X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-099-23153

Well Details

Well ID: 34-099-23153
Loading map...
Country: United States
State: Ohio
County: Columbiana
Municipality: Butler Township
Operator Name: CEDAR VALLEY ENERGY INC
Well Pad ID:
Farm/Lease Name: CHUMNEY
License Status: Producing
License Date: 2012-07-30
Spud Date: 2012-09-24
Spud Drilling Contractor: ADVENT DRLG
Final Drill Date: 2012-09-30
Well Total Depth: 5836.00 ft
Configuration: Vertical
Latitude: 40.900000
Longitude: -80.920000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2011-06-20 Proposed Formations:OHIO SHALE TO QUEENSTON, Issued Date:6/20/2011, Expired Date:6/19/2013 12:00:00 PM, Drilling unit acres:45.78, Proposed Well Type:OG, Proposed Well Class:POOL
APP 2012-07-30 Proposed Formations:OHIO SHALE THRU QUEENSTON, Issued Date:7/30/2012, Expired Date:7/30/2014 12:00:00 PM, Drilling unit acres:45.783, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2012-09-30
Completion Report Received 2012-11-29
Construction Permit Expires 2014-07-30
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2012-12-11 5652 5748 42
5652 5748 42
5652 5748 42

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2012-10-30 H2O 15 4438 Bbl 0 Universal Well Services Inc.

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2012 CEDAR VALLEY ENERGY INC 0.00 0.00 0
2013 CEDAR VALLEY ENERGY INC 4281.00 769.00 365
2014 CEDAR VALLEY ENERGY INC 1888.00 1605.00 365
2015 CEDAR VALLEY ENERGY INC 2260.00 2154.00 365
2016 CEDAR VALLEY ENERGY INC 2700.00 1959.00 365
2017 CEDAR VALLEY ENERGY INC 2418.00 1397.00 365
2018 CEDAR VALLEY ENERGY INC 1461.00 1023.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2012 CEDAR VALLEY ENERGY INC Brine 0 0
2013 CEDAR VALLEY ENERGY INC Brine 986 365
2014 CEDAR VALLEY ENERGY INC Brine 299 365
2015 CEDAR VALLEY ENERGY INC Brine 344 365
2016 CEDAR VALLEY ENERGY INC Brine 419 365
2017 CEDAR VALLEY ENERGY INC Brine 295 365
2018 CEDAR VALLEY ENERGY INC Brine 221 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1816484243 2012-9-12 0:00: DD No Violations 2.00
-2087172830 2012-9-30 0:00: DD No Violations
1349120000 2012-09-24 Drill / Deepen / Reopen No Violations Advent Drilling moving on location. Dailey Exvacting will be digging pits at 3:00 pm. I will inspect them on 9/25/2012. Advent has a copy of the drilling permit in hand.
1349191493 2012-09-26 Drill / Deepen / Reopen No Violations Petroset Cementing Service on location to cement the 8.625 23# casing to a depth of 880. They used 300 sacks of lite with cell-o-flake and 100 sacks of class A cement with 3% CaCl. See Casing Report. I also inspected the location and pits. No violations at this time.
1350319917 2012-10-01 Drill / Deepen / Reopen No Violations Inspected drilling location and the drilling pits, they are removing drilling fluid and water today. they will solidify pits on 10/4/2012 , rig is also is moving off of location.
1356101593 2012-12-06 Production Wells No Violations On 12/06/2012, I performed a status check on the above well site. The tank battery is equipped with one 100 barrel tank, one 50 barrel tank and one horizontal separator. The dike is in good condition. This well is equipped with a pumping unit with a gas motor. This well is not in production as this time. Waiting on gas samples.
1816484243 2012-09-12 Drill / Deepen / Reopen No Violations I met with Tim Comas Field Supervisor for Cedar Valley Energy at the above drilling location to look over where the pits will go and how the rig will set. They will notify me when Advent Drilling is ready to move on location.
2087172830 2012-09-30 Drill / Deepen / Reopen No Violations I was notified by Tim Comas, that they would be cementing 4.5 production on casing on 9/30/2012 at 11:00pm. I instructed him that I would not be available at that time.

For data sources see[9]

References