Well Details

Well ID: 34-111-24414
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Bethel Township
Operator Name: ANTERO RESOURCES CORPORATION
Well Pad ID: US-OH-000840
Farm/Lease Name: HERCHER NORTH
License Status: Plugged Back
License Date: 2013-10-24
Spud Date: 2013-08-06
Spud Drilling Contractor:
Final Drill Date:
Well Total Depth:
Configuration: Vertical
Latitude: 39.670000
Longitude: -81.240000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-08-19 Proposed Formations:TRENTON-BLACK RIVER, Issued Date:8/19/2013, Expired Date:8/19/2015 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2013-09-10 Proposed Formations:POINT PLEASANT, Issued Date:9/10/2013, Expired Date:9/10/2015 12:00:00 PM, Drilling unit acres:440.2, Proposed Well Type:OG, Proposed Well Class:EDPW
APP 2013-10-24 Proposed Formations:TRENTON/BLACK RIVER, Issued Date:10/24/2013, Expired Date:10/24/2015 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
Plugged Back 2013-10-27
Change of Owner 2015-02-13 Operator changed from 8856, HALL DRILLING LLC (OIL & GAS) to 8943, ANTERO RESOURCES CORPORATION
Construction Permit Expires 2015-10-24
Record Last Modified 2017-02-10

For data sources see[2]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 02/05/2014 03/03/2014 8783 11,550,600.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Sand (Proppant) Universal Proppant Crystalline Silica in the form of Quartz 14808-60-7 99.9 10.4788 11,352,600.0
Slurry Gel, WGA-7 SLR PfP Technology Gel Petroleum Distillate 64742-47-8 55 0.0317585 34406.7
Surfactant 154518-36-2 5 0.00288713 3127.88
Clay 14808-60-7 5 0.00288713 3127.88
Guar Gum 9000-30-0 50 0.0288713 31278.8
Scale Inhibitor, Scale Hib A Nalco Scale Inhibitor Ethylene Glycol 107-21-1 30 0.00506205 5484.15
Acid Inhibitor, Unihib G GeoSafe Acid Inhibitor Short Chained Glycol Ether 112-34-5 60 0.000141456 153.252
Formaldehyde 50-00-0 1 0.00000236 2.554
Methanol 67-56-1 5 0.00001179 12.771
Thiourea 62-56-6 1 0.00000236 2.554
Ethoxylated alcohol 68002-97-1 35 0.00008252 89.397
Acetophenone 98-86-2 1 0.00000236 2.554
AP Breaker Sagar Gel Breaker Ammonium Persulfate 7727-54-0 100 0.00368844 3996
Water Hall Carrier/Base Fluid Water 7732-18-5 100 88.9704 96,389,300.0
Hydrochloric Acid (15%) Axiall Acidizing Hydrogen Chloride 7647-01-0 15 0.0539737 58474.3
Biocide, EC6116A Nalco Biocide Dibromoacetonitrile 3252-43-5 5 0.000550262 596.146
Polyethylene Glycol 25322-68-3 60 0.00660314 7153.75
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 30 0.00330157 3576.88
Friction Reducer, Unislick ST-50 CESI Chemical Friction Reducer Petroleum distillates, hydrotreated light 64742-47-8 30 0.0272582 29531.2

For data sources see[3]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2014 ANTERO RESOURCES CORPORATION Brine 38945 278
2015 ANTERO RESOURCES CORPORATION Brine 9890 365
2016 ANTERO RESOURCES CORPORATION Brine 6724 366
2017 ANTERO RESOURCES CORPORATION Brine 4255 365
2018 ANTERO RESOURCES CORPORATION Brine 4097 365
2019 ANTERO RESOURCES CORPORATION Brine 478 90

For data sources see[4] [5]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-119332069 2013-10-21 0:00 CS No Violations 3.20
-1304575248 2014-3-28 0:00: PW No Violations 0.50
-1336777605 2013-10-17 0:00 DD No Violations 1.50
-1595648646 2014-1-21 0:00: DD No Violations 0.50
-1863140505 2015-6-18 0:00: PL No Violations 1.00
-506642754 2015-6-18 0:00: PL No Violations 1.00
-836883178 2018-3-13 0:00: PW No Violations 0.30
0119332069 2013-10-21 Casing String Witnessed No Violations On 10/20/13 the 9.625 was set and the bottom section section below the DV tool at 4680 was set and cemented, the float did not hold and the cement head was shut in until the cement could cure. The plug did land properly.
0504589089 2013-10-21 Drill / Deepen / Reopen No Violations Accompanied Inspector Bill Stolarik on inspection. Went to site with the intention of witnessing a temperature log that was supposed to take place at 6:00 am. The logging truck was not there. Mr. Audi Miller said that it would be there at 8:00 am. Bill and I returned to site after checking other drilling sites, and the logging truck still wasnt there. We were then informed that it would be there by 12:00 pm.
0506642754 2015-06-18 Preliminary Restoration No Violations Preliminary Restoration follow up inspection found the restoration status is still showing up as active in the database and was signed off by myself on 02/26/2015. I once again have added the well GPS coordinates into the system also. Inspection of the well head found the following equipment present 5.5 production casing with the production valves open and selling into a 2 sales line. A total of 4 -400 barrel capacity tanks are present in a plastic lined metal constructed dike area. Chloride levels were tested at 4 random locations across the well pad with no levels showing up over 121 parts per million on a low level Quantab field strip test. Preliminary Restoration once again passed on this day. Also noted the well API # was superseded by 3411124414-01-00.
0557706335 2014-01-06 Drill / Deepen / Reopen No Violations Status check inspection found Falcon Drilling rig #17 has skidded back on the hole and is preparing to drill out from under the 9.625 casing with a current bit depth of 9093.
0829274093 2014-01-10 Drill / Deepen / Reopen No Violations Status check inspection on the current drilling progress found the current drilling depth to be 10,300 in the 8.5 horizontal well bore section. The horizontal kick off point was 8,029 and the bottom of the curve was 9,290.
0836883178 2018-03-13 Production Wells No Violations On this day, I found the well equipped with annular pressure monitoring devices. The surface pressure gauge is reading 100 pounds per square inch, and the 9.625 gauge is reading 0 pounds per square inch. There are (4) wells in production on this pad. All wells have concrete barriers surrounding them. The facility is gated with proper signage. There are (4) 400 barrel steel tanks within containment at the front right-side, prior to the pad, with an electronic shutdown button. There is a midstream facility at the front right-side of the pad, and (4) gas processing units beside it. The wellheads are not properly identified, but it will be noted that I spoke with Antero representative, Jonah Turner, during my inspection on another pad, and informed him to make sure that his operators have their wellheads identified with proper signage.
0936179148 2015-02-26 Preliminary Restoration No Violations Preliminary Restoration status check inspection found 4 wells total present on this pad at this time with the well head equipped with a production tree with the production valves in the open position selling into a gas processing unit equipped with a mechanical sand trap and USA Compression gas compressor set on the well location with a inline fluid separator and dryer system present. 4- 400 barrel production tanks are present near the well pad entrance supporting the wells on the pad, all located inside a mechanical dike area with proper well identification present at both the well head and tank battery area. Preliminary Restoration passed on this day.
1302692374 2020-5-29 0:00: PW No Violations 1.00
1304575248 2014-03-28 Production Wells No Violations Status check inspection to document that all completion plugs have been drilled out and 8,918 of 2.375 production tubing has been ran into the well bore and the well is now capable of production with 3rd party contractors on site completing the installation of the production equipment.
1336777605 2013-10-17 Drill / Deepen / Reopen No Violations Total depth at the time of inspection was 7741 ft. Spoke with company man Mr. Audie Miller. They were getting close to running their 9.625 in pipe.
1381870400 2013-10-15 Drill / Deepen / Reopen No Violations Status check inspection on the current drilling progress found the company currently drilling the 2nd intermediate bore hole using a 12.250 drill bit with a current depth of 3194. In conversation with the company man on site it was discovered that they intended to drill their vertical test section on this current well, I informed Him they were not correctly permitted and spoke with the Division permitting section to confirm my suspicions.
1382917485 2013-10-27 Plug / Plug Back No Violations Plug back over verticle test section, plug set through the drill pipe with 550 of 2.375 tubing hung underneath. Frontier Drilling was the plug contractor but is not in the database.
1391650422 2014-02-05 Completion Testing No Violations Status check inspection on the completion process found the 1st stage to be completed being pressure tested and perforated on this day with the casing tested to 6,900 psi and the toe sleeve then opened followed by 50 perforations being deployed in 5 intervals between 18,045 and 17,942.
1392257285 2014-02-12 Completion Testing No Violations Status check inspection on the completion process found Wise coil tubing services moving in to drill out a bridge plug set at 4,845 due to the plug setting down and becoming lodged in the casing, the plug was deployed and the perforating gun pulled out of the hole, Direct instructions were given to the company man on site to test the coil tubing Blow out preventer function and pressure test before commencing work over operations.
1538670803 2018-10-04 Production Wells No Violations Status check inspection found (4) wells present on the pad with all wells found to be in production. The lease road surface is stone construction and in good repair. There is a gate across the lease road with owner and well pad information present. The production facility is also along the lease road and not on the well pad. The production facility consists of (4) steel construction tanks capable of holding 400 fluid barrels capacity each. The tanks are situated inside a polymer lined steel containment dike area with hazard warning labels present. There is also an earthen berm around the production facility. Situated on the well pad is a large gas compressor. Addressing the well head the well is equipped with a lower A and upper B section with a production tree present. The production valves are in the open position. 2 diameter riser pipes are present with valves and gauges attached for annular pressure monitoring. The 13.375 well head section showed 80 pounds pressure and the 9.625 well head section showed zero pounds pressure. Also noted the South East slope of the well pad does have an earthen slip that is being addressed by the Division Engineering section. The slip has required 10,000 to 12,000 cubic yards of material to be removed. The company is remediating the slip under emergency stabilization guidelines under the well construction rules.
1595648646 2014-01-21 Drill / Deepen / Reopen No Violations The well bore total drilling depth to be drilled has been reached at 18,165 using a 8.5 bit. The drilling rig is running the production casing and should be cementing in the next 24 hours. No company man was present to get additional information, but called me later in the day.
1743344788 2014-02-06 Completion Testing No Violations Universal well services stimulating the well bore with a slick water fracture and Baker Hughes providing the wire line services with a solid frac plug set at 17,940 and 60 perforations shot in 6 intervals of 10 shots each.
1863140505 2015-06-18 Preliminary Restoration No Violations Preliminary Restoration Inspection of the well head found the following equipment present 5.5 production casing with the production valves open and selling into a 2 sales line. A total of 4 -400 barrel capacity tanks are present in a plastic lined metal constructed dike area. Chloride levels were tested at 4 random locations across the well pad with no levels showing up over 121 parts per million on a low level Quantab field strip test. Preliminary Restoration passed on this day.
504589089 2013-10-21 0:00 DD No Violations 2.00
557706335 2014-1-6 0:00:0 DD No Violations 0.70
829274093 2014-1-10 0:00: DD No Violations 1.20
936179148 2015-2-26 0:00: PL No Violations 1.00

For data sources see[6]