If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-089-26150 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.1,"lon":-82.64,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Licking | |
| Municipality: St. Albans Township | |
| Operator Name: KNOX ENERGY INC. | |
| Well Pad ID: | |
| Farm/Lease Name: DONAHEY-LLOYD UNIT | |
| License Status: Producing | |
| License Date: 2014-07-23 | |
| Spud Date: 2014-09-09 | |
| Spud Drilling Contractor: KILBARGER DRLG | |
| Final Drill Date: 2014-09-12 | |
| Well Total Depth: 2047.00 ft | |
| Configuration: Vertical | |
| Latitude: 40.100000 | |
| Longitude: -82.640000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2014-07-23 | Proposed Formations:OHIO SHALE-CLINTON, Issued Date:7/23/2014, Expired Date:7/22/2016 12:00:00 PM, Drilling unit acres:16, Proposed Well Type:OG, Proposed Well Class:POOL |
| Reached Total Depth | 2014-09-12 | |
| Completion Report Received | 2014-12-12 | |
| Construction Permit Expires | 2016-07-22 | |
| Record Last Modified | 2017-02-10 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2014-12-15 | 1922 | 1929 | 15 |
| 1922 | 1929 | 15 | |
| 1922 | 1929 | 15 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| 2014-09-25 | H2O | 15 | 52431 Gal | 150000 | Producers Service Corporation |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2014 | KNOX ENERGY INC. | 0.00 | 0.00 | 0 |
| 2015 | KNOX ENERGY INC. | 0.00 | 743.00 | 363 |
| 2016 | KNOX ENERGY INC. | 0.00 | 562.00 | 365 |
| 2017 | KNOX ENERGY INC. | 0.00 | 465.00 | 365 |
| 2018 | KNOX ENERGY INC. | 0.00 | 350.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2014 | KNOX ENERGY INC. | Brine | 7 | 0 |
| 2015 | KNOX ENERGY INC. | Brine | 5 | 363 |
| 2016 | KNOX ENERGY INC. | Brine | 65 | 365 |
| 2017 | KNOX ENERGY INC. | Brine | 0 | 365 |
| 2018 | KNOX ENERGY INC. | Brine | 0 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1686084728 | 2014-9-10 0:00: | CS | No Violations | |
| -571358083 | 2014-10-6 0:00: | PL | No Violations | |
| 0012312508 | 2014-09-09 | Drill / Deepen / Reopen | No Violations | I inspected drilling operations today. Kilbarger rig #5 drilling on fluid with an 11 inch bit during inspection. Depth was approximately 50 feet. The pits were properly lined and the permit was posted. No violations. |
| 0571358083 | 2014-10-06 | Preliminary Restoration | No Violations | This inspection was conducted as a preliminary restoration status check. The well was equipped with a pumping unit and motor. It was pumping during inspection. The tank battery consists of (1) 210 barrel tank and (1) 100 barrel tank inside an earthen dike. Drilling pits have been closed and equipment has been removed. Preliminary restoration will be passed when good vegetative growth is established. |
| 0842001575 | 2015-05-14 | Preliminary Restoration | No Violations | Inspect well as part of a preliminary restoration status check. The well was equipped with a pumping unit and motor. The location has been restored. The well is located in an agricultural field. Crops will be planted around the well. Inspection meets ORC 1509.072 requirements. Time of inspection: 10:50 AM. Weather: 54*F, Sunny |
| 12312508 | 2014-9-9 0:00:0 | DD | No Violations | |
| 1686084728 | 2014-09-10 | Casing String Witnessed | No Violations | I witnessed the cementing of the 8 inch surface casing on Kilbarger rig #5 for Knox Energy. Bill Mitton with Knox Energy was on location. Petroset Cementing was contracted to cement casing. Petroset broke circulation and good cement returns were observed. The cement stayed at the surface. A cement basket was not used. The cement ticket was received. |
| 1758572805 | 2020-6-1 0:00:0 | PW | No Violations | 0.50 |
| 357558796 | 2020-3-26 0:00: | PW | No Violations | 0.50 |
| 842001575 | 2015-5-14 0:00: | PL | No Violations |
For data sources see[9]