If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-103-25043 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.23,"lon":-81.88,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Medina | |
| Municipality: Liverpool Township | |
| Operator Name: CEDAR VALLEY ENERGY INC | |
| Well Pad ID: | |
| Farm/Lease Name: PRIDE | |
| License Status: Producing | |
| License Date: 2012-11-19 | |
| Spud Date: 2012-12-19 | |
| Spud Drilling Contractor: POULSON DRILLING | |
| Final Drill Date: 2012-12-18 | |
| Well Total Depth: 3220.00 ft | |
| Configuration: Vertical | |
| Latitude: 41.230000 | |
| Longitude: -81.880000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2012-11-19 | Proposed Formations:CLINTON, Issued Date:11/19/2012, Expired Date:11/19/2014 12:00:00 PM, Drilling unit acres:104.12, Proposed Well Type:OG, Proposed Well Class:POOL |
| Reached Total Depth | 2012-12-18 | |
| Completion Report Received | 2013-02-19 | |
| Construction Permit Expires | 2013-11-19 | |
| Record Last Modified | 2018-01-26 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2013-02-20 | 3043 | 3064 | 18 |
| 3043 | 3064 | 18 | |
| 3043 | 3064 | 18 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| 2013-01-29 | H2O | 0 | 1661 Bbl | 40700 | Universal Well Services Inc. | Cedar Valley Energy hydro frac using fresh water and 50 sks. of 80/100 mesh sand and 380 sks. of 20/40 mesh sand. No nitrogen was used. |
| 2013-01-29 | H2O | 15 | 69773 Gal | 40700 | Universal Well Services Inc. |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2013 | CEDAR VALLEY ENERGY INC | 0.00 | 0.00 | 0 |
| 2014 | CEDAR VALLEY ENERGY INC | 0.00 | 0.00 | 0 |
| 2015 | CEDAR VALLEY ENERGY INC | 6687.00 | 582.00 | 365 |
| 2016 | CEDAR VALLEY ENERGY INC | 8541.00 | 396.00 | 365 |
| 2017 | CEDAR VALLEY ENERGY INC | 13885.00 | 290.00 | 365 |
| 2018 | CEDAR VALLEY ENERGY INC | 14311.00 | 320.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2013 | CEDAR VALLEY ENERGY INC | Brine | 0 | 0 |
| 2014 | CEDAR VALLEY ENERGY INC | Brine | 43 | 0 |
| 2015 | CEDAR VALLEY ENERGY INC | Brine | 60 | 365 |
| 2016 | CEDAR VALLEY ENERGY INC | Brine | 60 | 365 |
| 2017 | CEDAR VALLEY ENERGY INC | Brine | 63 | 365 |
| 2018 | CEDAR VALLEY ENERGY INC | Brine | 0 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| 1355863754 | 2012-12-18 | Drill / Deepen / Reopen | No Violations | I inspected this drilling site location and found that Poulsen Drilling Rig #1 was moving in on the location. The drilling pad area was already constructed and the drilling rig, doghouse and pumps were already in place. The drilling permit was properly displayed in the doghouse. Drillers Transport Services had tractor trailer flatbed trucks on location delivering equipment and pipe tubs. The lease road was well constructed with stone and well maintained and there was no mud being dragged out onto S.R. 303. The proper diameter plastic culvert pipe was installed at the stream crossing and water was flowing through it. Silt fence was installed at various locations around the drilling site and along the lease road to prevent silt runoff. There was a sign in place at the entrance to the lease road identifying the drilling site location. Roy Poulsen was on site to direct all operations. |
| 1357146562 | 2012-12-20 | Urban Drill / Deepen / Reopen | No Violations | I arrived on the drilling site location and found that Poulson Drilling Rig #1 had drilled a 14.750 in. conductor hole on fluid to a depth of 80 ft. the previous day and had already had the conductor casing cemented in place. I was previously notified that the conductor casing was to be cemented, but I could not be on site to inspect the cementing process. I visually inspected the cemented conductor casing and observed that there was cement at the surface around the conductor casing. I spoke to the tool pusher, Roy Poulson and he verified that the cement did circulated to the surface during the cementing job. A total of 63 ft. of new 11.750 in. sconductor casing was cemented in place. Petroset Cementing was the contractor that performed the cementing job and used 130 sks. of Class A cement with 3% CaCl. The water temperature for the cement was 46 deg. F. and the pH was 6.8. The cement plug was displaced with 5.5 bbl. of fresh water and there was a 6 bbl. return of cement to the surface. |
| 1357587651 | 2012-12-21 | Urban Drill / Deepen / Reopen | No Violations | I inspected this drilling operation and found that Poulson Drilling Co. Rig #1 had drilled an 11 in. hole on fluid to a depth of 538 ft. Poulson Drilling had already placed 516 ft. of new 8.625 in. surface casing into the well and used a total of three centalizers placed at various joints on the casing string. Petroset Cementing arrived on location and hooked up their cementing equipment. They then began to pump fresh water in order to break circulation. The temperature of the fresh water was 39 degrees F. and the pH was 6.8. This was a two stage cement job so Petroset first mixed and pumped 125 sks. of Lite cement with 3% CaCl and 3/4 sack of Cell-O-Flake for the first stage. The first stage cement plug was dropped down and Petroset then mixed 75 sks. of Class A cement with 3% CaCl and 3/4 sack of Cell-O-Flake for the second stage. The second cement plug was down at 9:55 am and was displaced with 31.5 bbls. of fresh water with a return of 13 bbls. I did observe cement circulate back to the surface during the cementing of the surface casing. |
| 1357663427 | 2012-12-29 | Urban Drill / Deepen / Reopen | No Violations | I was on site at this drilling operation to inspect the cementing of the production casing string. When I arrived, the crew of Poulson Drilling Co. Rig #1 had completed drilling a 7.875 in. hole on air to a depth of 3220 ft. A total of 3192 ft. of used 4.5 in. production casing including a new 10 ft. shoe joint with guide shoe was installed in the well. A total of ten centalizers were installed on various joints throughout the production string. Universal Well Services arrived on site and rigged up their cementing equipment and began to pump fresh water in order to break circulation. Universal then pumped their Gel Sweep product in order to clean the hole of mud and debris and then pumped 6 bbl. of CaCl and their Flow Stop product ahead of the cement. Next, Universal mixed and pumped 125 sks. of Unitropic 10-4-2 cement into the well and displaced the cement plug with 51 bbls. of fresh water. The plug was landed at 1:06 am and a pressure of 1500 psi. was held on the plug for two minutes to verify that the plug held in place. |
| 1359655155 | 2013-01-29 | Production Wells | No Violations | I was on site at 8:30 am to inspect the hydro frac well stimulation activities of Universal Well Services. Hagan Well Service had a service rig on site to assist with the rig up and rig down of the frac head and piping. During the initial phase of the frac, a hydraulic line blew apart on one of the frac pump trucks and the frac job had to be shut down. Before the complete shutdown, the sand that was already being pumped downhole was pumped into the formation and the hole was swept clean with a hole cleaning solution. The job was then shut down while the crew waited for a mechanic to arrive with a new hose. The hydro frac operations commenced again at 11:45 am and were completed at approx. 1:30 pm. A total of 40,700 lbs. of 20/40 sand was pumped and 1661 bbl. of fresh water. There was some mud and stone being dragged out onto S.R. 303 as the frac trucks were leaving the location, but the well operator had a contractor on site that immediately went out and scraped the road clean with a skid steer loader. |
| 1980804674 | 2013-10-01 | Production Wells | No Violations | Inspected production well on 10/01/2013. Well is fenced in and equipped with a pump jack and an electric motor. Tank battery contains 2 tanks (1-100 bbl, 1-50 bbl) and a separathor within an earthen dike. Well identification is properly displayed. No problems were noted at the time of inspection. |
For data sources see[9]