X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-111-24613

Well Details

Well ID: 34-111-24613
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Summit Township
Operator Name: ANTERO RESOURCES CORPORATION
Well Pad ID: US-OH-001310
Farm/Lease Name: CLARA UNIT
License Status: Producing
License Date: 2015-09-10
Spud Date: 2015-09-17
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2016-02-06
Well Total Depth: 17845.00 ft
Configuration: Horizontal
Latitude: 39.800000
Longitude: -81.250000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2015-09-10 Proposed Formations:POINT PLEASANT, Issued Date:9/10/2015, Expired Date:9/9/2017 12:00:00 PM, Drilling unit acres:690.723, Proposed Well Type:OG, Proposed Well Class:POOL
Correction to Well 2015-11-27 UPDATE TO UNIT SIZE.
Reached Total Depth 2016-02-06
Correction to Well 2016-04-22 CHANGE ACREAGE/TARGET/TAKEPOINT PER AS DRILLED PLAT-ALE
Completion Report Received 2016-10-11
Construction Permit Expires 2017-09-09
Record Last Modified 2017-10-23

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2016-10-11 8723 17760 0
8723 17760 0
8723 17760 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 07/08/2016 07/20/2016 8617 15,032,300.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Sand U.S. Well Services, LLC Proppant Crystalline Silica, quartz 14808-60-7 100 12.6816 18,285,700.0
Water Antero Resources Base Fluid Water 7732-18-5 100 86.9467 125,370,000.0
LGC-15 U.S. Well Services Gelling Agents Suspending agent (solid) 14808-60-7 3 0.00381 5488.44
Surfactant 68439-51-0 3 0.00149 2153.16
Petroleum Distillates 64742-47-8 60 0.02357 33986.1
Guar Gum 9000-30-0 50 0.02489 35885.9
SI-1100s U.S. Well Services Scale Inhibitor Potassium salt of diethylene triamine

penta (methylene phosphonic acid)

15827-60-8 7.5 0.00122 1764.85
Hexamethylene tramine penta (methylene phosphonic acid) 34690-00-1 5 0.00079 1132.99
Hexamethylene diamine penta (methylene phosphonic acid) 23605-74-5 2 0.00031 453.196
Phosphino carboxylic acid polymer 71050-62-9 5 0.00079 1132.99
Copolymer of Maleic and Acrylic acid 52255-49-9 10 0.00143 2056.81
Water 7732-18-5 80 0.00967 13944.5
K-BAC 1020 U.S. Well Services Anti-Bacterial Agent 2,2-dibromo-3-nitrilopropionamide 10222-01-2 20 0.00396 5703.13
Deionized Water 7732-18-5 28 0.00226 3257.6
AP One U.S. Well Services Gel Breakers Ammonium Persulfate 7727-54-0 100 0.00093 1340
WFRA-405 U.S. Well Services Friction Reducer Ethoxylated alcohol blend 68002-97-1 4 0.00378 5443.68
2-Propenoic acid, polymer with 2 propenamide 9003-06-9 30 0.02831 40827.6
Water 7732-18-5 60 0.05663 81655.3
Hydrated light distillate (petroleum) 64742-47-8 30 0.02279 32866.2
HCL Acid (12.6%-18.0%) U.S. Well Services, LLC Bulk Acid Water 7732-18-5 87.5 0.14915 215061
Hydrogen Chloride 7647-01-0 18 0.03563 51371.1
AI-302 U.S. Well Services Acid Corrosion Inhibitors Water 7732-18-5 95 0.00032 467.457
2-Propyn-1-olcompound with methyloxirane 38172-91-7 15 0.00005000 73.809

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2016-07-20 H2O 0 6286 Bbl 3522020 US Well Services Inc STAGE 52/52

60 SHOTS

2016-07-08 H2O 0 6875 Bbl 352020 US Well Services Inc STAGE 1/52

60 /SHOTS STAGES 2-51 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2016 ANTERO RESOURCES CORPORATION 1535192 210 122
2017 ANTERO RESOURCES CORPORATION 1852380 359 364
2018 ANTERO RESOURCES CORPORATION 767180 317 365
2019 ANTERO RESOURCES CORPORATION 139987 107 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2016 ANTERO RESOURCES CORPORATION Brine 36099 122
2017 ANTERO RESOURCES CORPORATION Brine 18665 364
2018 ANTERO RESOURCES CORPORATION Brine 6512 365
2019 ANTERO RESOURCES CORPORATION Brine 1181 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1065797898 2015-12-15 0:00 PW No Violations 2.00
-118061449 2016-9-22 0:00: PL No Violations 0.60
-719415068 2018-3-2 0:00:0 PL No Violations 0.20
0069868036 2018-03-13 Production Wells No Violations On site inspection to document annular pressure on the well head. The 13.375 well head section has 10 pounds per square inch pressure and the 9.625 well head section has 50 pounds per square inch pressure. Crews were scheduled to be on site this morning to hook up flow back iron and flow test the Clara 4-H annular pressure to begin a time pressure study of the well. I spoke with Antero production supervisor Doug Stebbins who indicated they were running behind and would not be ready until the afternoon.
0118061449 2016-09-22 Preliminary Restoration No Violations Preliminary Restoration status check inspection accompanying Inspector Bill Stolarik. Addressing the restoration of the area affected by the well pad construction; upon inspection it was observed that there is erosion control and vegetation in place according to ORC 1509.072. There is 4 wells in production on the well pad with a total of 8 -400 barrel production tanks present.
0513198076 2015-09-18 Casing String Witnessed No Violations The said well was spudded on 09/17/2015 by Express Energys top hole rig with a 32 x 100 conductor borehole being drilled. 09/18/2015 the conductor was set and cemented by Express Energy Cement service using 330 sacks of Class A cement with circulation established prior to cementing and the cement displaced with 55 barrels of fresh water and good cement returns witnessed to surface.
0719415068 2018-03-02 Preliminary Restoration No Violations Preliminary Restoration status check inspection found the well site meets ORC 1509.072. The well pad entry point is gated and locked with signage posted. The lease road is graveled along with the well pad, both are in good repair. Addressing the well head - The well is equipped with a B section along with a 9.65 and 5.5 casing well head section and a tubing well head. The tubing well head has 2 manually controlled valves and one emergency shut down valve. Annular pressure monitoring is in place with 20 (psi) pound per square inch indicated between the 9.65 and 13.375 and 50 psi between the 5.5 and 9.625. Proper well identification is posted at the well head. Also on location is (4) gas processing units one for each well head on location. At the right front corner of the well pad is the production fluid storage area consisting of a total of 8 steel construction tanks all situated inside a polymer lined steel containment dike area. Emergency shut down devices are situated at the well pad entrance and at the tank battery loading site. Antero Production Superintendent Doug Stebbins was contacted on this day and met with me on site to discuss annular pressure.
1005379361 2017-02-21 Production Wells No Violations Production well status check inspection found the well drilling and stimulation process is complete and the well is in production. There is 4 gas processing units on location one associated with each well on the pad. There is a total of 8 production tanks each with a total capacity of 800 barrels. The lease road is in good repair and a Myers water truck was on location removing production fluid from the production tanks. No standing water was observed inside the tank battery or on location.
1065797898 2015-12-15 Production Wells No Violations Status check inspection on the current drilling progress. On this day I was accompanied by ODNR MRI 2 Jim Nicholson and the following was observed-
1116195403 2019-02-07 Production Wells No Violations On this day, I found the pad gated with signage at the entrance. There are (4) producing wells, (4) gas processing units, (8) 400-barrel steel production tanks within polymer-lined steel containment, and an Emergency Shutdown (ESD) button is present at the pad entrance. Concrete barriers surround the perimeter of the wellheads. Each well has identification and annular pressure monitoring devices equipped. The 9.625 inch diameter intermediate casing has a pressure of 50 pounds per square inch (psi), and the 13.375 inch diameter surface casing has a pressure of 0 psi.
1449818719 2015-12-11 Casing String Witnessed No Violations On site inspection to witness the surface casing cement job found Patterson Drilling rig 332 is now on the hole and has drilled a 17.5 surface hole to a measured depth of 1,361 and ran 1,360 of 54.5lb/ft J-55 casing with the following casing equipment ran-a guide shoe and float collar along with 8 centralizers. CalFrac Cement Service was on location to cement the casing using 1291 sacks of class A-50% open hole excess cement with circulation established prior to cementing and 40 barrels of 6% gel Viscous spacer ran ahead of the cement and the casing pressure tested to 500 psi over lift pressure upon the landing of the cement plug with good cement returns witnessed to surface. The cement mix water was tested for PH & Chloride proper levels prior to cementing.
1454348991 2016-02-01 Drill / Deepen / Reopen No Violations
1892236475 2016-09-22 Preliminary Restoration No Violations Preliminary Restoration status check inspection accompanied by ODNR Division staff member Jimmy Wiles found the area affected by the well pad construction restored according to ORC 1509.072 with erosion control in place and vegetation established. Addressing the 4 wells on location- The well drilling and completion process is now complete with casing and tubing well heads installed and a flow back company identified as Solid Oak on site flow testing the wells. A production facility is located on the West side of the well pad consisting of 8-400 barrel production tanks all located in a poly lined steel containment dike area.
513198076 2015-9-18 0:00: CS No Violations 2.00
69868036 2018-3-13 0:00: PW No Violations
847206154 2020-5-15 0:00: PW No Violations 1.20

For data sources see[10]

References