Well ID: 34-111-24552 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.83,"lon":-81.25,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Seneca Township | |
Operator Name: ANTERO RESOURCES CORPORATION | |
Well Pad ID: US-OH-001145 | |
Farm/Lease Name: KURTZ UNIT | |
License Status: Producing | |
License Date: 2015-10-14 | |
Spud Date: 2014-11-29 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2016-03-12 | |
Well Total Depth: 18646.00 ft | |
Configuration: Horizontal | |
Latitude: 39.830000 | |
Longitude: -81.250000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-11-25 | Proposed Formations:POINT PLEASANT, Issued Date:11/25/2014, Expired Date:11/24/2016 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2015-03-18 | Proposed Formations:POINT PLEASANT, Issued Date:3/18/2015, Expired Date:3/17/2017 12:00:00 PM, Drilling unit acres:536.741, Proposed Well Type:OG, Proposed Well Class:POOL |
APP | 2015-10-14 | Proposed Formations:POINT PLEASANT, Issued Date:10/14/2015, Expired Date:10/13/2017 12:00:00 PM, Drilling unit acres:546.89, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2016-03-12 | |
Completion Report Received | 2016-04-25 | |
Construction Permit Expires | 2017-10-13 | |
Record Last Modified | 2017-10-23 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2016-04-25 | 8690 | 18495 | 0 |
8690 | 18495 | 0 | |
8690 | 18495 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 12/07/2015 | 12/21/2015 | 8553 | 14,835,300.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | FRW-18 | Baker Hughes | Friction Reducer | Listed with other chemicals | NA | 0 | 0.0271574 | 0 |
Water | Operator | Carrier | Water | 7732-18-5 | 100 | 89.994 | 123,694,000.0 | |
Enzyme G-NE | Baker Hughes | Breaker | Listed with other chemicals | NA | 0 | 0.00112832 | 0 | |
Sand, White | Baker Hughes | Proppant | Listed with other chemicals | NA | 0 | 9.66239 | 0 | |
GW-3 | Baker Hughes | Gelling Agent | Listed with other chemicals | NA | 0 | 0.0684914 | 0 | |
Other Chemicals | Hemicellulase Enzyme Concentrate | 9025-56-3 | 0 | 0.00005642 | 77.5415 | |||
Oleamide DEA | 93-83-4 | 0 | 0.00181049 | 2488.46 | ||||
Quaternary Ammonium Compound | 68424-85-1 | 0 | 0.000438169 | 602.248 | ||||
Sodium Chloride | 7647-14-5 | 0 | 0.004687 | 6441.76 | ||||
Ethylene Glycol | 107-21-1 | 0 | 0.00481467 | 6617.6 | ||||
Potassium Chloride | 7447-40-7 | 0 | 0.000160489 | 220.587 | ||||
Polyoxythylene Sorbitan Monooleate | 9005-65-6 | 0 | 0.000452623 | 622.115 | ||||
Petroleum Distillates | 64742-47-8 | 0 | 0.0271574 | 37326.9 | ||||
Glutaraldehyde | 111-30-8 | 0 | 0.00262901 | 3613.49 | ||||
Poly (acrylamide-co-acrylic acid) partial sodium salt | 62649-23-4 | 0 | 0.0271574 | 37326.9 | ||||
Ethanol | 64-17-5 | 0 | 0.000438169 | 602.248 | ||||
Ammonium Chloride | 12125-02-9 | 0 | 0.00271574 | 3732.69 | ||||
Didecyl Dimethyl Ammonium Chloride | 7173-51-5 | 0 | 0.000876337 | 1204.5 | ||||
Guar Gum | 9000-30-0 | 0 | 0.0684914 | 94139 | ||||
Hydrochloric Acid | 7647-01-0 | 0 | 0.0402565 | 55331.2 | ||||
Crystalline Silica (Quartz) | 14808-60-7 | 0 | 9.66239 | 13,280,600.0 | ||||
Ethoxylated Alcohol | 68551-12-2 | 0 | 0.00181049 | 2488.46 | ||||
Calcium Chloride | 10043-52-4 | 0 | 0.000802446 | 1102.93 | ||||
Sorbitan Monooleate | 1338-43-8 | 0 | 0.000452623 | 622.115 | ||||
HCl, 20.1 - 28% | Baker Hughes | Acidizing | Listed with other chemicals | NA | 0 | 0.143773 | 0 | |
Alpha 1427 | Baker Hughes | Biocide | Listed with other chemicals | NA | 0 | 0.00438169 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2015-12-08 | H2O | 0 | 6337 Bbl | 234483 | BJ Services Company | Status check inspection on the well completion process found Baker Hughes pressure pumping service completing stage # 4 with Bass Well Head company's 10,000 psi rated well head assembly set on top of MiSwaco's B section well sub base assembly. Allied Horizontal wireline service has set a solid completion plug at a measured depth of 18,045' and perforated the well with 60 perforations in 6 clusters between the depths of 18,029' and 17,884'. 1000' gallons of 15% HCL was ran ahead of the stimulat |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | ANTERO RESOURCES CORPORATION | 3476881 | 563 | 292 |
2017 | ANTERO RESOURCES CORPORATION | 1463960 | 282 | 364 |
2018 | ANTERO RESOURCES CORPORATION | 708075 | 288 | 363 |
2019 | ANTERO RESOURCES CORPORATION | 133077 | 101 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | ANTERO RESOURCES CORPORATION | Brine | 33009 | 292 |
2017 | ANTERO RESOURCES CORPORATION | Brine | 10973 | 364 |
2018 | ANTERO RESOURCES CORPORATION | Brine | 6307 | 363 |
2019 | ANTERO RESOURCES CORPORATION | Brine | 1273 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1064890679 | 2017-8-25 0:00: | PL | No Violations | 0.50 |
-1991793808 | 2018-3-7 0:00:0 | PW | No Violations | 0.20 |
-2047996698 | 2018-3-7 0:00:0 | PW | No Violations | 0.50 |
-69877607 | 2015-12-8 0:00: | CT | No Violations | 2.50 |
-796029 | 2014-12-30 0:00 | CS | No Violations | 1.50 |
0000796029 | 2014-12-30 | Casing String Witnessed | No Violations | 12/30/14 Dallas Morris rig # 24 is now on the hole and has drilled a 24 x 401 surface casing borehole and ran 399 of 18.626 surface casing with Inspector Eric Conrad to witness the surface cement job with Allied cement services to cement the casing using 801 sacks of class A 2% calcium .125 pps flowseal 100% open hole cement excess, 25 bbl 6% gel ran ahead. |
0069877607 | 2015-12-08 | Completion Testing | No Violations | Status check inspection on the well completion process found Baker Hughes pressure pumping service completing stage # 4 with Bass Well Head companys 10,000 psi rated well head assembly set on top of MiSwacos B section well sub base assembly. Allied Horizontal wireline service has set a solid completion plug at a measured depth of 18,045 and perforated the well with 60 perforations in 6 clusters between the depths of 18,029 and 17,884. 1000 gallons of 15% HCL was ran ahead of the stimulation process. |
0281061350 | 2015-11-09 | Preliminary Restoration | No Violations | Preliminary Restoration status check inspection fount the area affected by the well pad construction has been restored with proper erosion and vegetation control in place. Addressing the well status-the drilling process is now complete and the well is awaiting stimulation. A total of 8-400 barrel production tanks are in place inside a poly lined metal containment dike area. A total of 5 gas process separation units are in place to support each of the 5 existing wells on the pad. |
0602722632 | 2019-01-24 | Production Wells | No Violations | On this day, I found the pad gated with signage at the entrance. There are (5) producing wells, (1) additional well that has had only the conductor drilled and set, (5) gas processing units (GPU), (8) 400-barrel steel production tanks within polymer lined steel containment, and an Emergency Shutdown (ESD) button is present at the pad entrance. Additionally, concrete barriers surround the perimeter of the wellheads. Identification and annular pressure monitoring devices are present. The 9.625 inch diameter intermediate casing has a pressure of 0 pounds per square inch (psi), and the 13.375 inch diameter surface casing has a pressure of 100 psi. |
1064890679 | 2017-08-25 | Preliminary Restoration | No Violations | Preliminary Restoration status check inspection found the area affected by the well pad construction meets ORC 1509.072 with vegetation established and erosion control in place. The lease road is gated and identification signs are in place. There is emergency shut down devices at the well pad entry point and tank battery and also at the electrical service point for the gas processing units. The well is equipped with a casing and tubing head with flow lines attached to each well head outlet. A primary master valve is in place on the tubing head with (2) master valves present down stream in the production flow line. The casing head also has (2) master valves present. A gas processing unit is present on the well pad along with units supporting the other 4 wells on the pad. At the production facility a total of (8) steel construction 400 barrel capacity tanks are present inside a polymer lines steel containment dike area. Proper well head identification is posted at each well. Annular pressure monitoring gauges are present showing 1200 psi on the 9.625 diameter casing annulus and 100 psi on the 13.375 . Doug Stebbins with Antero was notified. |
1286566636 | 2020-3-31 0:00: | PW | No Violations | 1.00 |
1417374387 | 2014-11-30 | Casing String Witnessed | No Violations | The said well was spudded on 11/29/14 by Express Energys top hole rig with a 100 x 32 conductor borehole being drilled with the fresh water strata encountered at 76. 11/30/14-100 of 26 weld connection conductor was set and cemented by Express Energys cement service using 330 sacks of class A 2% calcium .25pps flake cement with 100% open hole cement excess ran and the cement displaced with 67 barrels of fresh water and good cement returns to surface. The cement mix water was tested for PH & Chlorides. |
1419790904 | 2014-12-28 | Drill / Deepen / Reopen | No Violations | Status check inspection on the drilling process found Dallas Morris rig # 24 skidding onto the well bore with the conductor casing previously set, they shall spud their surface borehole in the next 12 hours. |
1419968094 | 2014-12-30 | Casing String Witnessed | No Violations | I am onsite to witness the surface casing installation and cementing operations. Dallas Morris Rig 24 drilled 401 of 24 diameter hole. The rig crew then installed 400 of J-55 18.625 casing with a Texas shoe and a float collar. I performed a test of the cement mix water with a low range Quantab, the test indicated that the total dissolved chlorides were present at a concentration of 91 parts per million. Allied Oil and Gas Services pumped 801 sacks of class A cement with .125 pounds per sack flowseal and 2% CaCl into the casing with 50 barrels of the cement circulating back to surface. The plug was landed and the casing integrity test passed with no bleed off. |
1420422767 | 2015-01-04 | Drill / Deepen / Reopen | No Violations | Status check inspection of the drilling process found Dallas Morris rig # 24 on the hole with the 13.375 1st intermediate casing being set to a depth of 2,254 and cemented by Allied Cement service with good cement returns documented to surface. The rig is currently installing the Blow Out Preventer. |
1441984988 | 2015-09-11 | Drill / Deepen / Reopen | No Violations | |
1455719344 | 2016-02-17 | Completion Testing | No Violations | |
1678745093 | 2015-09-15 | Drill / Deepen / Reopen | No Violations | Status check inspection on the well drilling process found Patterson drilling rig 342 on location. It was reported by the company man on site that the 8.750 production borehole formation integrity test did not meet their breakdown requirement and they were preparing to spot a 37 barrel -205 sack Class G plug at a depth of 7,619. The plug will be spotted through the 5 drill string. |
1991793808 | 2018-03-07 | Production Wells | No Violations | On this day, I accompanied ODNR Inspector William Stolarik to witness a controlled annular pressure release of permit number 2-4551, into a tank. Please refer to his comments for a detailed report. We spoke with Antero company man Doug Stebbens about the process. The well is equipped with annular pressure monitoring devices. Concrete barriers surround the wellheads. The facility is gated with an electronic shutdown button on the left-hand side, prior to the pad. The front of the pad is equipped with (8) 400 barrel steel tanks within containment. There are (5) gas processing units along the back of the pad, and a midstream facility along the left side. |
2047996698 | 2018-03-07 | Production Wells | No Violations | On site inspection along with ODNR Inspector Tom Thomas and Antero employee Doug Stebbins. The intention of the inspection is to discuss and review annular pressures. The said well was observed to be in production and to have annular pressure gauges present on the 13.375 casing well head section and 9.625 casing well head section. The pressure between the internal of the 13.375 and external of the 9.625 was 125 psi. The pressure between the internal of the 9.625 diameter casing and the external of the 5.5 diameter production casing is 1,500 psi. I have asked the company to address the 1,500 psi on the 9.625 well head section and record the time it takes to blead the pressure off to a static level. The company will monitor and record the pressure every 24 hours in the proceeding days. |
281061350 | 2015-11-9 0:00: | PL | No Violations | |
602722632 | 2019-1-24 0:00: | PW | No Violations | 0.20 |
For data sources see[10]