34-093-21162

Well Details

Well ID: 34-093-21162
Loading map...
Country: United States
State: Ohio
County: Medina
Municipality: Liverpool Township
Operator Name: GENESIS RESOURCES LLC
Well Pad ID:
Farm/Lease Name: PLATA-RUBESNE
License Status: Producing
License Date: 1999-09-02
Spud Date: 1982-09-23
Spud Drilling Contractor: FITZGERALD DRLG
Final Drill Date: 1982-10-29
Well Total Depth: 2764.00 ft
Configuration: Vertical
Latitude: 41.270000
Longitude: -81.930000

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1982-04-19 198 VIKING RESOURCES CORP GeoDate 4/19/82
Oil and Gas 1982-04-19 Issued Date 4/20/82 Expired Date 10/17/82 Acres 0120580 Tool Type CT Proposed Formation CLINTON Proposed Depth 02764 Proposed Drill Depth 02764
Original Spud 1982-09-23
Completed 1982-10-29
Reached Total Depth 1982-10-29
Completion Report Received 1982-11-01
APP 1999-09-02 Proposed Formations:CLINTON, Issued Date:9/2/99, Expired Date:9/1/2000 6:00:00 AM, Drilling unit acres:120.58, Proposed Well Type:OG, Proposed Well Class:
Construction Permit Expires 2000-09-01
Change of Owner 2002-02-12 Operator changed from 198, VIKING RESOURCES CORP to 1453, GREEN ENERGY INC
Record Last Modified 2015-09-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1997-06-29 0 0
0 0
0 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 810 Bbl 50000 FRAC 810 BBL FLUID 50M SAND

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1984 GEO ENERGY INC 10014.00 1274.00 0
1985 GEO ENERGY INC 3188.00 390.00 365
1986 GEO ENERGY INC 1848.00 606.00 365
1987 GEO ENERGY INC 0.00 226.00 365
1988 GEO ENERGY INC 0.00 0.00 0
1990 VIKING RESOURCES LLC 3050.00 136.00 364
1991 VIKING RESOURCES LLC 2423.00 125.00 365
1992 VIKING RESOURCES LLC 1554.00 82.00 304
1993 VIKING RESOURCES LLC 1254.00 43.00 365
1994 VIKING RESOURCES LLC 1135.00 58.00 365
1995 VIKING RESOURCES LLC 107.00 11.00 0
2002 GREEN ENERGY INC 1292.00 130.00 365
2003 GREEN ENERGY INC 1972.00 73.00 365
2004 GREEN ENERGY INC 2008.00 125.00 365
2005 GREEN ENERGY INC 1644.00 85.00 365
2006 GREEN ENERGY INC 1229.00 42.00 365
2007 GREEN ENERGY INC 1016.00 71.00 365
2008 GREEN ENERGY INC 930.00 21.00 366
2009 GREEN ENERGY INC 904.00 0.00 365
2010 GREEN ENERGY INC 843.00 36.00 365
2011 GREEN ENERGY INC 904.00 62.00 365
2012 GREEN ENERGY INC 637.00 22.00 366
2013 GREEN ENERGY INC 531.00 48.00 365
2014 GREEN ENERGY INC 378.00 15.00 365
2015 GREEN ENERGY INC 472.00 42.00 365
2016 GREEN ENERGY INC 742.00 36.00 365
2017 GREEN ENERGY INC 943.00 41.00 365
2018 GREEN ENERGY INC 840.00 29.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1984 GEO ENERGY INC Brine 0 0
1985 GEO ENERGY INC Brine 0 365
1986 GEO ENERGY INC Brine 0 365
1987 GEO ENERGY INC Brine 30 365
1988 GEO ENERGY INC Brine 0 0
1990 VIKING RESOURCES LLC Brine 13 364
1991 VIKING RESOURCES LLC Brine 20 365
1992 VIKING RESOURCES LLC Brine 15 304
1993 VIKING RESOURCES LLC Brine 80 365
1994 VIKING RESOURCES LLC Brine 7 365
1995 VIKING RESOURCES LLC Brine 0 0
2002 GREEN ENERGY INC Brine 0 365
2003 GREEN ENERGY INC Brine 0 365
2004 GREEN ENERGY INC Brine 10 365
2005 GREEN ENERGY INC Brine 8 365
2006 GREEN ENERGY INC Brine 0 365
2007 GREEN ENERGY INC Brine 0 365
2008 GREEN ENERGY INC Brine 0 366
2009 GREEN ENERGY INC Brine 0 365
2010 GREEN ENERGY INC Brine 0 365
2011 GREEN ENERGY INC Brine 7 365
2012 GREEN ENERGY INC Brine 0 366
2013 GREEN ENERGY INC Brine 0 365
2014 GREEN ENERGY INC Brine 0 365
2015 GREEN ENERGY INC Brine 0 365
2016 GREEN ENERGY INC Brine 0 365
2017 GREEN ENERGY INC Brine 0 365
2018 GREEN ENERGY INC Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
000PL13406 Preliminary Restoration No Violations Preliminary Restoration done information from Data Point
0811402448 2017-05-24 Production Wells No Violations Inspected was conducted on this production well. The tank battery consists of 1-210 bbl. steel tank, 1-500 gal plastic tank, and 1-horizontal separator within an earthen dike. The diked area is located within a locked metal fence. The tank battery is used by multiple wells (3); identification is clearly displayed for all wells utilizing it. The well is equipped with a pump jack with an electric motor located within an open metal fence.
1360786571 2013-02-13 Production Wells No Violations I inspected this well and found one pump jack with electric motor on the wellhead. I could not determine the pressure on the tubing due to the gauge being broken. There was no gauge installed on the casing so the pressure could not be determined either. No leaks were detected on the wellhead or on the piping around the wellhead. The area around the pump jack and wellhead was nicely maintained and was enclosed with a steel chain link barbed wire fence with a locked access gate. The tank battery contained one 210 bbl. steel oil storage tank, one 25 bbl. plastic brine storage tank with a missing lid, one horizontal oil and gas separator unit with a working gas sales chart recorder and one drip assembly. A residential type gas meter and regulator was plumbed into the piping on the separator unit. There was a rusty non working horizontal separator unit along with several lengths of rusty pipe laying on the ground inside of the tank battery. The proper identification sign was posted on the steel tank and no visible leaks were detected on the tanks or piping within the tank battery. The earthen dike was in good shape, but the area outside of the dike had an excessive amount of weed growth and clutter and debris laying on the ground. The tank battery was enclosed with a steel chain link barbed wire fence with a locked access gate. A 16 ft x 16 ft. steel storage shed was located on the west side of the tank battery. The back wall of this storage shed was attached to the access gate and served as part of the fence. It was determined that this tank battery also handles production for the Plata #1 well and the Plata #4 well.
2077407639 2014-07-15 Production Wells No Violations Inspected production well on 07/15/2014. The tank battery consists of 1-210 bbl steel tank, 1-500 gal plastic tank, and 1-horizontal separator within an earthen dike. The diked area is located within a locked metal fence. The tank battery is used by multiple wells (3); identification is clearly displayed for all wells utilizing it. The well is equipped with a pump jack with an electric motor located within an open metal fence. No well identification was posted at the wellhead at the time of the inspection as required. Steve Gessel with Green Energy was notified of this issue onsite at another well location on 07/16/2014 and sent pictures confirming the problem was addressed. No other problems were noted at the time of the inspection.
811402448 2017-5-24 0:00: PW No Violations
PL13406 PL No Violations

For data sources see[9]

References