Well Details

Well ID: 34-111-24483
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Sunsbury Township
Operator Name: GULFPORT APPALACHIA LLC
Well Pad ID: US-OH-001056
Farm/Lease Name: CAMPBELL 210092
License Status: Producing
License Date: 2014-06-11
Spud Date: 2014-06-26
Spud Drilling Contractor: NOMAC DRILLING CORP
Final Drill Date: 2014-09-21
Well Total Depth: 16930.00 ft
Configuration: Horizontal
Latitude: 39.830000
Longitude: -81.050000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-06-11 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:6/11/2014, Expired Date:6/10/2016 12:00:00 PM, Drilling unit acres:704.214, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2014-09-21
Completion Report Received 2015-12-07
Correction to Well 2015-12-18 TARGET/TAKEPOINT CHANGE PER AS-DRILLED PLAT-ALE
Construction Permit Expires 2016-06-10
Record Last Modified 2017-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2015-12-07 6437 0
6437 0
6437 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 05/27/2015 06/28/2015 9544 8,807,270.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Plexgel 907L-EB Chemplex SOLVAY Viscosifier Alcohol ethoxylate 34398-01-1 0.99 0.000247622 0
Distillate(petroleum), hydrotreated light 64742-47-8 50 0.0125062 0
Organophylic Clay Proprietary 2 0.000500247 0
Cyrstalline Silica 14808-60-7 0.06 0.00001501 0
Guar Gum 9000-30-0 50 0.0125062 0
SC-30 X-Chem, LLC Scale Inhibitor Sodium Polyacrylate Proprietary 30 0.00324297 0
Water 7732-18-5 70 0.00756692 0
100 mesh Minerva/Cadiz Proppant Sand 14808-60-7 100 0.54568 0
40/70 White Steubenville/Cadiz Proppant Sand 14808-60-7 100 11.0747 0
FRA 409 Weatherford Friction Reducer Alcohols, C12-14-secondary, ethoxylated 84133-50-6 5 0.00471617 0
Adipic acid 124-04-9 3 0.0028297 0
Ethanaminium, N,N,N-trimethyl-2-[(1-oxo-2-propenyl)oxy]-,

chloride, polymer with 2-propenamide

69418-26-4 70 0.0660263 0
Proprietary Proprietary 30 0.028297 0
Petroleum Distillate 64742-47-8 10 0.00943233 0
Muriatic Acid Axiall, LLC Acid Water 7732-18-5 60 0.200618 0
Hydrogen chloride 7647-01-0 40 0.133746 0
Fresh water Stingray Carrier Water 7732-18-5 100 87.8721 0
VBL-29 X-Chem, LLC Breaker Water 7732-18-5 90 0.00419394 0
Hydrogen Peroxide 7722-84-1 10 0.000465994 0
TCA 6038F X-Chem, LLC Corossion Inhibitor Methanol 67-56-1 20 0.000671264 0
Water 7732-18-5 80 0.00268505 0
B-84 X-Chem, LLC Biocide Ethanol 64-17-5 4 0.0014016 0
n-Alkyl dimethyl benzyl ammonium chloride 68424-85-1 5.5 0.0019272 0
Glutaraldehyde 111-30-8 27 0.00946079 0
Water 7732-18-5 55.5 0.0194472 0
Didecyl dimethyl ammonium chloride 7173-51-5 8 0.0028032 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2015-06-28 H2O 15 6080 Bbl 256980 STINGRAY PRESSURE PUMPING LLC STAGE 36/36

50 SHOTS

2015-05-27 H2O 15 7093 Bbl 299519 STINGRAY PRESSURE PUMPING LLC STAGE 1/36

50 SHOTS STAGES 2-35 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2015 GULFPORT ENERGY CORPORATION 825692 0 80
2016 GULFPORT ENERGY CORPORATION 2851831 0 335
2017 GULFPORT ENERGY CORPORATION 1063459 0 359
2018 GULFPORT ENERGY CORPORATION 618298 0 357
2019 GULFPORT ENERGY CORPORATION 120056 0 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2015 GULFPORT ENERGY CORPORATION Brine 9119 80
2016 GULFPORT ENERGY CORPORATION Brine 17404 335
2017 GULFPORT ENERGY CORPORATION Brine 7290 359
2018 GULFPORT ENERGY CORPORATION Brine 4335 357
2019 GULFPORT ENERGY CORPORATION Brine 692 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1190451671 2014-9-24 0:00: DD No Violations 1.50
-1265786054 2014-9-15 0:00: DD No Violations 1.50
-1355136510 2015-7-22 0:00: CT No Violations 0.60
-1483941518 2014-8-27 0:00: DD No Violations 1.50
-379062851 2015-5-11 0:00: PL No Violations 1.00
-574826756 2014-8-20 0:00: DD No Violations 1.00
-860603414 2015-9-2 0:00:0 CT No Violations 1.00
0195307980 2019-04-10 Production Wells No Violations On this day, I found the pad gated with signage at the entrance. There are (4) producing wells equipped with a plunger lift system, (4) gas processing units, (4) 400-barrel steel production tanks within steel containment, and an Emergency Shutdown (ESD) button is present at the pad entrance. Concrete barriers surround the perimeter of the wellheads. Each well has identification and annular pressure monitoring devices equipped. The 9.625 inch diameter intermediate casing has a pressure of 450 pounds per square inch (psi). It will be noted that a riser pipe and gauge are not present for the 13.375 inch diameter casing string. Records indicate that the current casing string does not include the 13.375 inch diameter casing, as the original permit proposed.
0335116675 2014-09-22 Drill / Deepen / Reopen No Violations Status check in section on the drilling progress found Nomac Drilling rig 311 on the hole and the 8.750 production bore hole total drilling depth reached at 16,930 with a directional azimuth of 150 degrees and true vertical well depth of 9,582.
0379062851 2015-05-11 Preliminary Restoration No Violations Preliminary Restoration Status check inspection and well completion process update found a total of 4 wells have now been drilled on the Campbell well pad with all wells secured and awaiting a service rig to complete the toe prep clean out post-stimulation run. Upon completion the stimulation process will take place. The company has installed all well production flow lines and a tank battery has been constructed on location with a total of 4-400 barrel production tanks present. Upon review of the well pad perimeter it was observed that vegetation is established and no erosion issues noted as observed. The company has personnel in place monitoring any water that accumulates on location before discharging any fluid off site. Preliminary Restoration passed on this day.
0488273036 2014-08-25 Drill / Deepen / Reopen No Violations Status check inspection found Nomac Drilling rig 311 on location drilling the 12.250 1st intermediate well bore at a depth of 2,316 with a projected total depth to be drilled of 2,332.
0499852670 2014-08-22 Drill / Deepen / Reopen No Violations Status check inspection found the current drilling depth to be 1,828 in the 17.5 1st intermediate well bore section with a estimated total depth to be drilled of 2,332, the company has switched from air drilling to fluid drilling with 9.9# KCL due to hole conditions.
0574826756 2014-08-20 Drill / Deepen / Reopen No Violations
0662981730 2014-09-08 Drill / Deepen / Reopen No Violations Status check inspection on the drilling process found Nomac drilling rig 311 on the hole with a current 8.750 borehole depth of 8,958. The rig is currently fishing for 2 blades off the PDC drill bit that was lost in the hole.
0703306291 2014-09-11 Drill / Deepen / Reopen No Violations Status check inspection of the drilling process found Nomac Rig 311 on location drilling the 8.750 production borehole at a depth of 9,677 in the horizontal curve section with a directional azimuth of 210.84 degrees using 10.70 # drilling mud.
0860603414 2015-09-02 Completion Testing No Violations Status check inspection on the well completion process found the well stimulation process is now complete, the well also has 2.875 production tubing set and is now on line and producing, with a company know as Pro-flow testing services on location, the company is currently on day 6 of 12 proposed days the well will be flow tested, the well is on line and selling gas.
1190451671 2014-09-24 Drill / Deepen / Reopen No Violations Status check inspection found the well drilling process complete with a total drilling depth reached of 16,930 and the 5.5 production casing has been ran and cemented to a depth of 16,833 with a directional azimuth of 150 degrees. The drilling rig is laying down the drill sting so the rig may be skidded. All records have been received and submitted.
1265786054 2014-09-15 Drill / Deepen / Reopen No Violations Status check inspection on the drilling progress found Nomac Drilling rig 311 on location drilling the 8.5 horizontal well bore section at a current horizontal depth of 13,302 using 12.5# drilling mud with 4,500 units of 3rd party gas encountered, the rig is currently pulling the drill string out of the hole at 6,141 to change out the down hole assembly & drill bit.
1279248515 2014-07-21 Drill / Deepen / Reopen No Violations Status check inspection found Zigenfoose drilling on location drilling the 24 diameter surface borehole to be drilled to 320.
1355136510 2015-07-22 Completion Testing No Violations Status check inspection on the well drilling process found the well drilling and stimulation process now complete with 4 wells on location awaiting the workover rig to drill out the completion plugs and run the production tubing. All completion work is being conducted on 2 levels of containment. The company has contractors on location finishing the installation of the 4 gas processing units and well production support equipment.
1406103358 2014-07-23 Casing String Witnessed No Violations On 07/23/2014 320 of 20 surface casing was set by Zigenfoose drilling inside a 23 x 320 borehole and cemented by Universal well service using 304 sacks of class A 2% calcium 1/4 pound per sack cement with 30% calculated cement excess ran and 20 barrels of good cement returns to surface.
1483941518 2014-08-27 Drill / Deepen / Reopen No Violations Status check inspection on the drilling process found 9.625 1st intermediate casing has been ran and cemented to a depth of 2,332 with Halliburton cement services cementing the casing using 1120 sacks of class A cement with 34 barrels of good cement returns to surface reported, the company currently is testing the Blow out preventer before starting to drill the production borehole.
1644830573 2014-09-04 Drill / Deepen / Reopen No Violations Status check inspection found the current drilling depth to be 7,476 in the 8.750 vertical well bore section with a proposed horizontal kick off point of 8,900, the company will switch to oil based synthetic drilling mud and drop their dimensional bit size down to 8.5 before starting the curve section, the company man made prior notification that while drilling at a depth of 5,534 they encountered 77.5 ppm of H2S gas with the gas quickly subsiding they were permitted to continue drilling this section on air, 3rd party contractors were brought in to monitor for H2S gas until they switch to fluid.
1801835809 2020-3-18 0:00: PW No Violations 1.00
195307980 2019-4-10 0:00: PW No Violations 0.10
2062306168 2014-09-18 Drill / Deepen / Reopen No Violations Status check inspection on the drilling progress found Sidewinder drilling rig 209 drilling the 8.750 production borehole at a depth of 14,900 with a current directional azimuth of 151.93 degrees and a true vertical depth of 9,578 with a projected total depth to be drilled of 16,930.
335116675 2014-9-22 0:00: DD No Violations 1.00
488273036 2014-8-25 0:00: DD No Violations
499852670 2014-8-22 0:00: DD No Violations 0.80
557202333 2020-4-16 0:00: PW No Violations 0.30
662981730 2014-9-8 0:00:0 DD No Violations 1.50
703306291 2014-9-11 0:00: DD No Violations 0.80

For data sources see[10]

References