34-111-24489

Well Details

Well ID: 34-111-24489
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Seneca Township
Operator Name: ANTERO RESOURCES CORPORATION
Well Pad ID: US-OH-001063
Farm/Lease Name: LORADITCH UNIT
License Status: Producing
License Date: 2015-02-04
Spud Date: 2014-09-15
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2015-03-16
Well Total Depth: 17480.00 ft
Configuration: Horizontal
Latitude: 39.830000
Longitude: -81.260000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-06-16 Proposed Formations:POINT PLEASANT, Issued Date:6/16/2014, Expired Date:6/15/2016 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2014-11-10 Proposed Formations:POINT PLEASANT, Issued Date:11/10/2014, Expired Date:11/9/2016 12:00:00 PM, Drilling unit acres:659.424, Proposed Well Type:OG, Proposed Well Class:POOL
APP 2015-02-04 Proposed Formations:POINT PLEASANT, Issued Date:2/4/2015, Expired Date:2/3/2017 12:00:00 PM, Drilling unit acres:659.424, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2015-03-16
Correction to Well 2015-04-24 CHANGE IN TARGET & TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT.
Completion Report Received 2015-11-13
Construction Permit Expires 2017-02-03
Record Last Modified 2017-10-23

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2015-11-16 8638 17332 0
8638 17332 0
8638 17332 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 04/25/2015 05/26/2015 8457 13,078,700.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Alpha 1427 Baker Hughes Biocide MSDS and Non-MSDS Ingredients Listed Below N/A 0 0.008688 10535
CI-39 Baker Hughes Corrosion Inhibitor MSDS and Non-MSDS Ingredients Listed Below N/A 0 0.000698 846.4
Water Operator Carrier Water 7732-18-5 100 89.9046 109,047,000.0
Sand, White, 40/70 Baker Hughes Proppant MSDS and Non-MSDS Ingredients Listed Below N/A 0 4.29116 5,203,380.0
Scaletrol 720 Baker Hughes Scale Inhibitor MSDS and Non-MSDS Ingredients Listed Below N/A 0 0.0150558 18256.4
Sand, White, 100 mesh Baker Hughes Proppant MSDS and Non-MSDS Ingredients Listed Below N/A 0 1.27832 1,550,070.0
Ingredients in Additive(s) (MSDS and non-MSDS) Baker Hughes See Trade Name(s) List Aldehyde 104-55-2 30 0.0002093 253.92
Glutaraldehyde 111-30-8 30 0.0026057 3160.5
Guar Gum 9000-30-0 100 0.0432938 52512
Hydrochloric Acid 7647-01-0 15 0.0459285 55707.8
Sulfurized polyolefin 68037-13-8 5 0.00003490 42.32
Oxyalkylated Fatty Acid 61791-002 40 0.0002791 338.56
Quaternary Ammonium Compound 68424-85-1 5 0.0004692 569.07
Water 7732-18-5 95 0.314734 381748
Polyaklylene 7756-94-7 1 0.00000700 8.464
Potassium Acetate 127-08-2 0.5 0.00000350 4.232
Oleamide DEA 93-83-4 2 0.0013195 1600.39
Polyoxythylene Sorbitan Monooleate 9005-65-6 0.5 0.0003299 400.098
Crystalline Silica (Quartz) 14808-60-7 100 9.62501 11,674,400.0
Ethylene Glycol 107-21-1 45 0.0067732 8215.4
Potassium Iodide 7681-11-0 2 0.00001400 16.928
Poly (acrylamide-co-acrylic acid) partial sodium salt 62649-23-4 30 0.0197918 24005.9
Hemicellulase Enzyme Concentrate 9025-56-3 5 0.0007469 905.902
Calcium Chloride 10043-52-4 5 0.0007526 912.822
Ethanol 64-17-5 5 0.0004343 526.75
Tar Bases, Quinoline Derivs., Benzyl Chloride-Quaternized 72480-70-7 30 0.0002093 253.92
Sorbitan Monooleate 1338-43-8 0.5 0.0003299 400.098
2-Propenoic, Polymer with Sodium Phosphinate, Sodium Salt 71050-62-9 20 0.0030103 3651.29
Citric Acid 77-92-9 60 0.00132 1601.06
Hydrotreated Light Distillate 64742-47-8 30 0.0197918 24005.9
Formic Acid 64-18-6 30 0.0002093 253.92
Didecyl Dimethyl Ammonium Chloride 7173-51-5 10 0.0008686 1053.5
Isopropanol 67-63-0 5 0.00003490 42.32
Ammonium Chloride 12125-02-9 3 0.0019792 2400.59
Alcohols, C12-16, ethoxylated 68551-12-2 2 0.0013195 1600.39
Potassium Chloride 7447-40-7 1 0.0001505 182.564
Sodium Chloride 7647-14-5 5 0.0034491 4183.55
Sand, White, 20/40 Baker Hughes Proppant MSDS and Non-MSDS Ingredients Listed Below N/A 0 4.05824 4,920,940.0
HCl, 10.1 - 15% Baker Hughes Acidizing MSDS and Non-MSDS Ingredients Listed Below N/A 0 0.306276 371385
GW-3 Baker Hughes Gelling Agent MSDS and Non-MSDS Ingredients Listed Below N/A 0 0.043306 52512
FRW-18 Baker Hughes Friction Reducer MSDS and Non-MSDS Ingredients Listed Below N/A 0 0.0659912 80019.7
Ferrotrol 300L Baker Hughes Iron Control MSDS and Non-MSDS Ingredients Listed Below N/A 0 0.0022006 2668.43

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2015-05-25 H2O 15 4064 Bbl 235658 BAKER-HUGHES STAGE 50/50

36 SHOTS

2015-05-14 H2O 15 6968 Bbl 175082 BAKER-HUGHES STAGE 1/50

36 SHOTS STAGES 2-49 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2015 ANTERO RESOURCES CORPORATION 1918618 41 153
2016 ANTERO RESOURCES CORPORATION 2187697 52 348
2017 ANTERO RESOURCES CORPORATION 878561 171 364
2018 ANTERO RESOURCES CORPORATION 576081 217 363
2019 ANTERO RESOURCES CORPORATION 107118 82 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2015 ANTERO RESOURCES CORPORATION Brine 26605 153
2016 ANTERO RESOURCES CORPORATION Brine 20868 348
2017 ANTERO RESOURCES CORPORATION Brine 8315 364
2018 ANTERO RESOURCES CORPORATION Brine 6065 363
2019 ANTERO RESOURCES CORPORATION Brine 1240 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1002092124 2019-1-14 0:00: PW No Violations 0.30
-1248063278 2014-9-18 0:00: CS No Violations 2.50
-986679384 2015-3-17 0:00: DD No Violations
0248063377 2018-03-07 Production Wells No Violations On site inspection accompanied by ODNR Inspector Tom Thomas. On this day the well was observed to be production off the production tree with (2) manual production valves present along with a single (ESD) Emergency Shut Down valve. The ESD has remote shut down buttons located at the well pad entrance along with the production facility and the gas processing units. The well is equipped with steel lines on the 13.375 and 9.625 casing well heads with valves and gauges present to monitor annular pressures. The 13.375 well head section was observed to have 0 pounds pressure on it at surface and the 9.625 section was observed to have 1,500 pounds on it at surface. In conversation with Anteros Production Supervisor Doug Stebbins all annular pressures are being monitored and evaluated. The well pad has an earthen berm established. The production fluid facility is located on a adjoining site pad and consists of (8) steel construction tanks of 400 barrels fluid capacity each. The tanks are situated inside a polymer lined steel containment dike area.
0253145095 2015-03-15 Drill / Deepen / Reopen No Violations Status check inspection on the recent diesel fuel spill on location. On this day it was reported at 10:26 am by Sam Myers that they has spilled approximately 500 gallons of diesel fuel on location and into a pond. Inspector Eric Conrad responded initially and I arrived on location at approximately 5:45 pm. Upon arrival it was observed and reported that a majority of the product has been cleaned up and removed from the main water. I was informed of the companys intention to burn the remaining fuel from the pond area. At that point I was also informed by Aaron Wolfe with the Ohio EPA that the pond was outside the Limits of Disturbance of the well pad and he had authorized the burning. I at that point asked Sam Myers with Antero and Aaron Wolfe with the EPA to please let me run it through the Divisions Management before any fires were lit. I did question this practice for both safety reasons and I did not want a fire lit in close proximity to a active shale pad without my management being aware of the situation first. I proceeded to a area off site to gain phone service and all parties processed to move foreword without respecting my wishes or authority. ODNR Deputy Chief Dave Claus and Regional Supervisor Brent Bear were made aware of the situation.
0752796938 2018-03-07 Production Wells No Violations On this day, I accompanied ODNR Inspector William Stolarik. Please refer to his comments for a detailed report. The well is equipped with annular pressure monitoring devices. Concrete barriers surround the wellheads. The facility is gated with an electronic shutdown button on the left-hand side, prior to the pad. The back of the pad is equipped with (8) 400 barrel steel tanks within containment. There are (4) gas processing units along the front right side of the pad, and a midstream facility along the back right side.
0765568945 2015-04-01 Drill / Deepen / Reopen No Violations I am onsite to meet with Antero EH&S personnel Aaron Goddard and Sam Meyers, as well as, Ohio EPA DERR Aaron Wolfe to review the clean-up of the March 15, 2015 diesel release. My inspection of the affected area finds that the contaminated soils have been removed and replaced with top soil. In addition, the area has been seeded and mulched, with filter sock and silt fence replaced to stop potential erosion. Antero turned over a copy of the sampling performed by Hull Environmental during the cleanup effort, as well as, all trucking manifests. The violation for pollution and contamination has been resolved.
0878830616 2014-10-26 Drill / Deepen / Reopen No Violations Status check inspection of the drilling process found Dallas Morris rig 24 on location drilling the 17.5 1st intermediate well bore section at a depth of 1,519. The rig is currently down for top drive repairs. The recent plug set to deviate around the lost tools in the hole was tagged with a cement top at 1500.
0986679384 2015-03-17 Drill / Deepen / Reopen No Violations My inspection today finds Myers Well Service, Hulls Environmental and EMS are onsite providing spill remediation services. The company has completed the thermal degradation activities around the pond located outside of the permitted limits of disturbance, as agreed upon by OEPA, Monroe County EMA, Antero, Patterson Drilling, EMS, and myself in the incident command meeting on 3-15-2015, EMS is utilizing vacuum trucks to skim the remaining sheen off of the pond. Myers Well Service is removing the contaminated soil at the direction of Hulls Environmental. At the time of inspection over 780 yards of soil and stone have been removed from the site and hauled to an approved landfill. At the last inspection I requested additional engineering controls including a secondary containment to fill the fuel tank that was overfilled, those controls are now in place.
1002092124 2019-01-14 Production Wells No Violations On this day, I spoke with Antero Company Representative Jayson Lukes during the inspection. The producing wells on the pad (permit numbers 4489, 4490, 4492, 4494) are being prepped per Anteros SIMOPS plan that was submitted and reviewed by the ODNR DOGRM, before Stalnaker Energy rigs-up for the plug and abandonment of permit numbers 4491 and 4493. TekSolv is currently onsite setting the back pressure valve. The producing wells have been blown down, are having back pressure valves installed in the tubing hangers, steel cages placed over the wellheads, LEL monitors in place, and concrete Jersey barriers spotted around the perimeter of the wellheads. It will be noted that a 2-way check valve will not be placed in the tubing, as the SIMOPS plan originally stated. I spoke with Jayson Lukes and ODNR Inspector Ken Frye about the amendment to the plan.
1054253956 2015-01-04 Drill / Deepen / Reopen No Violations Status check inspection of the drilling process found Patterson Drilling rig 343 on location drilling the 12.250 2nd intermediate well bore section at a depth of 6,812 with the rig administering a 8 degree borehole nudge in the directional azimuth of 115 degrees with a borehole total projected depth to be 7,423.
1248063278 2014-09-18 Casing String Witnessed No Violations Status check inspection found Rocky Mountain drillings top hole rig has drilled a 32 x 80 conductor borehole and set 80 of 26 conductor in place with a variance granted by the Division to set 80 of conductor due to being in solid limestone bedrock at 60 freshwater was also encountered at 27. Allied cement services are on location and cementing the casing using 228 sacks of class A-2% calcium .25 pps flake with 30% open hole excess ran and 46.5 barrels of fresh water used for cement displacement with good cement returns to surface. The hole was spudded on 09/15/14.
1423600046 2014-10-16 Casing String Witnessed No Violations Dallas Morris rig 24 had drilled a 24open hole to depth of 354. They then set 18 5/8casing of 87.5lb/ft to a depth of 354. There were 18.625floats in line behind the guide shoe. Allied cementing pumped a gel spacer of 25 barrels and then pumped 687 sacks of class A cement with celloflake. Then displaced the rubber wiper plug down. Good circulation with 45 barrels of cement slurry returns. Then bumped the plug and took the pressure up to 500 psi over the lift pressurand held for 5 minutes. The casing test passed.
1426442445 2015-03-15 Drill / Deepen / Reopen Violations Noted At 9:51 AM I received a telephone call from Sam Myers, Antero EH&S, stating that a Patterson Drilling employee rolled over a 500 gallon diesel tank spilling its contents. Upon arrival I witnessed Myers Trucking and Antero employees installing curtain booms and oil soak booms in a farm pond adjacent to the site. After investigating the scene it was determined that the source of the release was a Patterson employee who walked away while filling the fuel tank allowing it to overflow. Measurements of the primary fuel tank indicate that a total volume of 603 gallons of diesel fuel were released. The spill was responded to by five Antero personnel, fourteen Myers personnel with eight water trucks and four EMS personnel. No diesel or sheen was found below the pond. Remove all contaminated soil and filter sock and haul to an approved landfill. Replace all soil removed, as well as, erosion and sediment controls.
1490770905 2014-12-28 Drill / Deepen / Reopen No Violations Status check inspection on the drilling process found Patterson rig 343 on location drilling the 12.250 well bore section on air at a depth of 2,590 and conduction a 8 degree bore hole nudge in the direction of 235.65 degrees Azimuth.
1534432875 2015-11-09 Preliminary Restoration No Violations Preliminary Restoration status check inspecting found the affected area by the well pad construction has properly been restored with vegetation and erosion control in place. Addressing the well head- The well drilling and completion process is now complete and the well is on line and producing along with 3 other wells on the pad. Supporting the well is a gas processing unit and 8-400 barrel production tanks located in a polymer lined metal containment dike area. Proper well identification is posted at the well head.
1948213910 2014-10-19 Plug / Plug Back No Violations Status check inspection on the drilling process and on site inspection to witness the setting of a plug to deviate around a part of a lost hammer bit assembly at a depth of 1,848 in the 17.5 1st intermediate well bore. The Class A 3% calcium 553 sack plug was set by Allied Cement Service through the drill string at a depth of 1,493, during the initial cement displacement the cement truck broke down and the entire cement mix was not able to be used, the company man indicated they would let the cement mix set up and go in and dress off the top of the cement and then administer the rest of the cement needed to finish the job. Dallas Morris rig 24 is on the hole.
2125183393 2015-03-04 Drill / Deepen / Reopen No Violations Status check inspection on the current drilling process found Patterson Drilling rig 343 on location with the current drilling depth of 8,800 using a 8.750 direction drilling assembly in the directional azimuth of 213 degrees with a 16 degree inclination. The company is implementing applied pressure drilling using 13# 74 viscosity drilling mud.
248063377 2018-3-7 0:00:0 PW No Violations 0.20
253145095 2015-3-15 0:00: DD No Violations
613461080 2020-6-30 0:00: PW No Violations 0.40
752796938 2018-3-7 0:00:0 PW No Violations 0.20
765568945 2015-4-1 0:00:0 DD No Violations 3.00
878830616 2014-10-26 0:00 DD No Violations 1.10

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
1426442445 US-OH-112421 2015-04-21 Drilling operation causing pollution and contamination