X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-111-24530

Well Details

Well ID: 34-111-24530
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Seneca Township
Operator Name: ANTERO RESOURCES CORPORATION
Well Pad ID: US-OH-000811
Farm/Lease Name: BIEDENBACH UNIT
License Status: Producing
License Date: 2015-01-21
Spud Date: 2014-12-10
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2015-04-19
Well Total Depth: 15750.00 ft
Configuration: Horizontal
Latitude: 39.820000
Longitude: -81.280000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-10-17 Proposed Formations:POINT PLEASANT, Issued Date:10/17/2014, Expired Date:10/16/2016 12:00:00 PM, Drilling unit acres:506.928, Proposed Well Type:OG, Proposed Well Class:POOL
APP 2015-01-21 Proposed Formations:POINT PLEASANT, Issued Date:1/21/2015, Expired Date:1/20/2017 12:00:00 PM, Drilling unit acres:546.267, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2015-04-19
Correction to Well 2015-07-31 CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT.
Completion Report Received 2016-01-29
Construction Permit Expires 2017-01-20
Record Last Modified 2017-10-23

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2016-01-29 8643 15406 0
8643 15406 0
8643 15406 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 07/04/2015 07/12/2015 8504 10,455,600.0 483756

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 K-BAC 1020 U.S. Well Services Anti-Bacterial Agent Deionized Water 7732-18-5 28 0.00234 2272.15
2,2-dibromo-3-nitrilopropionamide 10222-01-2 20 0.0041 3977.88
Sand U.S. Well Services, LLC Proppant Crystalline Silica, quartz 14808-60-7 100 9.60071 9,309,210.0
SI-1100 U.S. Well Services Scale Inhibitor Ethylene Glycol 107-21-1 25 0.00354 3435.12
Hexamethylene tramine penta (methylene phosphonic acid) 34690-00-1 5 0.00082 790.382
Copolymer of Maleic and Acrylic acid 52255-49-9 10 0.00148 1434.85
Phosphino carboxylic acid polymer 71050-62-9 5 0.00082 790.382
Water 7732-18-5 80 0.01003 9727.78
Hexamethylene diamine penta (methylene phosphonic acid) 23605-74-5 2 0.00033 316.153
Potassium salt of diethylene triamine

penta (methylene phosphonic acid)

15827-60-8 7.5 0.00127 1231.17
HCL Acid (12.6%-18.0%) U.S. Well Services, LLC Bulk Acid Hydrogen Chloride 7647-01-0 18 0.0431 41793.4
Water 7732-18-5 87.5 0.18044 174965
WFRA-405 U.S. Well Services Friction Reducer Ethoxylated alcohol blend Proprietary 5 0.00293 2844.36
Petroleum Distillates 64742-47-8 20 0.00945 9158.83
Anionic Polyacrylamide Proprietary 40 0.02347 22754.9
Sodium Chloride 7647-14-5 20 0.01173 11377.4
Water 7732-18-5 40 0.02347 22754.9
LGC-15 U.S. Well Services Gelling Agents Surfactant 68439-51-0 3 0.00409 3963.32
Suspending agent (solid) 14808-60-7 3 0.01042 10102.6
Petroleum Distillates 64742-47-8 60 0.06452 62558.3
Guar Gum 9000-30-0 50 0.06812 66055.3
AP One U.S. Well Services Gel Breakers Ammonium Persulfate 7727-54-0 100 0.00202 1955
AI-301 U.S. Well Services Acid Corrosion Inhibitors Hydrogen Chloride 7647-01-0 10 0.00005000 46.4371
Coco amine 61791-14-8 5 0.00002000 18.4147
Polyethylene polyamine 68603-67-8 10 0.00004000 40.3122
Diethylene Glycol 111-46-6 30 0.00014 134.387
Methenamine 100-97-0 20 0.00011 106.485
Water Antero Resources Base Fluid Water 7732-18-5 100 89.9304 87,200,000.0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2015-07-04 H2O 15 6931 Bbl 215380 US Well Services Inc STAGE 1/39

60 SHOTS STAGES 2-38 SEE IMAGES

2015-07-12 H2O 15 5847 Bbl 244700 US Well Services Inc STAGE 39/39

60 SHOTS

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2015 ANTERO RESOURCES CORPORATION 429202 181 92
2016 ANTERO RESOURCES CORPORATION 1351449 187 354
2017 ANTERO RESOURCES CORPORATION 559711 109 365
2018 ANTERO RESOURCES CORPORATION 347796 136 365
2019 ANTERO RESOURCES CORPORATION 74031 56 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2015 ANTERO RESOURCES CORPORATION Brine 10034 92
2016 ANTERO RESOURCES CORPORATION Brine 26141 354
2017 ANTERO RESOURCES CORPORATION Brine 5920 365
2018 ANTERO RESOURCES CORPORATION Brine 3071 365
2019 ANTERO RESOURCES CORPORATION Brine 665 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1215159420 2015-3-13 0:00: CS No Violations 5.00
-1389930722 2020-5-21 0:00: PW No Violations 1.00
-1656277672 2019-2-7 0:00:0 PW No Violations 0.10
-2089269649 2015-4-8 0:00:0 DD No Violations 1.50
-86638089 2015-3-22 0:00: DD No Violations 1.50
-94458383 2015-7-9 0:00:0 CT No Violations 2.50
0086638089 2015-03-22 Drill / Deepen / Reopen No Violations Status check inspection on the drilling process found Patterson drilling rig #340 on location drilling the 12.250 2nd intermediate wellbore at a current depth of 4,964. The company is currently implementing a 7.43 degree nudge in the direction of 256.86 degrees.
0094458383 2015-07-09 Completion Testing No Violations Status check inspection on the well completion process found Renegade Wireline Service on location perforating stage 22 of 39 total stages to be completed with a total of 60 perforations shot in 5 clusters between the depths of 11,750 and 11,603 along with a solid composite type 15,000# rated pressure completion plug set at a depth of 11,763. US Well Service is on location to provide the pressure pumping and Bass Well Head Company has their well head equipment on the hole. There is currently 3 live well heads on this location and 4 additional wells being completed. All well completion operations are being conducted on a poly containment area and ECM services is on location recovering standing water on the site pad created from the recent rainfall event. The 5.5 production casing annular pressure is being monitored electronically.
0147381917 2018-03-07 Production Wells No Violations Status check inspection found the well is equipped with a casing and tubing well head assembly with (2) manually operated valves on the tubing well head and one emergency shut down valve on the tubing tree production flow line. The well head casing flow line is also tied into the production flow line however the valves are in the closed position. The 13.375 and 9.625 casing well head assemblies have flowlines with valves and gauges installed to monitor annular pressure. The 13.375 casing well head pressure gauge reads 220 pounds pressure and the 9.625 casing well head reads 300 pounds pressure. On pad total is (8) complete wells supported by (8) gas processing units. Also on location is a production fluid facility consisting of a total of (8) steel construction tanks with a capacity of 400 barrels of fluid each, the tanks are situated inside a polymer lined steel containment dike area. The well lease road entrance is gated and locked with signage posted at the entrance of the well pad and at each well head. The well pad has a stone surface along with the lease road. The well pad perimeter berm is of earthen material and in good repair.
1215159420 2015-03-13 Casing String Witnessed No Violations On site to witness casing run and cemented in place.

18.625 was set at 475KB and 450GL and Halliburton cemented with 780 sacks of Halcem cement and they had 47 barrel of good cement returns and it stayed up good and they bumped plug 500# over and held for 15 min and once released plug held fine.

1418316846 2014-12-11 Casing String Witnessed No Violations The said well was spudded on 12/10/2014 by Express Energys top hole rig with a 32 x 100 conductor borehole being drilled and 100 of 26 conductor pipe being set. Express Energys cement service is on location to cement the casing using 330 sacks of class A-2% calcium .50 pps flake with 100% open hole cement excess ran and circulation established prior to cementing and the cement displaced with 55 barrels of fresh water and good cement returns witnessed to surface.
1447080532 2015-11-09 Preliminary Restoration No Violations Preliminary Restoration status check inspection found the area affected by the well pad construction has proper vegetation and erosion control in place in accordance to ORC 1509.072. Addressing the well and production equipment- The well drilling and completion process is finished with 2.875 production tubing set to a depth of 8,548 with crews present hooking up the production flowlines and equipment. Crews are also present on location removing the containment used during the completion process and cleaning up the well heads and cellar. A total of 8 wells heads are present on location along with 8 gas processing units with 8 400 barrel production tanks present in a polymer lined metal containment dike area.
147381917 2018-3-7 0:00:0 PW No Violations 0.20
1656277672 2019-02-07 Production Wells No Violations On this day, I found the pad gated with signage at the entrance. There are (8) producing wells, (8) gas processing units, (4) 400-barrel steel production tanks within polymer-lined steel containment, and an Emergency Shutdown (ESD) button is present at the pad entrance. Concrete barriers surround the perimeter of the wellheads. Each well has identification and annular pressure monitoring devices equipped. This well is setup to be produced by means of a plunger lift system. The 9.625 inch diameter intermediate casing has a pressure of 0 pounds per square inch (psi), and the 13.375 inch diameter surface casing has a pressure of 200 psi. It will be noted that in 2018 a slip had occurred along the southern slope of the pad and western slope of the lease road, prior to the pad. The slopes have since been graded, seeded, and erosion control in place. Currently awaiting new vegetation.
2089269649 2015-04-08 Drill / Deepen / Reopen No Violations Status check inspection on the current drilling progress found Patterson Drilling rig 340 on location drilling the 8.75- production borehole at a measured depth of 13,302 in the directional azimuth of 146.38 and inclination of 88.86 degrees with a true vertical depth of 8,472. The company in implementing a pressure control drilling method and is holding back 266 psi on the annular side of the drill string using 13# synthetic oil based drilling mud.

For data sources see[10]

References