If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-099-23153 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.9,"lon":-80.92,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Columbiana | |
| Municipality: Butler Township | |
| Operator Name: CEDAR VALLEY ENERGY INC | |
| Well Pad ID: | |
| Farm/Lease Name: CHUMNEY | |
| License Status: Producing | |
| License Date: 2012-07-30 | |
| Spud Date: 2012-09-24 | |
| Spud Drilling Contractor: ADVENT DRLG | |
| Final Drill Date: 2012-09-30 | |
| Well Total Depth: 5836.00 ft | |
| Configuration: Vertical | |
| Latitude: 40.900000 | |
| Longitude: -80.920000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2011-06-20 | Proposed Formations:OHIO SHALE TO QUEENSTON, Issued Date:6/20/2011, Expired Date:6/19/2013 12:00:00 PM, Drilling unit acres:45.78, Proposed Well Type:OG, Proposed Well Class:POOL |
| APP | 2012-07-30 | Proposed Formations:OHIO SHALE THRU QUEENSTON, Issued Date:7/30/2012, Expired Date:7/30/2014 12:00:00 PM, Drilling unit acres:45.783, Proposed Well Type:OG, Proposed Well Class:POOL |
| Reached Total Depth | 2012-09-30 | |
| Completion Report Received | 2012-11-29 | |
| Construction Permit Expires | 2014-07-30 | |
| Record Last Modified | 2017-02-15 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2012-12-11 | 5652 | 5748 | 42 |
| 5652 | 5748 | 42 | |
| 5652 | 5748 | 42 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| 2012-10-30 | H2O | 15 | 4438 Bbl | 0 | Universal Well Services Inc. |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2012 | CEDAR VALLEY ENERGY INC | 0.00 | 0.00 | 0 |
| 2013 | CEDAR VALLEY ENERGY INC | 4281.00 | 769.00 | 365 |
| 2014 | CEDAR VALLEY ENERGY INC | 1888.00 | 1605.00 | 365 |
| 2015 | CEDAR VALLEY ENERGY INC | 2260.00 | 2154.00 | 365 |
| 2016 | CEDAR VALLEY ENERGY INC | 2700.00 | 1959.00 | 365 |
| 2017 | CEDAR VALLEY ENERGY INC | 2418.00 | 1397.00 | 365 |
| 2018 | CEDAR VALLEY ENERGY INC | 1461.00 | 1023.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2012 | CEDAR VALLEY ENERGY INC | Brine | 0 | 0 |
| 2013 | CEDAR VALLEY ENERGY INC | Brine | 986 | 365 |
| 2014 | CEDAR VALLEY ENERGY INC | Brine | 299 | 365 |
| 2015 | CEDAR VALLEY ENERGY INC | Brine | 344 | 365 |
| 2016 | CEDAR VALLEY ENERGY INC | Brine | 419 | 365 |
| 2017 | CEDAR VALLEY ENERGY INC | Brine | 295 | 365 |
| 2018 | CEDAR VALLEY ENERGY INC | Brine | 221 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1816484243 | 2012-9-12 0:00: | DD | No Violations | 2.00 |
| -2087172830 | 2012-9-30 0:00: | DD | No Violations | |
| 1349120000 | 2012-09-24 | Drill / Deepen / Reopen | No Violations | Advent Drilling moving on location. Dailey Exvacting will be digging pits at 3:00 pm. I will inspect them on 9/25/2012. Advent has a copy of the drilling permit in hand. |
| 1349191493 | 2012-09-26 | Drill / Deepen / Reopen | No Violations | Petroset Cementing Service on location to cement the 8.625 23# casing to a depth of 880. They used 300 sacks of lite with cell-o-flake and 100 sacks of class A cement with 3% CaCl. See Casing Report. I also inspected the location and pits. No violations at this time. |
| 1350319917 | 2012-10-01 | Drill / Deepen / Reopen | No Violations | Inspected drilling location and the drilling pits, they are removing drilling fluid and water today. they will solidify pits on 10/4/2012 , rig is also is moving off of location. |
| 1356101593 | 2012-12-06 | Production Wells | No Violations | On 12/06/2012, I performed a status check on the above well site. The tank battery is equipped with one 100 barrel tank, one 50 barrel tank and one horizontal separator. The dike is in good condition. This well is equipped with a pumping unit with a gas motor. This well is not in production as this time. Waiting on gas samples. |
| 1816484243 | 2012-09-12 | Drill / Deepen / Reopen | No Violations | I met with Tim Comas Field Supervisor for Cedar Valley Energy at the above drilling location to look over where the pits will go and how the rig will set. They will notify me when Advent Drilling is ready to move on location. |
| 2087172830 | 2012-09-30 | Drill / Deepen / Reopen | No Violations | I was notified by Tim Comas, that they would be cementing 4.5 production on casing on 9/30/2012 at 11:00pm. I instructed him that I would not be available at that time. |
For data sources see[9]