Well ID: 34-111-24468 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.7,"lon":-81.25,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Franklin Township | |
Operator Name: ANTERO RESOURCES CORPORATION | |
Well Pad ID: US-OH-000936 | |
Farm/Lease Name: WEBB SOUTH | |
License Status: Well Drilled | |
License Date: 2014-05-01 | |
Spud Date: 2014-05-02 | |
Spud Drilling Contractor: ZIEGENFUSS DRILLING | |
Final Drill Date: 2014-05-07 | |
Well Total Depth: 520.00 ft | |
Configuration: Horizontal | |
Latitude: 39.700000 | |
Longitude: -81.250000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-05-01 | Proposed Formations:POINT PLEASANT, Issued Date:5/1/2014, Expired Date:4/30/2016 12:00:00 PM, Drilling unit acres:614.5, Proposed Well Type:OG, Proposed Well Class:EDPW |
Reached Total Depth | 2014-05-07 | |
Change of Owner | 2015-02-13 | Operator changed from 8856, HALL DRILLING LLC (OIL & GAS) to 8943, ANTERO RESOURCES CORPORATION |
Construction Permit Expires | 2016-04-30 | |
Record Last Modified | 2017-02-10 |
For data sources see[2]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-581341740 | 2018-3-15 0:00: | DD | No Violations | 0.20 |
0581341740 | 2018-03-15 | Drill / Deepen / Reopen | No Violations | On this day, I found the well equipped with 20 inch diameter sealed casing at the surface. There is (1) well in production, and (3) wells that have surface casing set, but were never completed. The inactive wells have sealed casing at the surface. All wells have concrete barriers surrounding them. The facility is gated with proper signage. There is a north pad and a south pad. The south pad contains the wells, along with (2) 400 barrel steel tanks within containment, on the back right-side. The north pad contains the midstream facility, (1) gas processing unit within containment, and (1) 400 barrel steel storage tank, also within containment. There are (2) additional 400 barrel steel tanks within containment, along County Road 16, near the lease road entrance. (Lat. 39.70921 Long. -81.25219) It will be noted that I spoke with Antero representative, Jonah Turner, during my inspection, and informed him to make sure that his operators have their wellheads identified with proper signage. |
1399314709 | 2014-05-05 | Drill / Deepen / Reopen | No Violations | The said well was spudded on 05/02/2014 by Zigenfoose Inc top hole rig with 100 of 24 conductor being set with no annular space, on this day I found the current drilling depth to be 440 using a 22.875 diameter drill bit in the surface borehole well bore section with a projected total depth to be drilled of 500. I shall GPS the well head when we cement the surface pipe. |
1399572318 | 2014-05-08 | Casing String Witnessed | No Violations | On 05/08/2014 494 of 20 .375 well surface pipe was set and cemented to surface by Baker Hughes cement services using 507 sacks of class A 2% calcium .25 pound per sack cement, the mix water was tested and showed no chlorides above 250 parts per million, with good cement returns to surface. Due to restrictions within the working area of the rig mast the cement head would not fit and no wiper plug was ran, the casing shall be pressure tested at a later time. |
1519699670 | 2014-05-23 | Drill / Deepen / Reopen | No Violations | Baker Hughes pressure tested 20casing to 300 psi. for 30 minutes. The test passed. |
For data sources see[3]