X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-111-24555

Well Details

Well ID: 34-111-24555
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Summit Township
Operator Name: ANTERO RESOURCES CORPORATION
Well Pad ID: US-OH-001183
Farm/Lease Name: ULRICH UNIT
License Status: Producing
License Date: 2015-02-02
Spud Date: 2014-12-05
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2015-07-14
Well Total Depth: 16150.00 ft
Configuration: Horizontal
Latitude: 39.780000
Longitude: -81.270000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-12-02 Proposed Formations:POINT PLEASANT, Issued Date:12/2/2014, Expired Date:12/1/2016 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2015-02-02 Proposed Formations:POINT PLEASANT, Issued Date:2/2/2015, Expired Date:2/1/2017 12:00:00 PM, Drilling unit acres:574.075, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2015-07-14
Correction to Well 2015-11-06 CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT.
Completion Report Received 2016-03-10
Construction Permit Expires 2017-02-01
Record Last Modified 2017-10-23

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2016-03-11 8650 16062 0
8650 16062 0
8650 16062 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 11/12/2015 11/24/2015 8518 11,024,100.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Antero Resources Base Fluid Water 7732-18-5 100 89.9099 91,941,200.0
K-BAC 1020 U.S. Well Services Anti-Bacterial Agent 2,2-dibromo-3-nitrilopropionamide 10222-01-2 20 0.00403 4116.89
Deionized Water 7732-18-5 28 0.0023 2351.55
AP One U.S. Well Services Gel Breakers Ammonium Persulfate 7727-54-0 100 0.00219 2240
AI-302 U.S. Well Services Acid Corrosion Inhibitors Water 7732-18-5 95 0.0005 514.995
2-Propyn-1-olcompound with methyloxirane 38172-91-7 15 0.00008000 81.315
SI-1100 U.S. Well Services Scale Inhibitor Hexamethylene tramine penta (methylene phosphonic acid) 34690-00-1 5 0.00083 850.555
Potassium salt of diethylene triamine

penta (methylene phosphonic acid)

15827-60-8 7.5 0.0013 1324.9
Copolymer of Maleic and Acrylic acid 52255-49-9 10 0.00151 1544.08
Phosphino carboxylic acid polymer 71050-62-9 5 0.00083 850.555
Hexamethylene diamine penta (methylene phosphonic acid) 23605-74-5 2 0.00033 340.222
Ethylene Glycol 107-21-1 25 0.00361 3696.64
Water 7732-18-5 80 0.01024 10468.4
HCL Acid (12.6%-18.0%) U.S. Well Services, LLC Bulk Acid Hydrogen Chloride 7647-01-0 18 0.05492 56159.9
Water 7732-18-5 87.5 0.22991 235109
LGC-15 U.S. Well Services Gelling Agents Guar Gum 9000-30-0 50 0.05778 59084
Petroleum Distillates 64742-47-8 60 0.05472 55956
Surfactant 68439-51-0 3 0.00347 3545.04
Suspending agent (solid) 14808-60-7 3 0.00884 9036.37
WFRA-405 U.S. Well Services Friction Reducer Hydrated light distillate (petroleum) 64742-47-8 30 0.02054 21001.1
2-Propenoic acid, polymer with 2 propenamide 9003-06-9 30 0.02551 26088.4
Ethoxylated alcohol blend 68002-97-1 4 0.0034 3478.45
Water 7732-18-5 60 0.05102 52176.7
Sand U.S. Well Services, LLC Proppant Crystalline Silica, quartz 14808-60-7 100 9.55219 9,767,990.0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2015-11-12 H2O 0 6586 Bbl 237800 US Well Services Inc STAGE 1/42

60 SHOTS STAGES 2-41 SEE IMAGES

2015-11-24 H2O 0 5723 Bbl 240615 US Well Services Inc STAGE 42/42

60 SHOTS

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2015 ANTERO RESOURCES CORPORATION 0 0 28
2016 ANTERO RESOURCES CORPORATION 2488274 308 363
2017 ANTERO RESOURCES CORPORATION 779331 152 365
2018 ANTERO RESOURCES CORPORATION 473052 220 362
2019 ANTERO RESOURCES CORPORATION 91069 69 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2015 ANTERO RESOURCES CORPORATION Brine 0 28
2016 ANTERO RESOURCES CORPORATION Brine 60927 363
2017 ANTERO RESOURCES CORPORATION Brine 3968 365
2018 ANTERO RESOURCES CORPORATION Brine 2239 362
2019 ANTERO RESOURCES CORPORATION Brine 431 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1218012118 2020-4-22 0:00: PW No Violations 1.00
-1636641446 2015-1-27 0:00: CS No Violations 6.00
-1722152734 2019-2-7 0:00:0 PW No Violations 0.10
-206075749 2018-3-2 0:00:0 PW No Violations 0.30
-2111999018 2016-4-21 0:00: PL No Violations 0.50
0039694118 2016-02-17 Preliminary Restoration No Violations Preliminary Restoration and status check inspection to document the well drilling and completion process is now complete with the well now in line and capable of production. The well is in the completion flow back testing stages and is being flowed through 2 vertical sand trap separators and a gas processing unit. Addressing the production fluid storage tank pad which is adjacent to the well pad, upon inspection of the production fluid facility a total of (8) Eight -400 barrel capacity tanks are present in a polymer lined metal containment dike area with proper identification posted. Addressing the Preliminary Restoration- upon inspection it was observed that the area affected by the well pad construction has proper vegetation established with erosion control in place.
0206075749 2018-03-02 Production Wells No Violations Status check inspection found the well pad entry point is gated and locked with signage posted. The lease road is graveled along with the well pad, both are in good repair. Addressing the well head - The well is equipped with a B section along with a 9.65 and 5.5 casing well head section and a tubing well head. The tubing well head has 2 manually controlled valves and one emergency shut down valve. Annular pressure monitoring is in place with 0 (psi) pound per square inch indicated between the 9.65 and 13.375 and 50 psi between the 5.5 and 9.625. Proper well identification is posted at the well head. Also on location is (4) gas processing units one for each well head on location. At the rear of the well pad is the production fluid storage area consisting of a total of 8 steel construction tanks all situated inside a polymer lined steel containment dike area. Emergency shut down devices are situated at the well pad entrance and at the tank battery loading site. 3 additional cellars were set on the pad but only one of the wells were spudded.
0211083763 2015-07-09 Drill / Deepen / Reopen No Violations Status check inspection on the well drilling progress found Patterson Drilling rig # 340 on location drilling the 8.750 production borehole at a current depth of 13,716 in the horizontal well bore section using 12.45# synthetic oil based drilling mud and implementing managed pressure drilling. The well bore inclination is 90.71 degrees and directional azimuth is 329.36 degrees with a true vertical depth of 8,445.
1024419301 2015-01-18 Drill / Deepen / Reopen No Violations Status check inspection on the current drilling process found Sidewinder drilling rig # 54 on location drilling the 17.5 1st intermediate well bore section at a depth of 2,099. The company should TD this section in the next 8 hours.
1417931044 2014-12-07 Casing String Witnessed No Violations The said well was spudded on 12/05/2014 by Express Energys top hole rig service with a 32 x 100 conductor borehole being drilled. On 12/06/2014 I arrived on location @ 22:00 hours to witness the cementing of the 26 x 100 conductor pipe with Express Energy Cement Service on location to cement the casing using 330 sacks of class A-2% calcium .50 pps flake 100% open hole cement excess to be used, upon inspection of the mix water it was discovered that mist water had been put into the fresh water tank and a Quantab test showed over 700 parts per million chlorides. I then required the company to bring in fresh water and not use the water in that tank. The casing was then cemented with good cement returns witnessed to surface.
1421130824 2015-01-13 Casing String Witnessed No Violations 01/13/2015 Sidewinder drilling rig #54 is now on location and has drilled a 24 x 377 surface borehole and ran 359 of 87.5# J-55 18.625 casing with O-Tex cement service on location to cement the casing using 657 sacks of class A 2% calcium .25 pps flake 70% open hole excess cement with the mix water tested for chlorides and ph prior to cementing and the plug landed and the casing tested to 500 psi over lift pressure with good cement returns to surface.
1636641446 2015-01-27 Casing String Witnessed No Violations
1722152734 2019-02-07 Production Wells No Violations On this day, I found the pad gated with signage at the entrance. There are (4) producing wells, (1) with conductor only, (4) gas processing units, (8) 400-barrel steel production tanks within polymer-lined steel containment, and an Emergency Shutdown (ESD) button is present at the pad entrance. Concrete barriers surround the perimeter of the wellheads. Each well has identification and annular pressure monitoring devices equipped. The 9.625 inch diameter intermediate casing has a pressure of 50 pounds per square inch (psi), and the 13.375 inch diameter surface casing has a pressure of 0 psi.
211083763 2015-7-9 0:00:0 DD No Violations 1.50
2111999018 2016-04-21 Preliminary Restoration No Violations Upon inspection it was observed that the area affected by the well pad construction has erosion control and vegetation established and the site meets ORC 1509.072. Also noted the landowner-farmer has began to till the ground along the lease road in preparation of the planting process. Addressing the well head- The drilling and completion process is now compete and the well is in production with 4 dehydration units on location supporting each of the existing wells present. A total of 8-400 barrel capacity production tanks are present at a separate production pad at the rear and adjacent to the well pad.
39694118 2016-2-17 0:00: PL No Violations 0.50

For data sources see[10]

References