If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-111-24355 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.67,"lon":-81.18,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Washington Township | |
Operator Name: GULFPORT APPALACHIA LLC | |
Well Pad ID: US-OH-000472 | |
Farm/Lease Name: GARY GREEN N WSH MN | |
License Status: Producing | |
License Date: 2014-09-26 | |
Spud Date: 2014-05-15 | |
Spud Drilling Contractor: NOMAC DRILLING CORP | |
Final Drill Date: 2014-12-03 | |
Well Total Depth: 17688.00 ft | |
Configuration: Horizontal | |
Latitude: 39.670000 | |
Longitude: -81.180000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2012-08-10 | Proposed Formations:UTICA SHALE, Issued Date:8/10/2012, Expired Date:8/10/2014 12:00:00 PM, Drilling unit acres:445.398, Proposed Well Type:OG, Proposed Well Class:EDPW |
APP | 2013-11-04 | Proposed Formations:UTICA SHALE-POINT PLEASANT, Issued Date:11/4/2013, Expired Date:11/4/2015 12:00:00 PM, Drilling unit acres:471.911, Proposed Well Type:OG, Proposed Well Class:EDPW |
APP | 2014-07-10 | Proposed Formations:QUEENSTON, Issued Date:7/10/2014, Expired Date:7/9/2016 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:SWD, Proposed Well Class:SWIW |
Change of Owner | 2014-09-22 | Operator changed from 8793, HG ENERGY LLC to 9193, AMERICAN ENERGY UTICA LLC |
APP | 2014-09-26 | Proposed Formations:POINT PLEASANT, Issued Date:9/26/2014, Expired Date:9/25/2016 12:00:00 PM, Drilling unit acres:524.579, Proposed Well Type:OG, Proposed Well Class:POOL |
Correction to Well | 2014-10-24 | CORRECTION TO LEASE NAME. |
Reached Total Depth | 2014-12-03 | |
Change of Owner | 2015-06-19 | Operator changed from 9193, AMERICAN ENERGY UTICA LLC to 8799, GULFPORT ENERGY CORPORATION |
Construction Permit Expires | 2016-09-25 | |
Completion Report Received | 2018-01-25 | |
Record Last Modified | 2018-06-27 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2018-02-06 | 10299 | 10445 | 50 |
2018-02-06 | 17378 | 17523 | 50 |
17378 | 17523 | 50 | |
10299 | 10445 | 50 | |
10299 | 10445 | 50 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 03/13/2017 | 03/21/2017 | 9104 | 10,454,500.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Gulfport | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 89.3034 | 87,243,100.0 |
40/70 white sand | Muskie | PROPPING AGENT | CRYSTALLINE SILICA IN THE FORM OF QUARTZ | 14808-60-7 | 100 | 9.51554 | 9,296,000.0 | |
B-84 | X-Chem | Biocide | Didecyl dimethyl ammonium chloride | 7173-51-5 | 10 | 0.00301672 | 2947.12 | |
n-Alkyl(C12-C16) dimethyl benzyl ammonium chloride | 68424-85-1 | 10 | 0.00301672 | 2947.12 | ||||
Glutaraldehyde | 111-30-8 | 30 | 0.00905016 | 8841.36 | ||||
Ethanol | 64-17-5 | 5 | 0.00150836 | 1473.56 | ||||
SFR-470 | X-Chem | Friction Reducer | Ammonium chloride | 12125-02-9 | 13 | 0.0109748 | 10721.6 | |
Petroleum distillates, hydrotreated light | 64742-47-8 | 30 | 0.0253264 | 24742.1 | ||||
Alcohols, C12-16, ethoxylated | 68551-12-2 | 1.5 | 0.00126632 | 1237.11 | ||||
Alcohols, C10-16, ethoxylated | 68002-97-1 | 1.5 | 0.00126632 | 1237.11 | ||||
Alcohols, C12-14, ethoxylated | 68439-50-9 | 1.5 | 0.00126632 | 1237.11 | ||||
28% HCl Acid | X-Chem | ACID | HYDROCHLORIC ACID | 7647-01-0 | 32 | 0.0647381 | 63244.5 | |
WATER | 7732-18-5 | 100 | 0.202307 | 197639 | ||||
NEFE-210 | X-Chem | Acid Non-Emulsifier and Iron Control | Cocamide DEA | 68603-42-9 | 5 | 0.00006258 | 61.135 | |
Methyl alcohol | 67-56-1 | 35 | 0.000438055 | 427.948 | ||||
2-Ethyl hexanol | 104-76-7 | 10 | 0.000125159 | 122.271 | ||||
Propargyl alcohol | 107-19-7 | 5 | 0.00006258 | 61.135 | ||||
Acetic acid | 64-19-7 | 65 | 0.000813531 | 794.761 | ||||
Tall oil fatty acid | 61790-12-3 | 5 | 0.00006258 | 61.135 | ||||
Alcohols, C12-16, ethoxylated | 68551-12-2 | 5 | 0.00006258 | 61.135 | ||||
Other Chemical(s) | Listed Above | See Trade Name(s) List | Alcohols, C12-16, ethoxylated | 68551-12-2 | 1.5 | 0.00126632 | 1237.11 | |
Ethanol | 64-17-5 | 5 | 0.00150836 | 1473.56 | ||||
Cocamide DEA | 68603-42-9 | 5 | 0.00006258 | 61.135 | ||||
Tall oil fatty acid | 61790-12-3 | 5 | 0.00006258 | 61.135 | ||||
2-Ethyl hexanol | 104-76-7 | 10 | 0.000125159 | 122.271 | ||||
Ammonium chloride | 12125-02-9 | 13 | 0.0109748 | 10721.6 | ||||
Propargyl alcohol | 107-19-7 | 5 | 0.00006258 | 61.135 | ||||
Methyl alcohol | 67-56-1 | 35 | 0.000438055 | 427.948 | ||||
Alcohols, C12-14, ethoxylated | 68439-50-9 | 1.5 | 0.00126632 | 1237.11 | ||||
WATER | 7732-18-5 | 100 | 0.202307 | 197639 | ||||
Didecyl dimethyl ammonium chloride | 7173-51-5 | 10 | 0.00301672 | 2947.12 | ||||
Alcohols, C12-16, ethoxylated | 68551-12-2 | 5 | 0.00006258 | 61.135 | ||||
Alcohols, C10-16, ethoxylated | 68002-97-1 | 1.5 | 0.00126632 | 1237.11 | ||||
n-Alkyl(C12-C16) dimethyl benzyl ammonium chloride | 68424-85-1 | 10 | 0.00301672 | 2947.12 | ||||
100 mesh sand | Muskie | PROPPING AGENT | CRYSTALLINE SILICA | 14808-60-7 | 100 | 0.844893 | 825400 | |
SC-30 | X-Chem | Scale Inhibitor | Sodium Hydroxide | 1310-73-2 | 1.5 | 0.000269829 | 263.604 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2017-03-21 | H2O | 15 | 6338 Bbl | 275100 | EVOLUTION WELL SERVICE | STAGE 4040
STAGES 2-39 SEE IMAGES |
2017-03-13 | H2O | 15 | 7460 Bbl | 270490 | EVOLUTION WELL SERVICE | STAGE 1/40
STAGES 2-39 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | GULFPORT ENERGY CORPORATION | 2252903 | 0 | 222 |
2018 | GULFPORT ENERGY CORPORATION | 1474912 | 0 | 363 |
2019 | GULFPORT ENERGY CORPORATION | 244084 | 0 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | GULFPORT ENERGY CORPORATION | Brine | 33123 | 222 |
2018 | GULFPORT ENERGY CORPORATION | Brine | 16766 | 363 |
2019 | GULFPORT ENERGY CORPORATION | Brine | 2632 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1387776430 | 2017-6-27 0:00: | PL | No Violations | 0.50 |
-170514522 | 2014-12-21 0:00 | DD | No Violations | |
-185035578 | 2017-3-6 0:00:0 | PL | No Violations | 0.50 |
-1912053948 | 2020-4-21 0:00: | PW | No Violations | 1.00 |
-892441161 | 2018-3-5 0:00:0 | PW | No Violations | 0.20 |
0170514522 | 2014-12-21 | Drill / Deepen / Reopen | No Violations | Nomac rig#82 was on site and they were tripping out of hole making a drill bit change and they were at a depth of 9389. |
0185035578 | 2017-03-06 | Preliminary Restoration | No Violations | Preliminary Restoration status check inspection accompanied by ODNR County Inspector Austin Gutridge. The area affected by the well pad construction meets ORC 1509.072 with vegetation established and erosion control in place. The lease road is stoned and in good repair. Signage is posted at the well pad entrance. Evolution Energy Service DC turbine electric powered stimulation pump fleet is on location and has stimulated 19 stages on the 5-H well. Red Dirt rentals completion master valves are in place on each of the 5 wells on location. Nine Energy completion service is on location perforating each stage of the well bores to be stimulated with 5 clusters of 10 shots each cluster. The well completion iron is 15,000 psi rated capacity. All completion equipment is located on secondary polymer containment with the well pad berm serving as the primary containment with the perimeter drain valves in the closed position. |
0463818913 | 2014-10-29 | Drill / Deepen / Reopen | No Violations | Status check inspection on the drilling progress found Nomac Drilling rig # 82 on location drilling the 12.250 1st intermediate well bore at a depth of 2,691 with a projected total depth of this well bore stage of 8,175. At a proposed depth of 4,852 the company will implement a 12 degree borehole nudge in the direction of 79 degrees. |
0892441161 | 2018-03-05 | Production Wells | No Violations | On this day, I accompanied ODNR Inspector William Stolarik. Please refer to his comments for a detailed report. The lease road is gated and an EQT midstream production facility is situated on the righthand side, prior to the well pad. There is an emergency shutdown button on the left, at the entrance. The well is equipped with annular pressure monitoring and an emergency shutdown button is located at the wellhead. There are (6) gas processing units on the left of the pad, and all are equipped with an emergency shutdown button. At the backside of the pad are (4) 400 barrel steel tanks within containment. |
1099326662 | 2018-03-05 | Production Wells | No Violations | Producing well status check inspection found the well head designed to produce from the tubing well head above the B-Section and casing head section. In the tubing section vertically there is a total of (2) manually operated valves then the tubing flow cross, attached to the tubing flow cross downstream is a third manual valve then a Emergency Shut Down (ESD) valve with remotely controlled switches at multiple locations on location including at the well head and gas processing units along with the production facility and entry point of the location. On location there is a total of (6) active well heads with annular pressure monitoring in place on each well head. The said well has annular pressure gauges in place with the valves in the open position. The annular pressure between the 13.375 casing and 9.625casing reads 260 psi and between the 9.625 casing and the 5.5 casing 1,000 psi. Addressing the well support equipment on location- at the entry point of the location is a midstream operation operated by EQT Company, on the left hand side of the well pad is a total of (6) gas processing units one each for every active well on the pad. At the left rear corner of the well pad is the production facility consisting of a total of (4) steel construction tanks each with a total fluid volume of 400 barrels capacity, the tanks are situated inside a polymer lined steel containment dike area. The well pad does have a perimeter earthen berm. Proper well identification is posted at the each well and the tank battery as well as the entry point of the lease road and well pad. |
1387776430 | 2017-06-27 | Preliminary Restoration | No Violations | Preliminary Restoration status check inspection found the well site meets ORC 1509.072 with vegetation established and erosion control in place. The lease road is in good repair and graveled from County Road 12 to the well pad. There is a midstream distribution sales point located on the South East side of the well pad near the well pad entry point, Rice Energy is the Mid Stream operator and there is a glycol dehydration unit present on the mid stream site. Situated on the well pad is a total of( 6) wells all now in production with production trees in place and the well head production valves in the open position. The wells are all equipped with annular monitoring pressure gauges. The wells are selling into gas processing units with a total of (6 )gas processing units on location one for each well. Also present on the West side of the well pad is the production fluid storage area consisting of a total of (4) steel construction 400 barrel capacity production tanks located inside a polymer lined steel containment dike area. The pumper is on site and has indicted they are shipping 2,100 barrels of production flow back fluid per every 24 hours. Identification is posted at each well and at the end of the lease road. Safety shut down points are at each well along with at the production facility and well pad entry point. |
1400604445 | 2014-05-20 | Casing String Witnessed | No Violations | The said well was spudded on 12/28/13 with 100 of 20 conductor being set by HAD drilling with no annular space. On 05/20/14 Decker drilling rig #10 has drilled a 17.5 surface borehole to 1085 and set 1075 of 13.375 surface casing with a guide shoe and 5 centralizers ran with Baker Hughes cement services on location to cement the casing with 847 sacks of class A .5% calcium .25 pound per sack cement with the casing pressure tested to 300 psi over lift pressure upon the landing of the plug with 32 barrels of cement returns to surface. |
1411758082 | 2014-01-02 | Drill / Deepen / Reopen | No Violations | The said well was spudded on 12/28/13 with 100 of 20 conductor being set by HAD drilling with no annular space. |
1441161209 | 2017-03-06 | Preliminary Restoration | No Violations | Preliminary Restoration status check inspection accompanied by ODNR County Inspector Austin Gutridge. The area affected by the well pad construction meets ORC 1509.072 with vegetation established and erosion control in place. The lease road is stoned and in good repair. Signage is posted at the well pad entrance. Evolution Energy Service DC turbine electric powered stimulation pump fleet is on location and has stimulated 19 stages on the 5-H well. Red Dirt rentals completion master valves are in place on each of the 5 wells on location. Nine Energy completion service is on location perforating each stage of the well bores to be stimulated with 5 clusters of 10 shots each cluster. The well completion iron is 15,000 psi rated capacity. All completion equipment is located on secondary polymer containment with the well pad berm serving as the primary containment with the perimeter drain valves in the closed position. |
463818913 | 2014-10-29 0:00 | DD | No Violations | 1.20 |
For data sources see[10]