X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-111-24542

Well Details

Well ID: 34-111-24542
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Summit Township
Operator Name: ANTERO RESOURCES CORPORATION
Well Pad ID: US-OH-001183
Farm/Lease Name: ULRICH UNIT
License Status: Drilling
License Date: 2014-11-24
Spud Date: 2014-11-28
Spud Drilling Contractor:
Final Drill Date:
Well Total Depth: 100.00 ft
Configuration: Horizontal
Latitude: 39.780000
Longitude: -81.270000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-11-24 Proposed Formations:POINT PLEASANT, Issued Date:11/24/2014, Expired Date:11/23/2016 12:00:00 PM, Drilling unit acres:585.543, Proposed Well Type:OG, Proposed Well Class:POOL
Construction Permit Expires 2016-11-23
Record Last Modified 2017-10-23

For data sources see[2]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-492196799 2018-3-2 0:00:0 DD No Violations 0.10
0079566324 2016-04-21 Preliminary Restoration No Violations Preliminary Restoration status check inspection found the area affected by the well pad construction meets ORC 1509.072. The farmer - landowner has began to work the ground along the lease road in preparation to plant a crop. The well drilling process was not complete.
0276521440 2019-02-07 Drill / Deepen / Reopen No Violations On this day, I found the pad gated with signage at the entrance. There are (4) producing wells, (1) with conductor only, (4) gas processing units, (8) 400-barrel steel production tanks within polymer-lined steel containment, and an Emergency Shutdown (ESD) button is present at the pad entrance. Concrete barriers surround the perimeter of the wellheads. The conductor was cemented on 11/29/2014, and no additional drilling was completed. The drilling permit expired 11/26/2016.
0492196799 2018-03-02 Drill / Deepen / Reopen No Violations Status check inspection and update of the well drilling progress. The well was previously spudded and the conductor casing only set. The well drilling process is incomplete and the drilling permit expired on 11/23/2016.
1417290917 2014-11-29 Casing String Witnessed No Violations The said well was spudded on 11/28/2014 by Rocky Mountain Drillings top hole rig with a 100 x 32 conductor borehole being drilled. On 11/29/14 Allied Cement Services is on location to cement the conductor using 235 sacks of class A 2% calcium .25 pps flake cement with the cement mix water tested for PH & Chlorides and good cement returns to surface verified.
276521440 2019-2-7 0:00:0 DD No Violations 0.10
79566324 2016-4-21 0:00: PL No Violations 0.30

For data sources see[3]

References