X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-111-24554

Well Details

Well ID: 34-111-24554
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Summit Township
Operator Name: ANTERO RESOURCES CORPORATION
Well Pad ID: US-OH-001183
Farm/Lease Name: ULRICH UNIT
License Status: Producing
License Date: 2015-02-02
Spud Date: 2014-12-11
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2015-08-08
Well Total Depth: 16745.00 ft
Configuration: Horizontal
Latitude: 39.780000
Longitude: -81.270000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-12-02 Proposed Formations:POINT PLEASANT, Issued Date:12/2/2014, Expired Date:12/1/2016 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2015-02-02 Proposed Formations:POINT PLEASANT, Issued Date:2/2/2015, Expired Date:2/1/2017 12:00:00 PM, Drilling unit acres:574.075, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2015-08-08
Correction to Well 2015-11-06 CHANGE IN SURFACE, TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT,
Completion Report Received 2016-03-10
Construction Permit Expires 2017-02-01
Record Last Modified 2017-10-23

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2016-03-11 9036 16654 0
9036 16654 0
9036 16654 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 10/18/2015 10/29/2015 8542 11,427,600.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Antero Resources Base Fluid Water 7732-18-5 100 90.464 95,305,900.0
AI-302 U.S. Well Services Acid Corrosion Inhibitors 2-Propyn-1-olcompound with methyloxirane 38172-91-7 15 0.00006000 66.303
Water 7732-18-5 95 0.0004 419.919
WFRA-405 U.S. Well Services Friction Reducer Hydrated light distillate (petroleum) 64742-47-8 30 0.02219 23375.8
Water 7732-18-5 60 0.05513 58076.4
Ethoxylated alcohol blend 68002-97-1 4 0.00368 3871.76
2-Propenoic acid, polymer with 2 propenamide 9003-06-9 30 0.02756 29038.2
Sand U.S. Well Services, LLC Proppant Crystalline Silica, quartz 14808-60-7 100 8.99047 9,471,670.0
HCL Acid (12.6%-18.0%) U.S. Well Services, LLC Bulk Acid Hydrogen Chloride 7647-01-0 18 0.04339 45711.5
Water 7732-18-5 87.5 0.18165 191368
LGC-15 U.S. Well Services Gelling Agents Petroleum Distillates 64742-47-8 60 0.08067 84991.4
Suspending agent (solid) 14808-60-7 3 0.01303 13725.3
Surfactant 68439-51-0 3 0.00511 5384.55
Guar Gum 9000-30-0 50 0.08518 89742.5
K-BAC 1020 U.S. Well Services Anti-Bacterial Agent Deionized Water 7732-18-5 28 0.00269 2834.93
2,2-dibromo-3-nitrilopropionamide 10222-01-2 20 0.00471 4963.16
SI-1100 U.S. Well Services Scale Inhibitor Phosphino carboxylic acid polymer 71050-62-9 5 0.00081 848.386
Hexamethylene tramine penta (methylene phosphonic acid) 34690-00-1 5 0.00081 848.386
Copolymer of Maleic and Acrylic acid 52255-49-9 10 0.00146 1540.15
Potassium salt of diethylene triamine

penta (methylene phosphonic acid)

15827-60-8 7.5 0.00125 1321.53
Ethylene Glycol 107-21-1 25 0.0035 3687.22
Hexamethylene diamine penta (methylene phosphonic acid) 23605-74-5 2 0.00032 339.355
Water 7732-18-5 80 0.00991 10441.7
AP One U.S. Well Services Gel Breakers Ammonium Persulfate 7727-54-0 100 0.00205 2158

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
0 0 0
2015-10-18 H2O 15 6174 Bbl 92100 US Well Services Inc STAGE 1/44

60 SHOTS STAGES 2-43

2015-10-29 H2O 15 5674 Bbl 230100 US Well Services Inc STAGE44/44

60 SHOTS

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2015 ANTERO RESOURCES CORPORATION 0 0 28
2016 ANTERO RESOURCES CORPORATION 3045039 367 363
2017 ANTERO RESOURCES CORPORATION 1145878 224 365
2018 ANTERO RESOURCES CORPORATION 781656 343 363
2019 ANTERO RESOURCES CORPORATION 157878 120 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2015 ANTERO RESOURCES CORPORATION Brine 0 28
2016 ANTERO RESOURCES CORPORATION Brine 73879 363
2017 ANTERO RESOURCES CORPORATION Brine 5838 365
2018 ANTERO RESOURCES CORPORATION Brine 3688 363
2019 ANTERO RESOURCES CORPORATION Brine 747 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1074825355 2015-3-4 0:00:0 DD No Violations 1.20
-1182426826 2014-12-12 0:00 CS No Violations 7.00
-1422545901 2015-3-8 0:00:0 DD No Violations 1.00
-143412068 2020-4-22 0:00: PW No Violations 1.00
-1896367580 2015-10-23 0:00 CT No Violations 2.00
-68582795 2015-3-1 0:00:0 DD No Violations 1.50
-874778107 2019-2-7 0:00:0 PW No Violations 0.10
0068582795 2015-03-01 Drill / Deepen / Reopen No Violations Status check inspection on the current well bore drilling status found Sidewinder Drilling rig #54 on location drilling the 12.250 2nd intermediate wellbore at a current measured depth of 4,937with a current wellbore directional azimuth of 86 degrees and a 11 degree nudge started at a depth of 2,175 placing the well bore at 67 off center line following the proposed submitted wellbore plan.
0078017505 2015-02-17 Drill / Deepen / Reopen No Violations My inspection today finds the drilling rig is currently rigging up. The company representative anticipates beginning to drill the surface hole late tonight.
0866503653 2018-03-02 Production Wells No Violations Status check inspection found the well pad entry point is gated and locked with signage posted. The lease road is graveled along with the well pad, both are in good repair. Addressing the well head - The well is equipped with a B section along with a 9.65 and 5.5 casing well head section and a tubing well head. The tubing well head has 2 manually controlled valves and one emergency shut down valve. Annular pressure monitoring is in place with 0 (psi) pound per square inch indicated between the 9.65 and 13.375 and 0 psi between the 5.5 and 9.625. Proper well identification is posted at the well head. Also on location is (4) gas processing units one for each well head on location. At the right front corner of the well pad is the production fluid storage area consisting of a total of 8 steel construction tanks all situated inside a polymer lined steel containment dike area. Emergency shut down devices are situated at the well pad entrance and at the tank battery loading site. 3 additional cellars were set on the pad but only one additional well was spudded.
0874778107 2019-02-07 Production Wells No Violations On this day, I found the pad gated with signage at the entrance. There are (4) producing wells, (1) with conductor only, (4) gas processing units, (8) 400-barrel steel production tanks within polymer-lined steel containment, and an Emergency Shutdown (ESD) button is present at the pad entrance. Concrete barriers surround the perimeter of the wellheads. Each well has identification and annular pressure monitoring devices equipped. The 9.625 inch diameter intermediate casing has a pressure of 0 pounds per square inch (psi), and the 13.375 inch diameter surface casing has a pressure of 0 psi.
1074825355 2015-03-04 Drill / Deepen / Reopen No Violations Status check inspection on the current drilling process found Sidewinder drilling rig # 54 on location drilling the 12.250 2nd intermediate well bore at a current depth of 7,084 with a proposed total depth to be drilled of 7,441.
1182426826 2014-12-12 Casing String Witnessed No Violations I am onsite to witness the casing installation and cementing operations of the conductor casing string. Express Energy Services drilled 100 of 32 hole with an auger rig. Express then ran 100 of 26 .375 wall weld casing in the well. The cement mix water was tested with a low range Quantab and registered 82 parts per million total chlorides. The casing was cemented by circulating 330 sacks of class A cement with .5 pounds per sack flowseal and 2% CaCl into the annular space. I witnessed 11 barrels of cement return to surface and remain static. Three feet of cement was left in the cellar to ensure a liquid tight seal.
1422545901 2015-03-08 Drill / Deepen / Reopen No Violations Status check inspection on the current drilling process found Sidewinder Drilling rig # 54 on location and the 12.250 2nd intermediate well bore total drilling depth recently reached at 7,505 with 7,474 of 9.625 40# casing ran in the well bore and cemented by CalFrac cement service on 03/06/2015.
1424339719 2015-02-19 Casing String Witnessed No Violations 02/19/2015 Sidewinder drilling rig # 54 is now on location and has drilled a 359 x 24 surface borehole and ran 354 of 18.625 surface casing. Calfrac Cement Service was on location to cement the casing using 593 sacks of class A-3% calcium-.25 pps celloflake 70% open hole excess cement with the cement mix water tested for PH & Chlorides and circulation established prior to cementing with good cement returns witnessed to surface and the casing pressure tested to 500 psi over lift pressure.
1424808505 2015-02-24 Drill / Deepen / Reopen No Violations Status check inspection on the current drilling progress found Sidewinder drilling rig 54 on location with the 17.5 1st intermediate well bore drilling depth recently reached at 2,104 and 2,088 of 13.375 J-55 casing set and cemented to surface by Calfrac cement service. The rig is hooking up the Blow Out Preventer and preparing to begin drilling the 12.250 2nd intermediate wellbore.
1455734328 2016-02-17 Preliminary Restoration No Violations Preliminary Restoration and status check inspection to document the well drilling and completion process is now complete with the well now in line and capable of production. The well is in the completion flow back testing stages and is being flowed through 2 vertical sand trap separators and a gas processing unit. Addressing the production fluid storage tank pad which is adjacent to the well pad, upon inspection of the production fluid facility a total of (8) Eight -400 barrel capacity tanks are present in a polymer lined metal containment dike area with proper identification posted. Addressing the Preliminary Restoration- upon inspection it was observed that the area affected by the well pad construction has proper vegetation established with erosion control in place.
1896367580 2015-10-23 Completion Testing No Violations My inspection today finds US Well Service is providing hydraulic stimulation services on stage 20. All volumes and pressures will be recorded in the stimulation report.
2048308553 2016-04-21 Preliminary Restoration No Violations Upon inspection it was observed that the area affected by the well pad construction has erosion control and vegetation established and the site meets ORC 1509.072. Also noted the landowner-farmer has began to till the ground along the lease road in preparation of the planting process. Addressing the well head- The drilling and completion process is now compete and the well is in production with 4 dehydration units on location supporting each of the existing wells present. A total of 8-400 barrel capacity production tanks are present at a separate production pad at the rear and adjacent to the well pad.
78017505 2015-2-17 0:00: DD No Violations 2.00
866503653 2018-3-2 0:00:0 PW No Violations 0.20

For data sources see[10]

References