If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-111-24624 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.86,"lon":-81.17,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Malaga Township | |
Operator Name: ANTERO RESOURCES CORPORATION | |
Well Pad ID: US-OH-001411 | |
Farm/Lease Name: CADDIS UNIT | |
License Status: Producing | |
License Date: 2016-11-28 | |
Spud Date: 2016-12-09 | |
Spud Drilling Contractor: H&P DRILLING | |
Final Drill Date: 2017-03-10 | |
Well Total Depth: 19292.00 ft | |
Configuration: Horizontal | |
Latitude: 39.860000 | |
Longitude: -81.170000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2015-10-30 | Proposed Formations:POINT PLEASANT, Issued Date:10/30/2015, Expired Date:10/29/2017 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2016-11-28 | Proposed Formations:POINT PLEASANT, Issued Date:11/28/2016, Expired Date:11/28/2017 12:00:00 PM, Drilling unit acres:722.795, Proposed Well Type:OG, Proposed Well Class:EOUT |
Reached Total Depth | 2017-03-10 | 12 MONTHS CONFIDENTIALITY REQUEST ON ALL LOGS-05/19/17 ALE |
Correction to Well | 2017-09-08 | UPDATE TARGET/TAKE AS-DRILLED PLAT RCVD 7/18/17 ALE. |
Construction Permit Expires | 2017-11-28 | 12 MONTHS CONFIDENTIALITY REQUEST ON ALL LOGS-05/19/17 ALE |
Completion Report Received | 2018-01-02 | 12 MONTHS CONFIDENTIALITY REQUEST ON ALL LOGS-05/19/17 ALE |
Record Last Modified | 2018-01-12 | 12 MONTHS CONFIDENTIALITY REQUEST ON ALL LOGS-05/19/17 ALE |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2018-01-11 | 9418 | 9588 | 5 |
2018-01-11 | 18899 | 19069 | 5 |
18899 | 19069 | 5 | |
9418 | 9588 | 5 | |
9418 | 9588 | 5 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 07/06/2017 | 07/22/2017 | 9110 | 18,780,700.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | LGC-15 | U.S. Well Services, LLC | Gelling Agents | Surfactant | 68439-51-0 | 3 | 0.001806 | 3260.23 |
Suspending agent (solid) | 14808-60-7 | 3 | 0.004603 | 8310.39 | ||||
Guar Gum | 9000-30-0 | 50 | 0.030096 | 54337.2 | ||||
Petroleum Distillates | 64742-47-8 | 60 | 0.028503 | 51460.5 | ||||
HCL Acid (12.6%-17.5%) | U.S. Well Services, LLC | Bulk Acid | Hydrogen Chloride | 7647-01-0 | 17.5 | 0.026725 | 48251.1 | |
Water | 7732-18-5 | 87.4 | 0.114948 | 207533 | ||||
Water | Antero Resources | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 86.7545 | 156,631,000.0 | |
AI-303 | U.S. Well Services, LLC | Acid Corrosion Inhibitors | Formic acid | 64-18-6 | 20 | 0.00001600 | 28.356 | |
Ethylene glycol | 107-21-1 | 40 | 0.00004500 | 81.0982 | ||||
Butyl cellosolve | 111-76-2 | 20 | 0.00001400 | 25.5488 | ||||
Acetophenone,thiourea,formaldehyde polymer | 68527-49-1 | 5 | 0.00000400 | 7.089 | ||||
Cinnamaldehyde | 104-55-2 | 20 | 0.00001600 | 29.3201 | ||||
Polyether | 60828-78-6 | 10 | 0.00000800 | 14.178 | ||||
Bioclear 2000 | U.S. Well Services, LLC | Anti-Bacterial Agent | 2,2-dibromo-3-nitrilopropionamide | 10222-01-2 | 20 | 0.003881 | 7007.29 | |
Deionized Water | 7732-18-5 | 28 | 0.002217 | 4002.53 | ||||
SI-1200s | U.S. Well Services, LLC | Scale Inhibitor | Ammonia | 7664-41-7 | 0.5 | 0.00009600 | 174.049 | |
Alkyl Phosphonic Acid | Proprietary | 5 | 0.00063 | 1137.58 | ||||
Sand | U.S. Well Services, LLC | Proppant | Crystalline Silica, quartz | 14808-60-7 | 100 | 12.9799 | 23,434,600.0 | |
AP One | U.S. Well Services, LLC | Gel Breakers | Ammonium Persulfate | 7727-54-0 | 100 | 0.001237 | 2234 | |
WFRA-405 | U.S. Well Services, LLC | Friction Reducer | Hydrated light distillate (petroleum) | 64742-47-8 | 30 | 0.022668 | 40926.7 | |
2-Propenoic acid, polymer with 2 propenamide | 9003-06-9 | 30 | 0.028159 | 50840.6 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2017-07-06 | H2O | 15 | 304878 Gal | 503660 | US Well Services Inc | STAGE 1/48
STAGES 2-47 SEE IMAGES |
2017-07-23 | H2O | 15 | 298956 Gal | 503345 | US Well Services Inc | STAGE 48/48
STAGES 2-47 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | ANTERO RESOURCES CORPORATION | 207546 | 0 | 61 |
2018 | ANTERO RESOURCES CORPORATION | 4844402 | 0 | 337 |
2019 | ANTERO RESOURCES CORPORATION | 512713 | 0 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | ANTERO RESOURCES CORPORATION | Brine | 3805 | 61 |
2018 | ANTERO RESOURCES CORPORATION | Brine | 76464 | 337 |
2019 | ANTERO RESOURCES CORPORATION | Brine | 7939 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1793133486 | 2017-3-9 0:00:0 | DD | No Violations | 1.30 |
-1918064229 | 2017-11-1 0:00: | PW | No Violations | 0.50 |
-2129160416 | 2020-2-7 0:00:0 | PW | No Violations | 1.20 |
-995214511 | 2016-12-9 0:00: | CS | No Violations | 3.00 |
0288074381 | 2017-01-02 | Drill / Deepen / Reopen | No Violations | Administrative report to document the 12.275 surface casing cement job conducted on 01/02/2017. H&P rig 519 is on the hole and drilled a 17.5 borehole to 1,273. The rig then inserted 1,263 of 13.375 diameter 54.5 pound per foot J-55 grade buttress thread casing. The casing was cemented by Schlumberger cement service. The drilling rig manager was in contact with me prior to cementing. The job was not witnessed due to the Holiday. |
0486283183 | 2016-12-21 | Drill / Deepen / Reopen | No Violations | Status check inspection found H&P drilling rig 519 rigging up on location. The rig is being moved up from Texas and is not estimated to spud for 7 days. |
0541869786 | 2017-09-28 | Completion Testing | No Violations | |
0995214511 | 2016-12-09 | Casing String Witnessed | No Violations | On site inspection to witness the conductor casing cement job with Express Energys drilling rig and cement services. A 32 diameter borehole has been drilled to 135 and 26 diameter casing ran to 135. The casing was cemented using 435 sacks of class A cement and displaced with 77 barrels of fresh water and cement returns witnessed to surface. |
1081536970 | 2017-06-06 | Preliminary Restoration | No Violations | Preliminary Restoration status check inspection found the affected area depicted in the pre construction drawings has vegetation established and erosion control in place meeting ORC 1509.072. Signage is posted at the well pad entrance. Crews are on site erecting a polymer lined steel containment tank battery dike area. Baker Hughes pressure pumping service is on location and has assisted in the well bore toe prep operations. US Well service is slated to mobilize in the next 48 hours onto location to begin the well stimulation operation with a 6 existing wells on location slated to be stimulated. The well head assembly consists of a Cactus well head completion stack made up of a single Hydraulic Master Valve and Manual Master Valve sitting on top of the B-Section 10,000 psi rated lower well head assembly. |
1347533909 | 2018-05-14 | Production Wells | No Violations | Status check inspection found a total of 6 wells on the pad all in operation and producing. There is emergency shut down devices on both the tubing and well head production outlet flow lines with manual valves also present. Annular pressure monitoring gauges are present on the 13.375 and 9.625 well head sections with flow lines attached to each annular port leading to on site vapor recovery system. The wells are still flowing through sand trap separators before the product enters the gas processing units. Also on site is a 3rd party gas processing and distribution system. |
1483542584 | 2017-01-04 | Drill / Deepen / Reopen | No Violations | Status check inspection on the well drilling process found H&P Drilling rig 521 on location with the 13.375 surface casing recently set and the rig has installed and tested the blow out preventer. The rig is currently picking up the 12.250 drilling assembly and preparing to begin drilling the 1st intermediate well bore. |
1484069958 | 2017-01-10 | Drill / Deepen / Reopen | No Violations | |
1703678545 | 2017-01-17 | Drill / Deepen / Reopen | No Violations | Status check inspection on the well drilling process found H&P Drilling rig # 519 on location and the 9.625 diameter casing recently set at 8,565. The rig is skidding to the Caddis Unit # 2H to begin drilling the surface borehole. |
1793133486 | 2017-03-09 | Drill / Deepen / Reopen | No Violations | |
1918064229 | 2017-11-01 | Production Wells | No Violations | Status check inspection found the well drilling and completion process finished with the well equipped with a production tree and the production valve open. The tin horn cellars and mouse holes have been filled in. There is a total of 6 complete active wells on the pad all in production. There is also a total of 8 production tanks all of 400 barrel capacity each. There is 2 vapor recovery burner units attached to the tank battery and 6 gas processing units on location also. The location signage is present at the entry point and there is also a gate across the lease road. The well pad location and lease road is of stone construction and in good repair. The well pad has a total of 6 outlet drain catch basins that are in the closed position. |
288074381 | 2017-1-2 0:00:0 | DD | No Violations | |
486283183 | 2016-12-21 0:00 | DD | No Violations | 1.00 |
541869786 | 2017-9-28 0:00: | CT | No Violations | 0.80 |
For data sources see[10]