If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-111-24483 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.83,"lon":-81.05,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Monroe | |
| Municipality: Sunsbury Township | |
| Operator Name: GULFPORT APPALACHIA LLC | |
| Well Pad ID: US-OH-001056 | |
| Farm/Lease Name: CAMPBELL 210092 | |
| License Status: Producing | |
| License Date: 2014-06-11 | |
| Spud Date: 2014-06-26 | |
| Spud Drilling Contractor: NOMAC DRILLING CORP | |
| Final Drill Date: 2014-09-21 | |
| Well Total Depth: 16930.00 ft | |
| Configuration: Horizontal | |
| Latitude: 39.830000 | |
| Longitude: -81.050000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2014-06-11 | Proposed Formations:UTICA/POINT PLEASANT, Issued Date:6/11/2014, Expired Date:6/10/2016 12:00:00 PM, Drilling unit acres:704.214, Proposed Well Type:OG, Proposed Well Class:EDPW |
| Reached Total Depth | 2014-09-21 | |
| Completion Report Received | 2015-12-07 | |
| Correction to Well | 2015-12-18 | TARGET/TAKEPOINT CHANGE PER AS-DRILLED PLAT-ALE |
| Construction Permit Expires | 2016-06-10 | |
| Record Last Modified | 2017-10-24 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2015-12-07 | 6437 | 0 | |
| 6437 | 0 | ||
| 6437 | 0 |
For data sources see[3]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 05/27/2015 | 06/28/2015 | 9544 | 8,807,270.0 | 0 |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Plexgel 907L-EB | Chemplex SOLVAY | Viscosifier | Alcohol ethoxylate | 34398-01-1 | 0.99 | 0.000247622 | 0 |
| Distillate(petroleum), hydrotreated light | 64742-47-8 | 50 | 0.0125062 | 0 | ||||
| Organophylic Clay | Proprietary | 2 | 0.000500247 | 0 | ||||
| Cyrstalline Silica | 14808-60-7 | 0.06 | 0.00001501 | 0 | ||||
| Guar Gum | 9000-30-0 | 50 | 0.0125062 | 0 | ||||
| SC-30 | X-Chem, LLC | Scale Inhibitor | Sodium Polyacrylate | Proprietary | 30 | 0.00324297 | 0 | |
| Water | 7732-18-5 | 70 | 0.00756692 | 0 | ||||
| 100 mesh | Minerva/Cadiz | Proppant | Sand | 14808-60-7 | 100 | 0.54568 | 0 | |
| 40/70 White | Steubenville/Cadiz | Proppant | Sand | 14808-60-7 | 100 | 11.0747 | 0 | |
| FRA 409 | Weatherford | Friction Reducer | Alcohols, C12-14-secondary, ethoxylated | 84133-50-6 | 5 | 0.00471617 | 0 | |
| Adipic acid | 124-04-9 | 3 | 0.0028297 | 0 | ||||
| Ethanaminium, N,N,N-trimethyl-2-[(1-oxo-2-propenyl)oxy]-,
chloride, polymer with 2-propenamide |
69418-26-4 | 70 | 0.0660263 | 0 | ||||
| Proprietary | Proprietary | 30 | 0.028297 | 0 | ||||
| Petroleum Distillate | 64742-47-8 | 10 | 0.00943233 | 0 | ||||
| Muriatic Acid | Axiall, LLC | Acid | Water | 7732-18-5 | 60 | 0.200618 | 0 | |
| Hydrogen chloride | 7647-01-0 | 40 | 0.133746 | 0 | ||||
| Fresh water | Stingray | Carrier | Water | 7732-18-5 | 100 | 87.8721 | 0 | |
| VBL-29 | X-Chem, LLC | Breaker | Water | 7732-18-5 | 90 | 0.00419394 | 0 | |
| Hydrogen Peroxide | 7722-84-1 | 10 | 0.000465994 | 0 | ||||
| TCA 6038F | X-Chem, LLC | Corossion Inhibitor | Methanol | 67-56-1 | 20 | 0.000671264 | 0 | |
| Water | 7732-18-5 | 80 | 0.00268505 | 0 | ||||
| B-84 | X-Chem, LLC | Biocide | Ethanol | 64-17-5 | 4 | 0.0014016 | 0 | |
| n-Alkyl dimethyl benzyl ammonium chloride | 68424-85-1 | 5.5 | 0.0019272 | 0 | ||||
| Glutaraldehyde | 111-30-8 | 27 | 0.00946079 | 0 | ||||
| Water | 7732-18-5 | 55.5 | 0.0194472 | 0 | ||||
| Didecyl dimethyl ammonium chloride | 7173-51-5 | 8 | 0.0028032 | 0 |
For data sources see[4]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| 2015-06-28 | H2O | 15 | 6080 Bbl | 256980 | STINGRAY PRESSURE PUMPING LLC | STAGE 36/36
50 SHOTS |
| 2015-05-27 | H2O | 15 | 7093 Bbl | 299519 | STINGRAY PRESSURE PUMPING LLC | STAGE 1/36
50 SHOTS STAGES 2-35 SEE IMAGES |
For data sources see[5]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2015 | GULFPORT ENERGY CORPORATION | 825692 | 0 | 80 |
| 2016 | GULFPORT ENERGY CORPORATION | 2851831 | 0 | 335 |
| 2017 | GULFPORT ENERGY CORPORATION | 1063459 | 0 | 359 |
| 2018 | GULFPORT ENERGY CORPORATION | 618298 | 0 | 357 |
| 2019 | GULFPORT ENERGY CORPORATION | 120056 | 0 | 90 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2015 | GULFPORT ENERGY CORPORATION | Brine | 9119 | 80 |
| 2016 | GULFPORT ENERGY CORPORATION | Brine | 17404 | 335 |
| 2017 | GULFPORT ENERGY CORPORATION | Brine | 7290 | 359 |
| 2018 | GULFPORT ENERGY CORPORATION | Brine | 4335 | 357 |
| 2019 | GULFPORT ENERGY CORPORATION | Brine | 692 | 90 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1190451671 | 2014-9-24 0:00: | DD | No Violations | 1.50 |
| -1265786054 | 2014-9-15 0:00: | DD | No Violations | 1.50 |
| -1355136510 | 2015-7-22 0:00: | CT | No Violations | 0.60 |
| -1483941518 | 2014-8-27 0:00: | DD | No Violations | 1.50 |
| -379062851 | 2015-5-11 0:00: | PL | No Violations | 1.00 |
| -574826756 | 2014-8-20 0:00: | DD | No Violations | 1.00 |
| -860603414 | 2015-9-2 0:00:0 | CT | No Violations | 1.00 |
| 0195307980 | 2019-04-10 | Production Wells | No Violations | On this day, I found the pad gated with signage at the entrance. There are (4) producing wells equipped with a plunger lift system, (4) gas processing units, (4) 400-barrel steel production tanks within steel containment, and an Emergency Shutdown (ESD) button is present at the pad entrance. Concrete barriers surround the perimeter of the wellheads. Each well has identification and annular pressure monitoring devices equipped. The 9.625 inch diameter intermediate casing has a pressure of 450 pounds per square inch (psi). It will be noted that a riser pipe and gauge are not present for the 13.375 inch diameter casing string. Records indicate that the current casing string does not include the 13.375 inch diameter casing, as the original permit proposed. |
| 0335116675 | 2014-09-22 | Drill / Deepen / Reopen | No Violations | Status check in section on the drilling progress found Nomac Drilling rig 311 on the hole and the 8.750 production bore hole total drilling depth reached at 16,930 with a directional azimuth of 150 degrees and true vertical well depth of 9,582. |
| 0379062851 | 2015-05-11 | Preliminary Restoration | No Violations | Preliminary Restoration Status check inspection and well completion process update found a total of 4 wells have now been drilled on the Campbell well pad with all wells secured and awaiting a service rig to complete the toe prep clean out post-stimulation run. Upon completion the stimulation process will take place. The company has installed all well production flow lines and a tank battery has been constructed on location with a total of 4-400 barrel production tanks present. Upon review of the well pad perimeter it was observed that vegetation is established and no erosion issues noted as observed. The company has personnel in place monitoring any water that accumulates on location before discharging any fluid off site. Preliminary Restoration passed on this day. |
| 0488273036 | 2014-08-25 | Drill / Deepen / Reopen | No Violations | Status check inspection found Nomac Drilling rig 311 on location drilling the 12.250 1st intermediate well bore at a depth of 2,316 with a projected total depth to be drilled of 2,332. |
| 0499852670 | 2014-08-22 | Drill / Deepen / Reopen | No Violations | Status check inspection found the current drilling depth to be 1,828 in the 17.5 1st intermediate well bore section with a estimated total depth to be drilled of 2,332, the company has switched from air drilling to fluid drilling with 9.9# KCL due to hole conditions. |
| 0574826756 | 2014-08-20 | Drill / Deepen / Reopen | No Violations | |
| 0662981730 | 2014-09-08 | Drill / Deepen / Reopen | No Violations | Status check inspection on the drilling process found Nomac drilling rig 311 on the hole with a current 8.750 borehole depth of 8,958. The rig is currently fishing for 2 blades off the PDC drill bit that was lost in the hole. |
| 0703306291 | 2014-09-11 | Drill / Deepen / Reopen | No Violations | Status check inspection of the drilling process found Nomac Rig 311 on location drilling the 8.750 production borehole at a depth of 9,677 in the horizontal curve section with a directional azimuth of 210.84 degrees using 10.70 # drilling mud. |
| 0860603414 | 2015-09-02 | Completion Testing | No Violations | Status check inspection on the well completion process found the well stimulation process is now complete, the well also has 2.875 production tubing set and is now on line and producing, with a company know as Pro-flow testing services on location, the company is currently on day 6 of 12 proposed days the well will be flow tested, the well is on line and selling gas. |
| 1190451671 | 2014-09-24 | Drill / Deepen / Reopen | No Violations | Status check inspection found the well drilling process complete with a total drilling depth reached of 16,930 and the 5.5 production casing has been ran and cemented to a depth of 16,833 with a directional azimuth of 150 degrees. The drilling rig is laying down the drill sting so the rig may be skidded. All records have been received and submitted. |
| 1265786054 | 2014-09-15 | Drill / Deepen / Reopen | No Violations | Status check inspection on the drilling progress found Nomac Drilling rig 311 on location drilling the 8.5 horizontal well bore section at a current horizontal depth of 13,302 using 12.5# drilling mud with 4,500 units of 3rd party gas encountered, the rig is currently pulling the drill string out of the hole at 6,141 to change out the down hole assembly & drill bit. |
| 1279248515 | 2014-07-21 | Drill / Deepen / Reopen | No Violations | Status check inspection found Zigenfoose drilling on location drilling the 24 diameter surface borehole to be drilled to 320. |
| 1355136510 | 2015-07-22 | Completion Testing | No Violations | Status check inspection on the well drilling process found the well drilling and stimulation process now complete with 4 wells on location awaiting the workover rig to drill out the completion plugs and run the production tubing. All completion work is being conducted on 2 levels of containment. The company has contractors on location finishing the installation of the 4 gas processing units and well production support equipment. |
| 1406103358 | 2014-07-23 | Casing String Witnessed | No Violations | On 07/23/2014 320 of 20 surface casing was set by Zigenfoose drilling inside a 23 x 320 borehole and cemented by Universal well service using 304 sacks of class A 2% calcium 1/4 pound per sack cement with 30% calculated cement excess ran and 20 barrels of good cement returns to surface. |
| 1483941518 | 2014-08-27 | Drill / Deepen / Reopen | No Violations | Status check inspection on the drilling process found 9.625 1st intermediate casing has been ran and cemented to a depth of 2,332 with Halliburton cement services cementing the casing using 1120 sacks of class A cement with 34 barrels of good cement returns to surface reported, the company currently is testing the Blow out preventer before starting to drill the production borehole. |
| 1644830573 | 2014-09-04 | Drill / Deepen / Reopen | No Violations | Status check inspection found the current drilling depth to be 7,476 in the 8.750 vertical well bore section with a proposed horizontal kick off point of 8,900, the company will switch to oil based synthetic drilling mud and drop their dimensional bit size down to 8.5 before starting the curve section, the company man made prior notification that while drilling at a depth of 5,534 they encountered 77.5 ppm of H2S gas with the gas quickly subsiding they were permitted to continue drilling this section on air, 3rd party contractors were brought in to monitor for H2S gas until they switch to fluid. |
| 1801835809 | 2020-3-18 0:00: | PW | No Violations | 1.00 |
| 195307980 | 2019-4-10 0:00: | PW | No Violations | 0.10 |
| 2062306168 | 2014-09-18 | Drill / Deepen / Reopen | No Violations | Status check inspection on the drilling progress found Sidewinder drilling rig 209 drilling the 8.750 production borehole at a depth of 14,900 with a current directional azimuth of 151.93 degrees and a true vertical depth of 9,578 with a projected total depth to be drilled of 16,930. |
| 335116675 | 2014-9-22 0:00: | DD | No Violations | 1.00 |
| 488273036 | 2014-8-25 0:00: | DD | No Violations | |
| 499852670 | 2014-8-22 0:00: | DD | No Violations | 0.80 |
| 557202333 | 2020-4-16 0:00: | PW | No Violations | 0.30 |
| 662981730 | 2014-9-8 0:00:0 | DD | No Violations | 1.50 |
| 703306291 | 2014-9-11 0:00: | DD | No Violations | 0.80 |
For data sources see[10]