012 KNOX ENERGY INC. 1550.00 0.00 366
2013 KNOX ENERGY INC. 1518.00 0.00 365
2014 KNOX ENERGY INC. 1408.00 0.00 365
2015 KNOX ENERGY INC. 935.00 0.00 365
2016 KNOX ENERGY INC. 892.00 0.00 365
2017 KNOX ENERGY INC. 890.00 0.00 365
2018 KNOX ENERGY INC. 860.00 0.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2008 KNOX ENERGY INC. Brine 1125 365
2009 KNOX ENERGY INC. Brine 2275 365
2010 KNOX ENERGY INC. Brine 135 365
2011 KNOX ENERGY INC. Brine 205 365
2012 KNOX ENERGY INC. Brine 0 366
2013 KNOX ENERGY INC. Brine 0 365
2014 KNOX ENERGY INC. Brine 0 365
2015 KNOX ENERGY INC. Brine 0 365
2016 KNOX ENERGY INC. Brine 0 365
2017 KNOX ENERGY INC. Brine 0 365
2018 KNOX ENERGY INC. Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1506652040 2014-7-22 0:00: AD No Violations
-393083318 2020-3-27 0:00: PW No Violations 0.50
-923321687 2009-9-30 0:00: AD No Violations
-979039718 2014-7-22 0:00: AD No Violations
0064462114 2011-11-30 Preliminary Restoration No Violations An inspection revealed that the Preliminary Restoration meets ORC 1509.072. A GPS reading was obtained for the well and tank location. The well was equipped and showed signs of production. The tank battery consisted of (2) 100bbl with no knockout tank, a sales meter, compressor, drip and horizontal separator. Identification was displayed at the tank.
0170043653 2014-07-22 Annular Disposal No Violations This inspection was conducted as a status check. I witnessed Terry Wade fill up the annulus with nitrogen. The MIT test will be conducted tomorrow. No violations.
0288200335 2008-04-22 Drill / Deepen / Reopen No Violations I witnessed the cementing of the surface casing.
0923321687 2009-09-30 Annular Disposal No Violations I inspected this well location with Jeff Fry. We met Chime with Knox Energy on location and discussed the need to top off the surface cement job with cement. Chime ordered 5 yards of cement that arrived later this afternoon and the surface pipe was topped off around the outside of the pipe with this cement. This well is in the process of being hooked up and used as an annular disposal well.
0979039718 2014-07-22 Annular Disposal No Violations Well is approved for annular disposal. This date I assisted Inspectors Brandon Mitchell, and Tom Benko on witnessing and recording a 5 year Positive Differential Test. Terry Wade was on site and performed the test for Knox Energy. Test Passed. See Tom Benkos report for this date on details.
1506652040 2014-07-22 Annular Disposal No Violations Inspect well for annular disposal integrity test. Well tested for one hour at 215 psi with no loss in pressure. Well passes test.
1578274155 2020-8-5 0:00:0 PW No Violations 0.50
1582204606 2020-2-19 0:00: AD No Violations
170043653 2014-7-22 0:00: AD No Violations
1978673851 2014-07-22 Annular Disposal No Violations I witnessed the MIT test on this well today for Knox Energy. Terry Wade with Knox Energy was conducting the test. UIC Inspector Tom Benko, Jeff Fry, Andrew Adgate, and Kenny Brown were present for the test. The casing held pressure for 1 hour with no loss. No violations.
2072137557 2009-10-09 Annular Disposal No Violations I inspected this AD well with Jeff Fry. The surface casing cement job has been topped off with 5 yards of cement and is standing full to the surface with cement. The vent line was been buried and run back to the tank. Jeff Fry called Terry with Knox Energy and gave the okay to begin using this AD well. There were no violations noted this date.
288200335 2008-4-22 0:00: DD No Violations
64462114 2011-11-30 0:00 PL No Violations

For data sources see[9]

References