If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-111-24037 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.75,"lon":-81.13,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Monroe | |
| Municipality: Center Township | |
| Operator Name: PROFIT ENERGY COMPANY | |
| Well Pad ID: | |
| Farm/Lease Name: DUFFY | |
| License Status: Producing | |
| License Date: 2006-06-02 | |
| Spud Date: 2006-07-25 | |
| Spud Drilling Contractor: MONROE DRILLING OPERATION, LLC | |
| Final Drill Date: 2006-08-11 | |
| Well Total Depth: 2670.00 ft | |
| Configuration: Vertical | |
| Latitude: 39.750000 | |
| Longitude: -81.130000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2006-06-02 | Proposed Formations:BEREA/OHIO SHALE, Issued Date:6/2/2006, Expired Date:6/2/2007 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
| Original Spud | 2006-07-25 | RBDMS Rec |
| Completed | 2006-08-11 | RBDMS Rec |
| Reached Total Depth | 2006-08-11 | RBDMS Rec |
| Completion Report Received | 2007-01-16 | RBDMS Rec |
| Construction Permit Expires | 2007-06-02 | RBDMS Rec |
| Record Last Modified | 2015-09-24 | RBDMS Rec |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2007-04-03 | 2130 | 2140 | 30 |
| 2007-04-03 | 2538 | 2584 | 24 |
| 2130 | 2140 | 30 | |
| 2406 | 2438 | 37 | |
| 2538 | 2584 | 24 | |
| 2623 | 2637 | 4 | |
| 2130 | 2140 | 30 | |
| 2007-04-03 | 2406 | 2438 | 37 |
| 2007-04-03 | 2623 | 2637 | 4 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| H2O | 15 | 72000 Gal | 0 | 800 GALLONS HCL ACID |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2007 | PROFIT ENERGY COMPANY | 1853.00 | 105.00 | 365 |
| 2008 | PROFIT ENERGY COMPANY | 1981.00 | 36.00 | 365 |
| 2009 | PROFIT ENERGY COMPANY | 2158.00 | 0.00 | 365 |
| 2010 | PROFIT ENERGY COMPANY | 2208.00 | 24.00 | 365 |
| 2011 | PROFIT ENERGY COMPANY | 1846.00 | 0.00 | 365 |
| 2012 | PROFIT ENERGY COMPANY | 2053.00 | 0.00 | 366 |
| 2013 | PROFIT ENERGY COMPANY | 1807.00 | 0.00 | 365 |
| 2014 | PROFIT ENERGY COMPANY | 817.00 | 34.00 | 365 |
| 2015 | PROFIT ENERGY COMPANY | 449.00 | 0.00 | 365 |
| 2016 | PROFIT ENERGY COMPANY | 484.00 | 0.00 | 365 |
| 2017 | PROFIT ENERGY COMPANY | 333.00 | 36.00 | 365 |
| 2018 | PROFIT ENERGY COMPANY | 344.00 | 0.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2007 | PROFIT ENERGY COMPANY | Brine | 190 | 365 |
| 2008 | PROFIT ENERGY COMPANY | Brine | 54 | 365 |
| 2009 | PROFIT ENERGY COMPANY | Brine | 30 | 365 |
| 2010 | PROFIT ENERGY COMPANY | Brine | 0 | 365 |
| 2011 | PROFIT ENERGY COMPANY | Brine | 0 | 365 |
| 2012 | PROFIT ENERGY COMPANY | Brine | 0 | 366 |
| 2013 | PROFIT ENERGY COMPANY | Brine | 0 | 365 |
| 2014 | PROFIT ENERGY COMPANY | Brine | 44 | 365 |
| 2015 | PROFIT ENERGY COMPANY | Brine | 0 | 365 |
| 2016 | PROFIT ENERGY COMPANY | Brine | 37 | 365 |
| 2017 | PROFIT ENERGY COMPANY | Brine | 78 | 365 |
| 2018 | PROFIT ENERGY COMPANY | Brine | 0 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -247195636 | 2009-3-5 0:00:0 | PW | No Violations | |
| -601051242 | 2007-2-21 0:00: | PL | No Violations | |
| 0247195636 | 2009-03-05 | Production Wells | No Violations | WELL IS SUPPLIED WITH A RABBIT WELL AND A 100BBL TANK.AN EROSION ISSUE.WILL NEED TO BE GRADED SEEDED /FERTILIZED AND MULCHED.WILL CONTACT OWNER. |
| 0601051242 | 2007-02-21 | Preliminary Restoration | No Violations | Restoration work at site satisfactory. |
| 0963351472 | 2018-10-01 | Production Wells | No Violations | On this day, I found the well equipped with 4.5 inch diameter casing and 1.9 inch diameter tubing with the production valves open. It is setup to be produced by means of a plunger lift system. The production facility consists of (1) 100 barrel steel tank, drip tank, vertical separator, domestic meter, and orifice meter all contained within an earthen dike. The production records are current and the tank is properly identified. It will be noted that there is some erosion occurring along the lease road, and the company will be contacted to address the issue. |
| 1342541550 | 2012-07-17 | Production Wells | No Violations | Inspection of the well head found the following equipment, 7 surface casing, 4.5 production casing , 1.5 tubing with the production valves open and the well being produced by the means of a plunger lift system. A 100 barrel tank and separator along with a gas meter with a current chart are present in an established dike with proper well identification. |
| 963351472 | 2018-10-1 0:00: | PW | No Violations | 0.40 |
For data sources see[9]