If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-103-24690 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.2,"lon":-81.69,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Medina | |
Municipality: Granger Township | |
Operator Name: MFC DRILLING INC | |
Well Pad ID: | |
Farm/Lease Name: MATEJKA | |
License Status: Producing | |
License Date: 1993-10-19 | |
Spud Date: 1993-10-25 | |
Spud Drilling Contractor: [[P&R INC [PEEK & ROWAN]]] | |
Final Drill Date: 1993-10-30 | |
Well Total Depth: 3545.00 ft | |
Configuration: Vertical | |
Latitude: 41.200000 | |
Longitude: -81.690000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Oil and Gas | 1993-10-19 | Issued Date 10/19/93 Expired Date Acres 0022718 Tool Type RTF Proposed Formation CLINTON Proposed Depth Proposed Drill Depth |
Original Spud | 1993-10-26 | |
Completed | 1993-10-30 | |
Reached Total Depth | 1993-10-30 | |
CO | 1994-01-17 | 106 SHAFER BERMAN J GeoDate 10/19/93 |
Completion Report Received | 1994-02-22 | |
Construction Permit Expires | 1994-10-19 | |
Change of Owner | 1997-11-11 | Operator changed from 106, SHAFER BERMAN J to 3059, MFC DRILLING INC |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 3344 | 3422 | 0 |
3344 | 3422 | 0 | |
2006-09-11 | 3375 | 3392 | 11 |
3375 | 3392 | 11 | |
3344 | 3422 | 0 | |
2006-09-11 | 3415 | 3418 | 4 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 1500 Bbl | 35000 | FRAC W/1500 BW & 35M# SAND |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1994 | SHAFER BERMAN J | 2466.00 | 553.00 | 348 |
1995 | SHAFER BERMAN J | 2207.00 | 81.00 | 365 |
1996 | SHAFER BERMAN J | 2298.00 | 227.00 | 365 |
1997 | SHAFER BERMAN J | 2033.00 | 235.00 | 341 |
1998 | MFC DRILLING INC | 0.00 | 152.00 | 365 |
1999 | MFC DRILLING INC | 1344.00 | 151.00 | 365 |
2000 | MFC DRILLING INC | 1060.00 | 106.00 | 365 |
2001 | MFC DRILLING INC | 843.00 | 78.00 | 365 |
2002 | MFC DRILLING INC | 433.00 | 0.00 | 365 |
2003 | MFC DRILLING INC | 872.00 | 81.00 | 365 |
2004 | MFC DRILLING INC | 663.00 | 72.00 | 365 |
2005 | MFC DRILLING INC | 537.00 | 72.00 | 365 |
2006 | MFC DRILLING INC | 224.00 | 75.00 | 365 |
2007 | MFC DRILLING INC | 202.00 | 0.00 | 365 |
2008 | MFC DRILLING INC | 406.00 | 74.00 | 365 |
2009 | MFC DRILLING INC | 436.00 | 73.00 | 365 |
2010 | MFC DRILLING INC | 405.00 | 72.00 | 365 |
2011 | MFC DRILLING INC | 413.00 | 70.00 | 365 |
2012 | MFC DRILLING INC | 705.00 | 60.00 | 366 |
2013 | MFC DRILLING INC | 615.00 | 0.00 | 365 |
2014 | MFC DRILLING INC | 523.00 | 77.00 | 365 |
2015 | MFC DRILLING INC | 474.00 | 77.00 | 365 |
2016 | MFC DRILLING INC | 458.00 | 64.00 | 365 |
2017 | MFC DRILLING INC | 456.00 | 0.00 | 365 |
2018 | MFC DRILLING INC | 761.00 | 71.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1994 | SHAFER BERMAN J | Brine | 470 | 348 |
1995 | SHAFER BERMAN J | Brine | 90 | 365 |
1996 | SHAFER BERMAN J | Brine | 81 | 365 |
1997 | SHAFER BERMAN J | Brine | 65 | 341 |
1998 | MFC DRILLING INC | Brine | 35 | 365 |
1999 | MFC DRILLING INC | Brine | 96 | 365 |
2000 | MFC DRILLING INC | Brine | 0 | 365 |
2001 | MFC DRILLING INC | Brine | 45 | 365 |
2002 | MFC DRILLING INC | Brine | 0 | 365 |
2003 | MFC DRILLING INC | Brine | 80 | 365 |
2004 | MFC DRILLING INC | Brine | 0 | 365 |
2005 | MFC DRILLING INC | Brine | 0 | 365 |
2006 | MFC DRILLING INC | Brine | 55 | 365 |
2007 | MFC DRILLING INC | Brine | 59 | 365 |
2008 | MFC DRILLING INC | Brine | 0 | 365 |
2009 | MFC DRILLING INC | Brine | 0 | 365 |
2010 | MFC DRILLING INC | Brine | 45 | 365 |
2011 | MFC DRILLING INC | Brine | 41 | 365 |
2012 | MFC DRILLING INC | Brine | 0 | 366 |
2013 | MFC DRILLING INC | Brine | 0 | 365 |
2014 | MFC DRILLING INC | Brine | 53 | 365 |
2015 | MFC DRILLING INC | Brine | 0 | 365 |
2016 | MFC DRILLING INC | Brine | 45 | 365 |
2017 | MFC DRILLING INC | Brine | 0 | 365 |
2018 | MFC DRILLING INC | Brine | 456 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-324267057 | 2014-7-11 0:00: | PW | No Violations | |
-656857540 | 2007-5-15 0:00: | PW | No Violations | 1.00 |
0324267057 | 2014-07-11 | Production Wells | No Violations | Inspected production well on 07/11/2014. The tank battery consists of 1-100 bbl steel tank, 1-50 bbl steel tank, and 1-vertical separator located within an earthen dike. Well identification is clearly displayed at the tank battery. The well is equipped with a pump jack with an electric motor. No problems were noted at the time of the inspection. |
0656857540 | 2007-05-15 | Production Wells | No Violations | Case # 07-003, called by Jeff Harmon to inspect site after final grading of oil cleanup. Area is seeded and finish graded. NOV in compliance. |
1099413921 | 2004-11-02 | Production Wells | No Violations | Well is equipped with pumpjack, rods and tubing. 2-100 and 1-50 barrel tanks and separator in battery. Rain 60 degrees. |
1174572831 | 2007-03-21 | Production Wells | Violations Noted | Case # 07-003, Complaint called in by Rita Raimer through Attorney Generals office. Paraffin from steaming rods and tubing was buried at well site. MFC removed one dump truck load of soil and paraffin from well head and ten feet south of well head. Soil was replaced with a mixture of sand and top soil. Rough graded area due to wet conditions. MFC will finish grade and seed when ground conditions are dry. Rain, 35 degrees. |
2064328639 | 2012-01-24 | Production Wells | No Violations | On 01/24/2012, DNR Inspector Richard Skidmore completed a production well inpsection status check for DNR Ray Wallace. The lease road, tank battery, and well head locations are in compliance with 1501:9-9-05. Inspection passed. |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
1174572831 | US-OH-104612 | 2007-03-22 | Well insufficiently equipped to prevent escape of oil and gas |
For data sources see[9]