If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-111-24234 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.7,"lon":-81.15,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Wayne Township | |
Operator Name: PROFIT ENERGY COMPANY | |
Well Pad ID: | |
Farm/Lease Name: COWEN ETAL | |
License Status: Producing | |
License Date: 2008-12-05 | |
Spud Date: 2008-12-15 | |
Spud Drilling Contractor: MONROE DRILLING OPERATION, LLC | |
Final Drill Date: 2008-12-17 | |
Well Total Depth: 2400.00 ft | |
Configuration: Vertical | |
Latitude: 39.700000 | |
Longitude: -81.150000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2008-12-05 | Proposed Formations:BEREA AND OHIO SHALE, Issued Date:12/5/2008, Expired Date:12/5/2009 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2008-12-17 | |
Completion Report Received | 2009-09-23 | |
Construction Permit Expires | 2009-12-05 | |
Record Last Modified | 2015-09-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2009-12-29 | 1727 | 2280 | 66 |
1727 | 2280 | 66 | |
1727 | 2280 | 66 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
GEL | 15 | 84000 Gal | 0 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2009 | PROFIT ENERGY COMPANY | 595.00 | 131.00 | 170 |
2010 | PROFIT ENERGY COMPANY | 3530.00 | 807.00 | 365 |
2011 | PROFIT ENERGY COMPANY | 2915.00 | 436.00 | 365 |
2012 | PROFIT ENERGY COMPANY | 2720.00 | 352.00 | 366 |
2013 | PROFIT ENERGY COMPANY | 3410.00 | 206.00 | 365 |
2014 | PROFIT ENERGY COMPANY | 2289.00 | 174.00 | 365 |
2015 | PROFIT ENERGY COMPANY | 1597.00 | 154.00 | 365 |
2016 | PROFIT ENERGY COMPANY | 1272.00 | 163.00 | 365 |
2017 | PROFIT ENERGY COMPANY | 1152.00 | 89.00 | 365 |
2018 | PROFIT ENERGY COMPANY | 1124.00 | 78.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2009 | PROFIT ENERGY COMPANY | Brine | 560 | 170 |
2010 | PROFIT ENERGY COMPANY | Brine | 60 | 365 |
2011 | PROFIT ENERGY COMPANY | Brine | 0 | 365 |
2012 | PROFIT ENERGY COMPANY | Brine | 30 | 366 |
2013 | PROFIT ENERGY COMPANY | Brine | 60 | 365 |
2014 | PROFIT ENERGY COMPANY | Brine | 7 | 365 |
2015 | PROFIT ENERGY COMPANY | Brine | 15 | 365 |
2016 | PROFIT ENERGY COMPANY | Brine | 13 | 365 |
2017 | PROFIT ENERGY COMPANY | Brine | 1 | 365 |
2018 | PROFIT ENERGY COMPANY | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-764270799 | 2010-10-28 0:00 | PL | No Violations | 1.00 |
0158528495 | 2008-12-17 | Drill / Deepen / Reopen | No Violations | DRILL RIG WAS TRIPPING DRILL PIPE OUT OF HOLE.GETTING TO RUN 4.5 CASING.NO VIOLATION NOTED. |
0764270799 | 2010-10-28 | Preliminary Restoration | No Violations | On day of inspection well is supplied with a rabbet system and 7cas,4.5cas and 1.5tubing.There is a 100bbl tank and dike and id are in place.Vegetation is sufficient. Preliminary restoration passed. |
1424782543 | 2016-11-07 | Production Wells | No Violations | On site inspection found the well equipped with 4.5 production casing-1.5 production tubing with the production valves open and the well set up to be produced by the means of a plunger lift system. On location near the well head is a single 100 barrel production tank along with a mechanical separator and gas sales meter with proper well identification posted. |
158528495 | 2008-12-17 0:00 | DD | No Violations |
For data sources see[9]