X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-111-21943

Well Details

Well ID: 34-111-21943
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Summit Township
Operator Name: ANDERSON EARL E
Well Pad ID:
Farm/Lease Name: ANDERSON
License Status: Domestic Well
License Date: 1982-09-24
Spud Date: 1981-04-02
Spud Drilling Contractor:
Final Drill Date: 1981-04-11
Well Total Depth: 3950.00 ft
Configuration: Vertical
Latitude: 39.780000
Longitude: -81.270000

For data sources see[1]

Well History

Well Status Well Status Date Comment
Original Spud 1981-04-02
Completed 1981-04-11
Reached Total Depth 1981-04-11
CO 1982-09-24 1 HOPEWELL OIL & GAS DEV CO GeoDate 9/24/82
CO 1995-12-14 5331 ANDERSON EARL E GeoDate 9/24/82
Record Last Modified 2010-01-27

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2006-09-11 2548 3766 32
2548 3766 32
2548 3766 32

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
ACID 0 800 Gal 15000 & 15 GAL. PRO LOCK.

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1984 HOPEWELL OIL & GAS DEVELOPMENT 5118.00 69.00 365
1985 HOPEWELL OIL & GAS DEVELOPMENT 3003.00 65.00 0
1986 HOPEWELL OIL & GAS DEVELOPMENT 3443.00 296.00 365
1987 HOPEWELL OIL & GAS DEVELOPMENT 1423.00 383.00 365
1988 HOPEWELL OIL & GAS DEVELOPMENT 2200.00 140.00 365
1989 HOPEWELL OIL & GAS DEVELOPMENT 2509.00 222.00 365
1990 HOPEWELL OIL & GAS DEVELOPMENT 1869.00 86.00 365
1991 HOPEWELL OIL & GAS DEVELOPMENT 1414.00 0.00 365
1992 HOPEWELL OIL & GAS DEVELOPMENT 1335.00 54.00 325
1993 HOPEWELL OIL & GAS DEVELOPMENT 1375.00 0.00 325
1994 HOPEWELL OIL & GAS DEVELOPMENT 568.00 0.00 325
1995 HOPEWELL OIL & GAS DEVELOPMENT 859.00 0.00 334

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1984 HOPEWELL OIL & GAS DEVELOPMENT Brine 0 365
1985 HOPEWELL OIL & GAS DEVELOPMENT Brine 0 0
1986 HOPEWELL OIL & GAS DEVELOPMENT Brine 25 365
1987 HOPEWELL OIL & GAS DEVELOPMENT Brine 10 365
1988 HOPEWELL OIL & GAS DEVELOPMENT Brine 18 365
1989 HOPEWELL OIL & GAS DEVELOPMENT Brine 0 365
1990 HOPEWELL OIL & GAS DEVELOPMENT Brine 0 365
1991 HOPEWELL OIL & GAS DEVELOPMENT Brine 0 365
1992 HOPEWELL OIL & GAS DEVELOPMENT Brine 0 325
1993 HOPEWELL OIL & GAS DEVELOPMENT Brine 0 325
1994 HOPEWELL OIL & GAS DEVELOPMENT Brine 0 325
1995 HOPEWELL OIL & GAS DEVELOPMENT Brine 0 334

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
1341838526 2012-07-09 Production Wells No Violations Inspection of the well head found the following equipment, 4.5 production casing, 2.875 intermediate string, 1.5 tubing & rods with the production valves open. A 100 barrel tank and separator are present in dike area . Inspector will note that the dike will not meet SPCC rules and identification needs put up.

For data sources see[9]

References