If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-111-24556 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.78,"lon":-81.27,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Summit Township | |
Operator Name: ANTERO RESOURCES CORPORATION | |
Well Pad ID: US-OH-001183 | |
Farm/Lease Name: ULRICH UNIT | |
License Status: Producing | |
License Date: 2015-02-02 | |
Spud Date: 2014-12-04 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2015-07-03 | |
Well Total Depth: 16661.00 ft | |
Configuration: Horizontal | |
Latitude: 39.780000 | |
Longitude: -81.270000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-12-02 | Proposed Formations:POINT PLEASANT, Issued Date:12/2/2014, Expired Date:12/1/2016 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2015-02-02 | Proposed Formations:POINT PLEASANT, Issued Date:2/2/2015, Expired Date:2/1/2017 12:00:00 PM, Drilling unit acres:574.075, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2015-07-03 | |
Correction to Well | 2015-11-06 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Completion Report Received | 2016-03-10 | |
Construction Permit Expires | 2017-02-01 | |
Record Last Modified | 2017-10-23 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2016-03-10 | 9085 | 16568 | 0 |
9085 | 16568 | 0 | |
9085 | 16568 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 11/25/2015 | 12/06/2015 | 8508 | 11,207,200.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Antero Resources | Base Fluid | Water | 7732-18-5 | 100 | 90.3735 | 93,468,000.0 |
AP One | U.S. Well Services | Gel Breakers | Ammonium Persulfate | 7727-54-0 | 100 | 0.00184 | 1901 | |
LGC-15 | U.S. Well Services | Gelling Agents | Surfactant | 68439-51-0 | 3 | 0.00367 | 3799.99 | |
Petroleum Distillates | 64742-47-8 | 60 | 0.05799 | 59980.2 | ||||
Suspending agent (solid) | 14808-60-7 | 3 | 0.00937 | 9686.24 | ||||
Guar Gum | 9000-30-0 | 50 | 0.06124 | 63333.1 | ||||
SI-1100 | U.S. Well Services | Scale Inhibitor | Water | 7732-18-5 | 80 | 0.01014 | 10488.4 | |
Hexamethylene tramine penta (methylene phosphonic acid) | 34690-00-1 | 5 | 0.00082 | 852.181 | ||||
Phosphino carboxylic acid polymer | 71050-62-9 | 5 | 0.00082 | 852.181 | ||||
Potassium salt of diethylene triamine
penta (methylene phosphonic acid) |
15827-60-8 | 7.5 | 0.00128 | 1327.44 | ||||
Copolymer of Maleic and Acrylic acid | 52255-49-9 | 10 | 0.0015 | 1547.04 | ||||
Hexamethylene diamine penta (methylene phosphonic acid) | 23605-74-5 | 2 | 0.00033 | 340.872 | ||||
Ethylene Glycol | 107-21-1 | 25 | 0.00358 | 3703.71 | ||||
WFRA-405 | U.S. Well Services | Friction Reducer | Ethoxylated alcohol blend | 68002-97-1 | 4 | 0.00377 | 3897.12 | |
Water | 7732-18-5 | 60 | 0.05652 | 58456.7 | ||||
Hydrated light distillate (petroleum) | 64742-47-8 | 30 | 0.02275 | 23528.8 | ||||
2-Propenoic acid, polymer with 2 propenamide | 9003-06-9 | 30 | 0.02826 | 29228.4 | ||||
K-BAC 1020 | U.S. Well Services | Anti-Bacterial Agent | Deionized Water | 7732-18-5 | 28 | 0.00238 | 2461.3 | |
2,2-dibromo-3-nitrilopropionamide | 10222-01-2 | 20 | 0.00417 | 4309.03 | ||||
HCL Acid (12.6%-18.0%) | U.S. Well Services, LLC | Bulk Acid | Hydrogen Chloride | 7647-01-0 | 18 | 0.04462 | 46146.9 | |
Water | 7732-18-5 | 87.5 | 0.18679 | 193190 | ||||
AI-302 | U.S. Well Services | Acid Corrosion Inhibitors | 2-Propyn-1-olcompound with methyloxirane | 38172-91-7 | 15 | 0.00006000 | 66.303 | |
Water | 7732-18-5 | 95 | 0.00041 | 419.919 | ||||
Sand | U.S. Well Services, LLC | Proppant | Crystalline Silica, quartz | 14808-60-7 | 100 | 9.12422 | 9,436,650.0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2015-12-06 | H2O | 15 | 6055 Bbl | 174510 | US Well Services Inc | STAGE 43/43
60 SHOTS |
2015-11-25 | H2O | 15 | 6711 Bbl | 174900 | US Well Services Inc | STAGE 1/43
60 SHOTS STAGES 2-41 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | ANTERO RESOURCES CORPORATION | 0 | 0 | 28 |
2016 | ANTERO RESOURCES CORPORATION | 2262242 | 192 | 363 |
2017 | ANTERO RESOURCES CORPORATION | 812960 | 159 | 365 |
2018 | ANTERO RESOURCES CORPORATION | 496482 | 175 | 362 |
2019 | ANTERO RESOURCES CORPORATION | 91436 | 70 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | ANTERO RESOURCES CORPORATION | Brine | 0 | 28 |
2016 | ANTERO RESOURCES CORPORATION | Brine | 33876 | 363 |
2017 | ANTERO RESOURCES CORPORATION | Brine | 4144 | 365 |
2018 | ANTERO RESOURCES CORPORATION | Brine | 2348 | 362 |
2019 | ANTERO RESOURCES CORPORATION | Brine | 437 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1665163105 | 2016-4-21 0:00: | PL | No Violations | 0.80 |
-2064381648 | 2014-12-26 0:00 | PB | No Violations | 1.90 |
-424875601 | 2014-12-28 0:00 | DD | No Violations | 1.30 |
-669449845 | 2015-6-30 0:00: | DD | No Violations | |
-909894609 | 2014-12-21 0:00 | DD | No Violations | |
-912295382 | 2014-12-16 0:00 | CS | No Violations | 6.00 |
0424875601 | 2014-12-28 | Drill / Deepen / Reopen | No Violations | Status check inspection on the drilling process found Sidewinder drilling rig # 54 on location with a borehole deviation plug being set on 12/26/14 and allowed to cure. The rig has ran in the hole with a tri cone bit and tagged the top of the cement plug @ 2,010 and dressed the plug off down to 2,159 and pulled out of the hole with the tri cone and they are currently picking up directional tools to run in the hole to begin a directional borehole nudge around the 12.250 lost hammer assembly @ 2,387. |
0465454400 | 2018-03-02 | Production Wells | No Violations | Status check inspection found the well pad entry point is gated and locked with signage posted. The lease road is graveled along with the well pad, both are in good repair. Addressing the well head - The well is equipped with a B section along with a 9.65 and 5.5 casing well head section and a tubing well head. The tubing well head has 2 manually controlled valves and one emergency shut down valve. Annular pressure monitoring is in place with 0 (psi) pound per square inch indicated between the 9.65 and 13.375 and 1,000 psi between the 5.5 and 9.625. Proper well identification is posted at the well head. Also on location is (4) gas processing units one for each well head on location. At the rear of the well pad is the production fluid storage area consisting of a total of 8 steel construction tanks all situated inside a polymer lined steel containment dike area. Emergency shut down devices are situated at the well pad entrance and at the tank battery loading site. 3 additional cellars were set on the pad but only one of the wells were spudded. |
0559148463 | 2016-02-17 | Preliminary Restoration | No Violations | Preliminary Restoration and status check inspection to document the well drilling and completion process is now complete with the well now in line and capable of production. The well is in the completion flow back testing stages and is being flowed through 2 vertical sand trap separators and a gas processing unit. Addressing the production fluid storage tank pad which is adjacent to the well pad, upon inspection of the production fluid facility a total of (8) Eight -400 barrel capacity tanks are present in a polymer lined metal containment dike area with proper identification posted. Addressing the Preliminary Restoration- upon inspection it was observed that the area affected by the well pad construction has proper vegetation established with erosion control in place. |
0659463099 | 2019-02-07 | Production Wells | No Violations | On this day, I found the pad gated with signage at the entrance. There are (4) producing wells, (1) with conductor only, (4) gas processing units, (8) 400-barrel steel production tanks within polymer-lined steel containment, and an Emergency Shutdown (ESD) button is present at the pad entrance. Concrete barriers surround the perimeter of the wellheads. Each well has identification and annular pressure monitoring devices equipped. The 9.625 inch diameter intermediate casing has a pressure of 1,000 pounds per square inch (psi), and the 13.375 inch diameter surface casing has a pressure of 0 psi. |
0669449845 | 2015-06-30 | Drill / Deepen / Reopen | No Violations | Status check inspection on the current well drilling status found Patterson Drilling rig # 340 on location with the 8.750 well bore total drilling measured depth recently reached at 16,661 in the directional azimuth of 332.37 degrees with a borehole inclination of 90.98 degrees and true vertical depth of 8,399.45. The rig is currently pulling the 5 drill string in preparation to run the 5.5 production casing. |
0846023733 | 2015-06-22 | Drill / Deepen / Reopen | No Violations | Status check inspection found Patterson Drilling rig 340 on location drilling the 8.750 production borehole at a measured depth of 7,461 with the rig currently conducting a formation integrity test of the 9.625 casing shoe after conducting a plug back operation on 06/20/2015 to attempt to gain a higher test pressure before breakdown. |
0909894609 | 2014-12-21 | Drill / Deepen / Reopen | No Violations | Sidewinder rig#54 on well and they were at 2079 deep at the time of my inspection. |
0912295382 | 2014-12-16 | Casing String Witnessed | No Violations | I am onsite to witness the surface casing installation and cementing operations. Sidewinder Rig 54 drilled 378 of 24 diameter hole. The rig crew then installed 358 of J-55 18.625 casing. I performed a test of the cement mix water with a low range Quantab, the test indicated that the total dissolved chlorides were present at a concentration of 32 parts per million. Allied Oil and Gas Services pumped 695 sacks of class A cement with .25 pounds per gallon flowseal and 2% CaCl into the casing with 45 barrels of the cement returning to surface. The plug was landed and the casing integrity test passed with only minimal bleed off. |
1417820183 | 2014-12-05 | Casing String Witnessed | No Violations | The said well was spudded on 12/04/2014 by Express Energys top hole rig with a 100 x 32 conductor borehole being drilled and Express Energys cement service on location to cement the casing using 330 sacks of class A 2% calcium .25 pps flake with circulation established prior to cementing and 100% open hole cement excess ran with good cement returns to surface. No fresh water was encountered during the drilling of the borehole. |
1665163105 | 2016-04-21 | Preliminary Restoration | No Violations | Upon inspection it was observed that the area affected by the well pad construction has erosion control and vegetation established and the site meets ORC 1509.072. Also noted the landowner-farmer has began to till the ground along the lease road in preparation of the planting process. Addressing the well head- The drilling and completion process is now compete and the well is in production with 4 dehydration units on location supporting each of the existing wells present. A total of 8-400 barrel capacity production tanks are present at a separate production pad at the rear and adjacent to the well pad. |
1667876178 | 2015-01-04 | Drill / Deepen / Reopen | No Violations | Status check inspection of the current drilling process found Sidewinder Drilling rig 54 on location drilling the 12.250 2nd intermediate well bore at a depth of 6,829. The rig has pulled the drill string and is making repairs to the top drive assembly. |
2064381648 | 2014-12-26 | Plug / Plug Back | No Violations | On site inspection @ 5:30 am to witness a deviation plug set in the 12.250 section due to a lost hammer bit assembly at a depth of 2,387, with the top of the lost assembly marked at 2,351. Sidewinder Drilling rig # 54 is on the hole and has spotted the 4.5 drill string at a depth of 1,894 with the borehole dry. Allied cement services will spot a 68.5 bbl 319 sack Class A 3% calcium plug and displace with 25.3 bbl of fresh water. The 13.375 is set to 2,059 and the company will drill the cement out from under the 13.375 and deviate around the lost 12.250 assembly. |
465454400 | 2018-3-2 0:00:0 | PW | No Violations | 0.20 |
559148463 | 2016-2-17 0:00: | PL | No Violations | 0.40 |
634859363 | 2020-4-22 0:00: | PW | No Violations | 1.00 |
659463099 | 2019-2-7 0:00:0 | PW | No Violations | 0.10 |
846023733 | 2015-6-22 0:00: | DD | No Violations | 2.00 |
For data sources see[10]