34-111-24619

Well Details

Well ID: 34-111-24619
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Malaga Township
Operator Name: ANTERO RESOURCES CORPORATION
Well Pad ID: US-OH-001440
Farm/Lease Name: CRESTONE UNIT
License Status: Producing
License Date: 2017-03-27
Spud Date: 2017-04-12
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2017-08-24
Well Total Depth: 23227.00 ft
Configuration: Horizontal
Latitude: 39.850000
Longitude: -81.190000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2015-10-21 Proposed Formations:POINT PLEASANT, Issued Date:10/21/2015, Expired Date:10/20/2017 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2015-12-03 Proposed Formations:POINT PLEASANT, Issued Date:12/3/2015, Expired Date:12/2/2017 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2017-03-27 Proposed Formations:POINT PLEASANT, Issued Date:3/27/2017, Expired Date:3/27/2019 12:00:00 PM, Drilling unit acres:972.137, Proposed Well Type:OG, Proposed Well Class:NWC
Reached Total Depth 2017-08-24 OP REQUEST 1 YEAR CONF ON ALL LOGS-ALE.
Correction to Well 2017-10-17 UPDATE TARGET/TAKE PER AS-DRILLED PLAT
Completion Report Received 2018-10-04 OP REQUEST 1 YEAR CONF ON ALL LOGS-ALE.
Record Last Modified 2018-11-21 OP REQUEST 1 YEAR CONF ON ALL LOGS-ALE.
Construction Permit Expires 2019-03-27 OP REQUEST 1 YEAR CONF ON ALL LOGS-ALE.

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2018-10-30 9128 9295 0
2018-10-30 23008 23106 0
23008 23106 0
9128 9295 0
9128 9295 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 06/29/2018 07/23/2018 9030 23,318,000.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Sand U.S. Well Services, LLC Proppant Crystalline Silica, quartz 14808-60-7 100 12.6906 28,361,100.0
HCL Acid (12.6%-17.5%) U.S. Well Services, LLC Bulk Acid Hydrogen Chloride 7647-01-0 17.5 0.030303 67720.8
Water 7732-18-5 87.4 0.130335 291275
WFRA-405 U.S. Well Services, LLC Friction Reducer 2-Propenoic acid, polymer with 2 propenamide 9003-06-9 30 0.022711 50755.6
Hydrated light distillate (petroleum) 64742-47-8 30 0.018283 40858.2
Water Antero Resources Carrier/Base Fluid Water 7732-18-5 100 87.0192 194,472,000.0
AP One U.S. Well Services, LLC Gel Breakers Ammonium Persulfate 7727-54-0 100 0.00141 3151
LGC-15 U.S. Well Services, LLC Gelling Agents Guar Gum 9000-30-0 50 0.036687 81988.5
Surfactant 68439-51-0 3 0.002201 4919.31
Suspending agent (solid) 14808-60-7 3 0.005611 12539.4
Petroleum Distillates 64742-47-8 60 0.034745 77648
Bioclear 2000 U.S. Well Services, LLC Anti-Bacterial Agent 2,2-dibromo-3-nitrilopropionamide 10222-01-2 20 0.004235 9464.34
Deionized Water 7732-18-5 28 0.002419 5405.99
SI-1200s U.S. Well Services, LLC Scale Inhibitor Proprietary Scale Inhibitor Proprietary 10 0.001204 2690.01
AI-303 U.S. Well Services, LLC Acid Corrosion Inhibitors Cinnamaldehyde 104-55-2 20 0.00001500 34.4942
Formic acid 64-18-6 20 0.00001500 33.36
Butyl cellosolve 111-76-2 20 0.00001300 30.0574
Acetophenone,thiourea,formaldehyde polymer 68527-49-1 5 0.00000400 8.34
Polyether 60828-78-6 10 0.00000700 16.68
Ethylene glycol 107-21-1 40 0.00004300 95.4096

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2018-07-23 H2O 15 6680 Bbl 426400 US Well Services Inc STAGE 71/71

STAGES 2-70 SEE IMAGES

2018-06-29 H2O 15 6264 Bbl 244200 US Well Services Inc STAGE 1/71

STAGES 2-70 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 ANTERO RESOURCES CORPORATION 2437590 65 141
2019 ANTERO RESOURCES CORPORATION 1042024 0 75

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 ANTERO RESOURCES CORPORATION Brine 29644 141
2019 ANTERO RESOURCES CORPORATION Brine 27113 75

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1249868971 2020-5-21 0:00: PW No Violations 1.00
-935254731 2018-8-27 0:00: CT No Violations 0.60
0935254731 2018-08-27 Completion Testing No Violations Status check inspection on the well completion process found Fortis Energy rig # 1069 on location and rigged up on the well drilling out the completion plugs using 10.4 pound per gallon brine to maintain well control. There is a snubbing unit owned by Great White Energy rigged up on the well control blow out preventer. 24 plugs have been drilled out and ROC Flow Back services is maintaining well control. Annular pressure is being monitored throughout the procedure. The rig and support equipment is situated on polymer containment with the well pad perimeter earthen berm serving as the primary containment.
1039973008 2018-05-02 Completion Testing No Violations Status check inspection found the well drilling process is now complete and crews from lighting energy are on site opening the toe sleeve valves and pressure testing the 5.5 diameter production casing string to 11,500 psi. The completion well head system is company identified as Downing and the well head consists of a manually operated lower master valve and the upper hydraulic master valve followed by a flow cross section. A support equipment is placed on polymer containment. Stimulation is slated begin in the next 14 days.
1332548893 2018-09-10 Completion Testing No Violations Status check inspection fount the well drill -stimulation-and post stimulation drill out process is now complete. Crews are on site installing all the production equipment. A tank battery has been erected consisting of 8 steel tanks capable of holding 400 barrels of fluid each. All tanks are situated inside a polymer lined steel containment dike area. 6 wells are present on the pad and all 6 are complete. Once the production equipment has been installed flow back operations will begin.
1411492596 2017-11-01 Preliminary Restoration No Violations Preliminary Restoration status check inspection found the well site meets ORC 1509.072 with vegetation established in the affected area of the well pad construction disturbance and erosion control in place. The well pad entrance is gated with signage in place. The lease road and well pad is of a stone surface. Addressing the wells on the pad, the drilling process is now complete and the 6 wells on the pad are awaiting stimulation with night caps on the well heads. Gauges are in place to monitor annular pressures. The tin horn cellars have been filled in with river gravel with fluid recovery tubes set inside the cellars. Also on the well pad is the tank battery consisting of 8 steel construction 400 barrel capacity tanks that are situated inside a polymer lined steel containment dike area. The well pad perimeter is constructed of an earthen berm with 3 catch basin fluid discharge points with the drain valves in the closed position. Contract workers from Hall Drilling are on site erecting the sales line and vapor recovery system burners.
1492089825 2017-04-13 Casing String Witnessed No Violations
1494163257 2017-05-05 Casing String Witnessed No Violations Onsite with Inspector Bill Stolarik to witness cementing of the surface casing. See his report this date for job details.
1501655586 2017-08-02 Casing String Witnessed No Violations On site inspection to witness the surface casing cement job with Paterson Drilling rig 342 on location along with Halliburton Cement Service. The rig has drilled a 17.5 diameter surface borehole to a measured depth of 1,212 measured off of a drilling rig Kelly Bushing heigth of 25. The rig then inserted 1,171 of 13.375 diameter J-
1531420603 2018-07-12 Completion Testing No Violations Status check inspection on the well completion process found US Well Service was on location with their pressure pumping equipment stimulating the well and Horizontal Wireline Service was providing wireline perforating and plug setting. 34 out of 71 stages have been completed. The company does have annular pressure monitoring in place and hooked to the well head during stimulation. Attached to the well head B section is the completion well control stack consisting of a manual master valve followed by a hydraulic master valve then a flow cross and a 3rd manual master valve atop the flow cross. The completion head attachment point for the fluid missile is atop the 3rd master valve. Present on location is 15 pressure pump truck and 3 pump down trucks. All completion support equipment is situated on polymer containment. The well pad perimeter earthen berm drain valves are in the closed position.
1568034297 2017-05-05 Casing String Witnessed No Violations Purpose of this inspection was to witness cementing of the surface casing. Accomapnied by Inspector Bill Stolarik, please see his report this date for job details.

For data sources see[10]