If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-111-24486 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.84,"lon":-81.04,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Monroe | |
| Municipality: Sunsbury Township | |
| Operator Name: GULFPORT APPALACHIA LLC | |
| Well Pad ID: US-OH-001057 | |
| Farm/Lease Name: SHRIVER 210018 | |
| License Status: Producing | |
| License Date: 2014-06-13 | |
| Spud Date: 2014-06-15 | |
| Spud Drilling Contractor: SIDEWINDER DRILLING INC | |
| Final Drill Date: 2014-08-18 | |
| Well Total Depth: 16809.00 ft | |
| Configuration: Horizontal | |
| Latitude: 39.840000 | |
| Longitude: -81.040000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2014-06-13 | Proposed Formations:UTICA/POINT PLEASANT, Issued Date:6/13/2014, Expired Date:6/12/2016 12:00:00 PM, Drilling unit acres:704.214, Proposed Well Type:OG, Proposed Well Class:EDPW |
| Reached Total Depth | 2014-08-18 | |
| Completion Report Received | 2015-12-01 | |
| Correction to Well | 2015-12-18 | ACREAGE, TARGET/TAKEPOINT CHANGE PER AS-DRILLED PLAT-ALE |
| Construction Permit Expires | 2016-06-12 | |
| Record Last Modified | 2017-10-24 |
For data sources see[2]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 04/30/2015 | 05/30/2015 | 9619 | 7,519,970.0 | 0 |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | 100 mesh | Minerva/Cadiz | Proppant | Sand | 14808-60-7 | 100 | 0.232382 | 0 |
| Muriatic Acid | Axiall, LLC | Acid | Hydrogen chloride | 7647-01-0 | 40 | 0.145155 | 0 | |
| Water | 7732-18-5 | 60 | 0.217733 | 0 | ||||
| FRA 409 | Weatherford | Friction Reducer | Proprietary | Proprietary | 30 | 0.0319832 | 0 | |
| Adipic acid | 124-04-9 | 3 | 0.00319832 | 0 | ||||
| Alcohols, C12-14-secondary, ethoxylated | 84133-50-6 | 5 | 0.00533054 | 0 | ||||
| Petroleum Distillate | 64742-47-8 | 10 | 0.0106611 | 0 | ||||
| Ethanaminium, N,N,N-trimethyl-2-[(1-oxo-2-propenyl)oxy]-,
chloride, polymer with 2-propenamide |
69418-26-4 | 70 | 0.0746275 | 0 | ||||
| B-84 | X-Chem, LLC | Biocide | Water | 7732-18-5 | 55.5 | 0.0173826 | 0 | |
| n-Alkyl dimethyl benzyl ammonium chloride | 68424-85-1 | 5.5 | 0.0017226 | 0 | ||||
| Glutaraldehyde | 111-30-8 | 27 | 0.00845638 | 0 | ||||
| Didecyl dimethyl ammonium chloride | 7173-51-5 | 8 | 0.0025056 | 0 | ||||
| Ethanol | 64-17-5 | 4 | 0.0012528 | 0 | ||||
| VBL-29 | X-Chem, LLC | Breaker | Hydrogen Peroxide | 7722-84-1 | 10 | 0.00309402 | 0 | |
| Water | 7732-18-5 | 90 | 0.0278462 | 0 | ||||
| Fresh water | Stingray | Carrier | Water | 7732-18-5 | 100 | 87.2734 | 0 | |
| SC-30 | X-Chem, LLC | Scale Inhibitor | Sodium Polyacrylate | Proprietary | 30 | 0.00312467 | 0 | |
| Water | 7732-18-5 | 70 | 0.0072909 | 0 | ||||
| TCA 6038F | X-Chem, LLC | Corossion Inhibitor | Water | 7732-18-5 | 80 | 0.00169432 | 0 | |
| Methanol | 67-56-1 | 20 | 0.00042358 | 0 | ||||
| 40/70 White | Steubenville/Cadiz | Proppant | Sand | 14808-60-7 | 100 | 11.9372 | 0 | |
| Plexgel 907L-EB | Chemplex SOLVAY | Viscosifier | Organophylic Clay | Proprietary | 2 | 0.000255018 | 0 | |
| Guar Gum | 9000-30-0 | 50 | 0.00637545 | 0 | ||||
| Cyrstalline Silica | 14808-60-7 | 0.06 | 0.00000765 | 0 | ||||
| Distillate(petroleum), hydrotreated light | 64742-47-8 | 50 | 0.00637545 | 0 | ||||
| Alcohol ethoxylate | 34398-01-1 | 0.99 | 0.000126234 | 0 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| 2015-04-30 | H2O | 15 | 202996 Gal | 270790 | STINGRAY PRESSURE PUMPING LLC | STAGE 1/34
45 SHOTS |
| 2015-05-30 | H2O | 15 | 206808 Gal | 278540 | STINGRAY PRESSURE PUMPING LLC | STAGE 34/34
45 SHOTS |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2015 | GULFPORT ENERGY CORPORATION | 1349375 | 0 | 123 |
| 2016 | GULFPORT ENERGY CORPORATION | 2260574 | 0 | 334 |
| 2017 | GULFPORT ENERGY CORPORATION | 944615 | 0 | 347 |
| 2018 | GULFPORT ENERGY CORPORATION | 418694 | 0 | 358 |
| 2019 | GULFPORT ENERGY CORPORATION | 76586 | 0 | 90 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2015 | GULFPORT ENERGY CORPORATION | Brine | 20210 | 123 |
| 2016 | GULFPORT ENERGY CORPORATION | Brine | 14478 | 334 |
| 2017 | GULFPORT ENERGY CORPORATION | Brine | 7019 | 347 |
| 2018 | GULFPORT ENERGY CORPORATION | Brine | 4252 | 358 |
| 2019 | GULFPORT ENERGY CORPORATION | Brine | 805 | 90 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1420021608 | 2017-2-13 0:00: | PW | No Violations | 0.50 |
| -224765502 | 2019-4-10 0:00: | PW | No Violations | 0.20 |
| -880394155 | 2014-8-18 0:00: | DD | No Violations | 0.80 |
| 0174728755 | 2015-05-11 | Preliminary Restoration | No Violations | Preliminary Restoration status check inspection found the following present on location- Stingray Pressure pumping services are on site along with Nine Energy wireline implementing the completion process on all 4 wells on location that have been drilled. All stimulation support equipment is on containment with the well pad berm serving as secondary containment with all site valves in the closed position during stimulation. The company does have personnel in place monitoring and testing any fluid that may accumulate before discharging takes place. Addressing the Preliminary Restoration the well pad construction phase is complete with adequate vegetation and erosion control being established in the affected areas, the well pad working surface shall remain as stone. 4-400 barrel production fluid storage tanks are present on location and all production flow lines are in place with some fine pluming connection to take place during the final completion phase. Preliminary Restoration passed on this day. |
| 0224765502 | 2019-04-10 | Production Wells | No Violations | On this day, I found the pad gated with signage at the entrance. There are (4) producing wells equipped with a plunger lift system, (1) gas processing unit, (4) 400-barrel steel production tanks within steel containment, and an Emergency Shutdown (ESD) button is present at the pad entrance. Concrete barriers surround the perimeter of the wellheads. Each well has identification and annular pressure monitoring devices equipped. The 9.625 inch diameter intermediate casing has a pressure of 50 pounds per square inch (psi), and the 13.375 inch diameter surface casing has a pressure of 0 psi. The production records are current. I spoke with Company Representative Steve Habig during the inspection. |
| 0246857728 | 2015-07-22 | Completion Testing | No Violations | Status check inspection on the well completion process found the well is now capable of production and Pro Flow testing service is completing the final flow testing process. 4 Gas processing units are present on location to support the existing wells. |
| 0392221494 | 2014-08-07 | Drill / Deepen / Reopen | No Violations | Status check inspection on the drilling process found Sidewinder drilling rig 209 on location drilling the 8.750 production borehole at a depth of 8.750. |
| 0880394155 | 2014-08-18 | Drill / Deepen / Reopen | No Violations | Status check inspection on the drilling process found Sidewinder Drilling rig 209 on the hole and the total drilling depth has been reached at 16,809 with the company pulling the drill string and preparing to run the 5.5 production casing. |
| 1031546532 | 2015-06-23 | Completion Testing | No Violations | Status check inspection of the well completion process found Mercer Well Service rig on location and has recently completed the post drilling well bore clean out run with 2.875 production tubing set to a depth of 9,929. Pro FlowCompany flow back was on site to provide well flow back operations and testing. The production well head equipment is now in place and the crews are mopping up and preparing to move over to the McLaughlin well pad. |
| 1407150827 | 2014-08-04 | Casing String Witnessed | No Violations | On 08/02/14- 366 of 13.375 surface casing was ran using 514 sacks of class A cement with 19 barrels of good cement returns to surface. As a side note permission was requested by Gulfport to alter the casing plan eliminating the 9.625 2nd intermediate casing string and downsize the surface casing string to 13.35 and 1st intermediate string to 9.625. |
| 1407724572 | 2014-08-10 | Drill / Deepen / Reopen | No Violations | Status check inspection on the drilling process found Sidewinder rig 209 on the hole and the current drilling depth to be 8,587 with a 8.750 diameter well bore and the rig pulling the drill string out of the hole to switch over to a 8.5 diameter drill bit and Baker auto track directional drilling assembly, the vertical well bore section is complete and the horizontal curve section is to begin with 11.2# synthetic oil based drilling fluid. |
| 1409143495 | 2014-08-20 | Drill / Deepen / Reopen | No Violations | Onsite with inspector Bill Stolarik. Rig is in process of skidding over to next well. See his report for this date. |
| 1420021608 | 2017-02-13 | Production Wells | No Violations | Status check inspection found the well in production and selling off the 2.875 production tubing tree. The well head did have annular monitoring gauges in place with zero pressure on the 13.375 and 200 psi on the 9.625 annular. The well is producing into a gas processing unit and selling into a main sales line. There is a tank farm consisting of a total of 4 tanks with the capacity of 400 barrels each with the tanks located inside a polymer lined steel containment dike area. Proper well identification is posted at the well heads and location entry point. The company has also installed emergency shut down devices at each well head along with at each gas processing unit and at the location entry point and production tank farm. |
| 1450994049 | 2020-4-16 0:00: | PW | No Violations | 0.30 |
| 174728755 | 2015-5-11 0:00: | PL | No Violations | 1.00 |
| 246857728 | 2015-7-22 0:00: | CT | No Violations | 0.50 |
| 392221494 | 2014-8-7 0:00:0 | DD | No Violations | 1.00 |
For data sources see[9]