If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-089-25907 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.14,"lon":-82.42,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Licking | |
| Municipality: Newton Township | |
| Operator Name: KNOX ENERGY INC. | |
| Well Pad ID: | |
| Farm/Lease Name: WALKER D | |
| License Status: Producing | |
| License Date: 2008-02-20 | |
| Spud Date: 2008-04-21 | |
| Spud Drilling Contractor: BOWMAN DRILLING | |
| Final Drill Date: 2008-04-23 | |
| Well Total Depth: 2515.00 ft | |
| Configuration: Vertical | |
| Latitude: 40.140000 | |
| Longitude: -82.420000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2008-02-20 | Proposed Formations:OHSH THRU CLINTON, Issued Date:2/20/2008, Expired Date:2/19/2009 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:EOUT |
| Reached Total Depth | 2008-04-23 | |
| Completion Report Received | 2008-09-17 | |
| Construction Permit Expires | 2009-02-19 | |
| Last Compliance Report | 2014-07-24 | |
| Record Last Modified | 2017-02-15 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2008-10-28 | 2357 | 2363 | 13 |
| 2357 | 2363 | 13 | |
| 2357 | 2363 | 13 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| H2O | 0 | 58000 Gal | 20000 |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2008 | KNOX ENERGY INC. | 2876.00 | 0.00 | 365 |
| 2009 | KNOX ENERGY INC. | 5583.00 | 0.00 | 365 |
| 2010 | KNOX ENERGY INC. | 2310.00 | 0.00 | 365 |
| 2011 | KNOX ENERGY INC. | 1666.00 | 0.00 | 365 |
| 2012 | KNOX ENERGY INC. | 1550.00 | 0.00 | 366 |
| 2013 | KNOX ENERGY INC. | 1518.00 | 0.00 | 365 |
| 2014 | KNOX ENERGY INC. | 1408.00 | 0.00 | 365 |
| 2015 | KNOX ENERGY INC. | 935.00 | 0.00 | 365 |
| 2016 | KNOX ENERGY INC. | 892.00 | 0.00 | 365 |
| 2017 | KNOX ENERGY INC. | 890.00 | 0.00 | 365 |
| 2018 | KNOX ENERGY INC. | 860.00 | 0.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2008 | KNOX ENERGY INC. | Brine | 1125 | 365 |
| 2009 | KNOX ENERGY INC. | Brine | 2275 | 365 |
| 2010 | KNOX ENERGY INC. | Brine | 135 | 365 |
| 2011 | KNOX ENERGY INC. | Brine | 205 | 365 |
| 2012 | KNOX ENERGY INC. | Brine | 0 | 366 |
| 2013 | KNOX ENERGY INC. | Brine | 0 | 365 |
| 2014 | KNOX ENERGY INC. | Brine | 0 | 365 |
| 2015 | KNOX ENERGY INC. | Brine | 0 | 365 |
| 2016 | KNOX ENERGY INC. | Brine | 0 | 365 |
| 2017 | KNOX ENERGY INC. | Brine | 0 | 365 |
| 2018 | KNOX ENERGY INC. | Brine | 0 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1506652040 | 2014-7-22 0:00: | AD | No Violations | |
| -393083318 | 2020-3-27 0:00: | PW | No Violations | 0.50 |
| -923321687 | 2009-9-30 0:00: | AD | No Violations | |
| -979039718 | 2014-7-22 0:00: | AD | No Violations | |
| 0064462114 | 2011-11-30 | Preliminary Restoration | No Violations | An inspection revealed that the Preliminary Restoration meets ORC 1509.072. A GPS reading was obtained for the well and tank location. The well was equipped and showed signs of production. The tank battery consisted of (2) 100bbl with no knockout tank, a sales meter, compressor, drip and horizontal separator. Identification was displayed at the tank. |
| 0170043653 | 2014-07-22 | Annular Disposal | No Violations | This inspection was conducted as a status check. I witnessed Terry Wade fill up the annulus with nitrogen. The MIT test will be conducted tomorrow. No violations. |
| 0288200335 | 2008-04-22 | Drill / Deepen / Reopen | No Violations | I witnessed the cementing of the surface casing. |
| 0923321687 | 2009-09-30 | Annular Disposal | No Violations | I inspected this well location with Jeff Fry. We met Chime with Knox Energy on location and discussed the need to top off the surface cement job with cement. Chime ordered 5 yards of cement that arrived later this afternoon and the surface pipe was topped off around the outside of the pipe with this cement. This well is in the process of being hooked up and used as an annular disposal well. |
| 0979039718 | 2014-07-22 | Annular Disposal | No Violations | Well is approved for annular disposal. This date I assisted Inspectors Brandon Mitchell, and Tom Benko on witnessing and recording a 5 year Positive Differential Test. Terry Wade was on site and performed the test for Knox Energy. Test Passed. See Tom Benkos report for this date on details. |
| 1506652040 | 2014-07-22 | Annular Disposal | No Violations | Inspect well for annular disposal integrity test. Well tested for one hour at 215 psi with no loss in pressure. Well passes test. |
| 1578274155 | 2020-8-5 0:00:0 | PW | No Violations | 0.50 |
| 1582204606 | 2020-2-19 0:00: | AD | No Violations | |
| 170043653 | 2014-7-22 0:00: | AD | No Violations | |
| 1978673851 | 2014-07-22 | Annular Disposal | No Violations | I witnessed the MIT test on this well today for Knox Energy. Terry Wade with Knox Energy was conducting the test. UIC Inspector Tom Benko, Jeff Fry, Andrew Adgate, and Kenny Brown were present for the test. The casing held pressure for 1 hour with no loss. No violations. |
| 2072137557 | 2009-10-09 | Annular Disposal | No Violations | I inspected this AD well with Jeff Fry. The surface casing cement job has been topped off with 5 yards of cement and is standing full to the surface with cement. The vent line was been buried and run back to the tank. Jeff Fry called Terry with Knox Energy and gave the okay to begin using this AD well. There were no violations noted this date. |
| 288200335 | 2008-4-22 0:00: | DD | No Violations | |
| 64462114 | 2011-11-30 0:00 | PL | No Violations |
For data sources see[9]