If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-111-24448 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.84,"lon":-81.28,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Seneca Township | |
Operator Name: ANTERO RESOURCES CORPORATION | |
Well Pad ID: US-OH-000851 | |
Farm/Lease Name: KEYLOR UNIT | |
License Status: Producing | |
License Date: 2014-02-26 | |
Spud Date: 2014-01-24 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2014-05-01 | |
Well Total Depth: 16407.00 ft | |
Configuration: Horizontal | |
Latitude: 39.840000 | |
Longitude: -81.280000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-01-15 | Proposed Formations:POINT PLEASANT, Issued Date:1/15/2014, Expired Date:1/15/2016 12:00:00 PM, Drilling unit acres:405.557, Proposed Well Type:OG, Proposed Well Class:EOUT |
APP | 2014-02-26 | Proposed Formations:POINT PLEASANT, Issued Date:2/26/2014, Expired Date:2/26/2016 12:00:00 PM, Drilling unit acres:415.101, Proposed Well Type:OG, Proposed Well Class:EOUT |
Reached Total Depth | 2014-05-01 | |
Correction to Well | 2015-01-09 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Completion Report Received | 2015-03-20 | |
Construction Permit Expires | 2016-02-26 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2015-03-23 | 8632 | 16350 | 0 |
8632 | 16350 | 0 | |
8632 | 16350 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 07/15/2014 | 07/30/2014 | 8516 | 13,237,900.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Sand, White, 100 mesh | Baker Hughes | Proppant | MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 0.433943 | 533880 |
GW-3LDF | Baker Hughes | Gelling Agent | MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 0.089663 | 110313 | |
Scaletrol 720 | Baker Hughes | Scale Inhibitor | MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 0.0158632 | 19516.5 | |
Water | Operator | Carrier | Water | 7732-18-5 | 100 | 89.64 | 110,375,000.0 | |
Enzyme G-NE | Baker Hughes | Breaker | MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 0.0138184 | 17000.8 | |
HCl, 10.1 - 15% | Baker Hughes | Acidizing | MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 0.30507 | 375328 | |
FRW-18 | Baker Hughes | Friction Reducer | MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 0.0769396 | 94658.7 | |
Ingredients in Additive(s) (MSDS and non-MSDS) | Baker Hughes | See Trade Name(s) List | Ammonium Chloride | 12125-02-9 | 3 | 0.0023063 | 2839.76 | |
Olefin | 64743-02-8 | 5 | 0.00002380 | 29.3625 | ||||
Ethanol | 64-17-5 | 5 | 0.0005689 | 700.438 | ||||
Oleamide DEA | 93-83-4 | 2 | 0.0015375 | 1893.17 | ||||
Crystalline Silica (Quartz) | 14808-60-7 | 100 | 9.76274 | 12,021,000.0 | ||||
Calcium Chloride | 10043-52-4 | 5 | 0.0007925 | 975.827 | ||||
Guar Gum | 9000-30-0 | 60 | 0.0537541 | 66188 | ||||
Paraffinic Petroleum Distillate | 64742-55-8 | 30 | 0.026877 | 33094 | ||||
Sodium Chloride | 7647-14-5 | 5 | 0.0040023 | 4928.1 | ||||
Formaldehyde | 50-00-0 | 1 | 0.00000480 | 5.8725 | ||||
Sorbitan Monooleate | 1338-43-8 | 0.5 | 0.0003844 | 473.294 | ||||
Quaternary Ammonium Compound | 68424-85-1 | 5 | 0.0005689 | 700.438 | ||||
Crystalline Silica: Quartz | 14808-60-7 | 5 | 0.0044795 | 5515.67 | ||||
Poly (acrylamide-co-acrylic acid) partial sodium salt | 62649-23-4 | 30 | 0.0230629 | 28397.6 | ||||
Alcohols, C12-16, ethoxylated | 68551-12-2 | 2 | 0.0015375 | 1893.17 | ||||
Mineral Oil | 8042-47-5 | 70 | 0.0627131 | 77219.4 | ||||
Hydrochloric Acid | 7647-01-0 | 15 | 0.0457277 | 56305.1 | ||||
Citric Acid | 77-92-9 | 60 | 0.0012542 | 1544.33 | ||||
Fatty Acids | 61790-12-3 | 10 | 0.00004770 | 58.725 | ||||
2-Propenoic, Polymer with Sodium Phosphinate, Sodium Salt | 71050-62-9 | 20 | 0.00317 | 3903.31 | ||||
Hydrotreated Light Distillate | 64742-47-8 | 30 | 0.0230629 | 28397.6 | ||||
2-butoxy-1-propanol | 15821-83-7 | 0.1 | 0.00008960 | 110.313 | ||||
Hemicellulase Enzyme Concentrate | 9025-56-3 | 5 | 0.0006904 | 850.039 | ||||
Potassium Chloride | 7447-40-7 | 1 | 0.0001585 | 195.165 | ||||
Didecyl Dimethyl Ammonium Chloride | 7173-51-5 | 10 | 0.0011377 | 1400.88 | ||||
Ethylene Glycol | 107-21-1 | 45 | 0.0071326 | 8782.44 | ||||
1-butoxy-2-propanol | 5131-66-8 | 5 | 0.0044795 | 5515.67 | ||||
Methanol | 67-56-1 | 100 | 0.0004769 | 587.25 | ||||
Isotridecanol, ethoxylated | 9043-30-5 | 5 | 0.0044795 | 5515.67 | ||||
Propargyl Alcohol | 107-19-7 | 5 | 0.00002380 | 29.3625 | ||||
Polyoxyalkylenes | 68951-67-7 | 30 | 0.0001431 | 176.175 | ||||
Water | 7732-18-5 | 95 | 0.318765 | 392499 | ||||
Glutaraldehyde | 111-30-8 | 30 | 0.0034131 | 4202.63 | ||||
Modified Thiourea Polymer | 68527-49-1 | 7 | 0.00003340 | 41.1075 | ||||
Polyoxythylene Sorbitan Monooleate | 9005-65-6 | 0.5 | 0.0003844 | 473.294 | ||||
Sand, White, 40/70 | Baker Hughes | Proppant | MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 5.60183 | 6,891,920.0 | |
Alpha 1427 | Baker Hughes | Biocide | MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 0.0113864 | 14008.8 | |
Ferrotrol 300L | Baker Hughes | Iron Control | MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 0.0020921 | 2573.88 | |
CI-14 | Baker Hughes | Corrosion Inhibitor | MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 0.0004773 | 587.25 | |
Sand, White, 20/40 | Baker Hughes | Proppant | MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 3.73501 | 4,595,180.0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2014-07-22 | H2O | 0 | 7152 Gal | 282218 | BJ Services Company | Status check on site inspection to witness the stimulation of stage 23 of 44 with 60 perforations shot between 12,328' and 12,448', the annular pressure is being monitored electronically. |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | ANTERO RESOURCES CORPORATION | 884406 | 419 | 70 |
2015 | ANTERO RESOURCES CORPORATION | 2230537 | 504 | 350 |
2016 | ANTERO RESOURCES CORPORATION | 1021603 | 265 | 366 |
2017 | ANTERO RESOURCES CORPORATION | 638728 | 125 | 365 |
2018 | ANTERO RESOURCES CORPORATION | 424825 | 150 | 365 |
2019 | ANTERO RESOURCES CORPORATION | 80534 | 61 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | ANTERO RESOURCES CORPORATION | Brine | 29746 | 70 |
2015 | ANTERO RESOURCES CORPORATION | Brine | 32629 | 350 |
2016 | ANTERO RESOURCES CORPORATION | Brine | 11254 | 366 |
2017 | ANTERO RESOURCES CORPORATION | Brine | 5080 | 365 |
2018 | ANTERO RESOURCES CORPORATION | Brine | 3579 | 365 |
2019 | ANTERO RESOURCES CORPORATION | Brine | 668 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1036463110 | 2014-5-1 0:00:0 | DD | No Violations | 0.80 |
-1134908469 | 2014-6-9 0:00:0 | CT | No Violations | |
-1348699837 | 2019-1-14 0:00: | PW | No Violations | 0.10 |
-2104180292 | 2014-1-27 0:00: | DD | No Violations | 0.20 |
-421581496 | 2020-2-7 0:00:0 | PW | No Violations | 1.50 |
0533225623 | 2014-02-18 | Drill / Deepen / Reopen | No Violations | Status check inspection of the drilling progress found the current drilling progress to be the company preparing to drill out from under the 18.625 surface casing. The company man and myself reviewed the recent surface casing cement job. |
0850396695 | 2017-07-17 | Production Wells | No Violations | Status check inspection found the well drilling and completion process now complete and the well in line and producing. There is a gas processing unit on location to support the well along with 8 steel 400 barrel capacity production tanks located inside a polymer lined steel containment dike area. The entry point has signs and gates. Each well has identification posted. |
0898524846 | 2014-02-17 | Casing String Witnessed | No Violations | On 02/17/14- 377 of 18.625 casing was set and cemented to surface by Allied cement services using 760 sacks of Class A cement with 60 barrels of cement returns to surface, I did not witness the job due to Holiday, The company men were in contact with me prior to the job. |
1036463110 | 2014-05-01 | Drill / Deepen / Reopen | No Violations | Status check inspection on the drilling process found Patterson Drilling rig 316 on the hole and the total drilling depth has been reached at 16,407 and the company is conditioning the borehole with 14.9# drilling mud in an attempt to bring down the 4,590 units of 3rd party gas they have encountered in the well bore, once the well bore gas is infiltration numbers is brought down they will pull out of the hole with the drill string and begin running the 5.5 production casing. |
1134908469 | 2014-06-09 | Completion Testing | No Violations | Status check inspection found Fortiff completion services workover rig on the hole recovering a lost wireline gun and drilling out a composite bridge plug, they will then circulate the hole clean to the top of the casing toe sleeve. |
1153273562 | 2014-07-22 | Completion Testing | No Violations | Status check on site inspection to witness the stimulation of stage 23 of 44 with 60 perforations shot between 12,328 and 12,448, the annular pressure is being monitored electronically. |
1348699837 | 2019-01-14 | Production Wells | No Violations | On this day, I found the pad gated with signage at the entrance. There are (8) producing wells, (8) gas processing units within steel containment, (8) 400-barrel steel production tanks within polymer lined steel containment, and an Emergency Shutdown (ESD) button is present. Additionally, concrete Jersey barriers surround the perimeter of the wellheads. Each well has identification and annular pressure monitoring devices equipped. The 9.625 inch diameter intermediate casing has a pressure of 30 pounds per square inch (psi), and the 13.375 inch diameter surface casing has a pressure of 20 psi. |
1392846123 | 2014-02-19 | Drill / Deepen / Reopen | No Violations | Status check inspection on the drilling progress found the current drilling depth to be 1188 in the 1st intermediate well bore stage with the estimated total depth to be drilled of 2240. |
1398711393 | 2014-04-28 | Drill / Deepen / Reopen | No Violations | Status check inspection on the drilling progress found the current drilling depth to be 15,008 in the 8.5 horizontal bore well production well bore stage with a current azimuth of 150.15 degrees and 88.98 degree inclination using a 13.8# oil base drilling mud. |
1399296999 | 2014-05-05 | Casing String Witnessed | No Violations | Status check inspection on the cementing of the production casing, Allied Cement services is on location cementing the 16,404 of 5.5 23# casing with a float shoe and collar ran along with a trigger toe release sub and proper centralizer placement demonstrated, proper bore hole gas migration control was gained prior to cementing by increasing the drilling mud weight to just under 15 # and conditioning the bore hole with it thus bringing the 3rd party gas down from 4,900 units to under 1,500 units. |
1399424922 | 2014-05-06 | Casing String Witnessed | No Violations | Notification was received on this day at 9:48 am from the rig supervisor James Harvey that the production casing cement job that took place on 05/04/2014 had encountered problems during displacement and the cement circulation locked up during the displacement stage of the process with 70 barrels left to displace out of 257 barrels total, a bond log was ran and a top of cement was logged at 7,315 placing the top of cement 135 above the 9.625 casing shoe with the horizontal well bore kick off point 7,550 and total depth of the well bore at 16,407. Discussion was made with both Division Deputy Chiefs and my direct Supervisors and notification was made back to Mr. Harvey that they needed 1000 of cement above the kick off point as described in ORC 1501:9-1-08 (7). |
1438783698 | 2015-08-05 | Preliminary Restoration | No Violations | Preliminary restoration status check inspection finds the affected area limits of disturbance indicated on the pre-site plans has been properly restored under ORC 1509.072 with adequate vegetation - erosion & sedimentation control in place. Addressing the well pad working area there is 3 completed wells in production on location with a Patterson Drilling rig 343 on location drilling additional wells on the pad with a primary earthen containment berm in place to control the surface fluids by the use of perimeter drainage sumps and valves with the drilling rig and support equipment being all placed on secondary polymer containment. Located on the North side of the well pad is the production fluid storage tank battery with a total of 8-300 barrel tanks located in a poly lined metal containment dike area. On the Southern side of the well pad the gas processing and monitoring units are present. Preliminary Restoration passed on this day. |
1448300704 | 2015-11-23 | Production Wells | No Violations | Production well status check inspection found the well is now equipped with a production well head and is on line and producing through a gas processing unit. There is a total of 8-400 barrel capacity production tanks on location located inside a polymer lined steel containment dike. 8 well total are present on this well pad (Monroe North). |
2104180292 | 2014-01-27 | Drill / Deepen / Reopen | No Violations | The said well was spudded on 01/24/14 by Rocky Mountain Drilling with 100 of 26 weld joint 154.5# pipe being cemented to surface on 01/25/14 by Allied Cement services using 336 sacks of class A 2% calcium 1/4# flake cement with 10 barrels of cement returns to surface and the bottom of the tin horn sealed at the same time. |
533225623 | 2014-2-18 0:00: | DD | No Violations | 1.20 |
850396695 | 2017-7-17 0:00: | PW | No Violations | |
898524846 | 2014-2-17 0:00: | CS | No Violations |
For data sources see[10]