Well ID: 34-111-24621 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.85,"lon":-81.23,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Malaga Township | |
Operator Name: ANTERO RESOURCES CORPORATION | |
Well Pad ID: US-OH-001329 | |
Farm/Lease Name: LAYTON UNIT | |
License Status: Producing | |
License Date: 2015-10-23 | |
Spud Date: 2015-10-28 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2016-02-02 | |
Well Total Depth: 16680.00 ft | |
Configuration: Horizontal | |
Latitude: 39.850000 | |
Longitude: -81.230000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2015-10-23 | Proposed Formations:POINT PLEASANT, Issued Date:10/23/2015, Expired Date:10/22/2017 12:00:00 PM, Drilling unit acres:561.971, Proposed Well Type:OG, Proposed Well Class:NWC |
Reached Total Depth | 2016-02-02 | |
Correction to Well | 2016-04-22 | CHANGE IN TARGET/TAKEPOINT PER AS DRILLED PLAT-ALE |
Completion Report Received | 2016-09-23 | |
Construction Permit Expires | 2017-10-22 | |
Record Last Modified | 2018-07-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2016-09-26 | 8762 | 16585 | 0 |
8762 | 16585 | 0 | |
8762 | 16585 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 05/20/2016 | 05/30/2016 | 8570 | 11,843,700.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | K-BAC 1020 | U.S. Well Services | Anti-Bacterial Agent | 2,2-dibromo-3-nitrilopropionamide | 10222-01-2 | 20 | 0.00422 | 4693.33 |
Deionized Water | 7732-18-5 | 28 | 0.00241 | 2680.81 | ||||
Sand | U.S. Well Services, LLC | Proppant | Crystalline Silica, quartz | 14808-60-7 | 100 | 10.6984 | 11,904,700.0 | |
WFRA-405 | U.S. Well Services | Friction Reducer | Ethoxylated alcohol blend | 68002-97-1 | 4 | 0.00362 | 4027.89 | |
2-Propenoic acid, polymer with 2 propenamide | 9003-06-9 | 30 | 0.02715 | 30209.1 | ||||
Water | 7732-18-5 | 60 | 0.0543 | 60418.3 | ||||
Hydrated light distillate (petroleum) | 64742-47-8 | 30 | 0.02185 | 24318.4 | ||||
SI-1100s | U.S. Well Services | Scale Inhibitor | Copolymer of Maleic and Acrylic acid | 52255-49-9 | 10 | 0.00145 | 1617.89 | |
Water | 7732-18-5 | 80 | 0.00986 | 10968.8 | ||||
Hexamethylene tramine penta (methylene phosphonic acid) | 34690-00-1 | 5 | 0.0008 | 891.212 | ||||
Potassium salt of diethylene triamine
penta (methylene phosphonic acid) |
15827-60-8 | 7.5 | 0.00125 | 1388.23 | ||||
Hexamethylene diamine penta (methylene phosphonic acid) | 23605-74-5 | 2 | 0.00032 | 356.485 | ||||
Phosphino carboxylic acid polymer | 71050-62-9 | 5 | 0.0008 | 891.212 | ||||
LGC-15 | U.S. Well Services | Gelling Agents | Suspending agent (solid) | 14808-60-7 | 3 | 0.01133 | 12606.4 | |
Surfactant | 68439-51-0 | 3 | 0.00444 | 4945.6 | ||||
Petroleum Distillates | 64742-47-8 | 60 | 0.07015 | 78062.9 | ||||
Guar Gum | 9000-30-0 | 50 | 0.07407 | 82426.6 | ||||
AP One | U.S. Well Services | Gel Breakers | Ammonium Persulfate | 7727-54-0 | 100 | 0.00197 | 2195 | |
Water | Antero Resources | Base Fluid | Water | 7732-18-5 | 100 | 88.7676 | 98,776,400.0 | |
AI-302 | U.S. Well Services | Acid Corrosion Inhibitors | 2-Propyn-1-olcompound with methyloxirane | 38172-91-7 | 15 | 0.00007000 | 75.06 | |
Water | 7732-18-5 | 95 | 0.00043 | 475.38 | ||||
HCL Acid (12.6%-18.0%) | U.S. Well Services, LLC | Bulk Acid | Water | 7732-18-5 | 87.5 | 0.19654 | 218706 | |
Hydrogen Chloride | 7647-01-0 | 18 | 0.04695 | 52241.8 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2016-05-30 | H2O | 0 | 5727 Bbl | 264740 | US Well Services Inc | STAGE 45/45
60 SHOTS |
2016-05-20 | H2O | 0 | 6187 Bbl | 264980 | US Well Services Inc | STAGE 1/45
60 SHOTS |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | ANTERO RESOURCES CORPORATION | 1874835 | 366 | 153 |
2017 | ANTERO RESOURCES CORPORATION | 1911817 | 372 | 365 |
2018 | ANTERO RESOURCES CORPORATION | 731218 | 300 | 363 |
2019 | ANTERO RESOURCES CORPORATION | 135108 | 103 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | ANTERO RESOURCES CORPORATION | Brine | 18438 | 153 |
2017 | ANTERO RESOURCES CORPORATION | Brine | 11108 | 365 |
2018 | ANTERO RESOURCES CORPORATION | Brine | 4231 | 363 |
2019 | ANTERO RESOURCES CORPORATION | Brine | 707 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1422804649 | 2017-12-29 0:00 | DD | No Violations | |
-1779342949 | 2017-12-29 0:00 | PW | No Violations | 0.20 |
-2033876853 | 2019-1-24 0:00: | PW | No Violations | 0.20 |
-765423162 | 2017-6-27 0:00: | PW | No Violations | 0.20 |
0765423162 | 2017-06-27 | Production Wells | No Violations | Status check inspection found the well equipped with a production tree casing head and the production valve in the open position. Annular pressure monitoring gauges are present. At the production fluid storage facility a total of (8) steel tanks capable of holding 400 barrels of fluid each are present inside a polymer lined steel containment dike area. A total of 4 gas processing units are present on location one each for each existing well present on the pad. |
0792637248 | 2015-11-25 | Drill / Deepen / Reopen | No Violations | Status check inspection found Patterson drilling on location drilling the 17.5 surface borehole at a measured depth of 781 with a proposed total depth to be drilled of 1,301. The cement job will possibly fall on 11/26/15 and not be witnessed due to being on a Holiday. |
0880257482 | 2016-09-22 | Preliminary Restoration | No Violations | Preliminary Restoration status check inspection accompanying Inspector Bill Stolarik with the following being observed on this day. The affected area of the well site construction has been restored according to ORC 1509.072 with erosion control and vegetation being established, all ditch lines are rock lined and the well pad construction perimeter still has super silt fence and filter sock in place to be removed at a later date by the company. There is 4 wells on the well pad now in production with more well permitted and not complete as of the date of my inspection. Inspector Stolarik signed off on the restoration on his report for this day. |
1170526174 | 2016-09-22 | Preliminary Restoration | No Violations | Preliminary Restoration status check inspection accompanied on this day by ODNR Division Staff member Jimmy Wiles. Upon inspection of the well it was observed that the well drilling and completion process is now complete with a casing head and tubing production head installed. Warrior Energy service is on location with their flow back equipment monitoring the well flow back process. There is 4 wells now complete on the well pad and on line with 4 gas processing units in place. There is 8 -400 barrel capacity production tanks on location located inside a poly lined steel containment dike area. Addressing the restoration- The well site meets ORC 1509.072 with vegetation established and erosion control in place. The company also still has all perimeter filter sock and super silt fence in place at this time and will be removed at their discretion at a later date. |
1308764643 | 2016-05-09 | Completion Testing | No Violations | Status check inspection on the well bore completion process found US Well service rigging up to begin the stimulation process on the 4 existing wells on the pad. Allied Horizontal Wire Line Service is on location and has initiated a wire line bond log on each of the wells, also noted is the well bore toe key preparation work has been completed. All equipment on location is located on polymer containment and the well pad perimeter drainage valves are in the closed position and the company has a vacuum truck service identified as ECM recovering any product that may accumulate in the well pad sumps or on the location surface. Bass Well Head is the well head control company. The company Representative also indicated that they are conducting weekly gas alarm and emergency shut down drill for the location in case of a on site emergency during stimulation operations. |
1422804649 | 2017-12-29 | Drill / Deepen / Reopen | No Violations | Status check on site inspection and well drilling update. Initially the 4 Layton unit wells were spudded and conductor only was set. The company also set the mouse holes for the drilling operation. There is a steel plate set over the cellars and concrete barriers around the perimeter for safety purposes. No rig is present. |
1446137945 | 2015-10-29 | Casing String Witnessed | No Violations | The said well was spudded on 10/28/2015 by Express Energys top hole rig with a 85 x 32 conductor borehole being drilled and 85 of .375 wall 26 conductor being set. Permission was granted to set the conductor at 85 due to being in solid bedrock. Express Energys Cement service cemented the casing using 270 sacks of class A cement with the cement mix water verified chloride free and PH of 7 and circulation established prior to cementing with the cement displaced with 46.45 barrels of fresh water and good cement returns witnessed to surface. |
1467297070 | 2016-06-30 | Completion Testing | No Violations | Status check inspection on the well completion process finding a total of 4 well present on location with all 4 wells stimulated and Fortis Well Service rigged up on the Layton Unit # 2H , the well completion plugs have been drilled out and the well bore circulated clean to the total well bore depth of 16,680. The well was perforated between the depths of 8,762 and 16,585. Upon completion the company will set a total of 8,662 of 2.875 6.5lb/ft N-80 production tubing in the well bore. Bass Well Head is on location providing well head surface control during completion operations. Excell Company is on location providing Environmental support recovering and product created during the completion process and monitoring the site. Any wet tubing strings pulled from the well bore is displaced with fresh water prior to recovery. All support equipment is place on primary polymer containment and all chemicals are placed on 2 layers of containment. All well pad drains are in the closed position. |
1779342949 | 2017-12-29 | Production Wells | No Violations | Status check inspection found the well head equipped with a casing and tubing well head with both the casing and tubing well head production valves open and feeding into a production sales line that leads to a gas processing unit on location near the well head. Annular pressure monitoring gauges are present on the well head. There is a total of 4 completed wells on the location along with 4 gas processing units and 8 -400 barrel capacity steel construction production tanks. The well pad has a earthen berm perimeter and the well pad surface is of stone construction. The lease road is gravel construction and in good repair. Also 4 additional wells were spudded on the pad and the conductor casing only was set. |
2033876853 | 2019-01-24 | Production Wells | No Violations | On this day, I found the pad gated with signage at the entrance. There are (4) producing wells, (4) additional wells that have had only the conductor drilled and set, (4) gas processing units (GPU), (2) 400-barrel steel production tanks within polymer lined steel containment, and an Emergency Shutdown (ESD) button is present at the pad entrance. Additionally, concrete barriers surround the perimeter of the wellheads. Identification and annular pressure monitoring devices are present. The 9.625 inch diameter intermediate casing has a pressure of 460 pounds per square inch (psi), and the 13.375 inch diameter surface casing has a pressure of 200 psi. |
743108417 | 2020-4-24 0:00: | PW | No Violations | 1.50 |
792637248 | 2015-11-25 0:00 | DD | No Violations | 1.50 |
880257482 | 2016-9-22 0:00: | PL | No Violations | 0.50 |
For data sources see[10]