If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-111-24654 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.7,"lon":-81.18,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Wayne Township | |
Operator Name: GULFPORT APPALACHIA LLC | |
Well Pad ID: US-OH-001066 | |
Farm/Lease Name: ROGER 210596 | |
License Status: Producing | |
License Date: 2016-03-10 | |
Spud Date: 2016-03-18 | |
Spud Drilling Contractor: NOMAC DRILLING CORP | |
Final Drill Date: 2016-06-30 | |
Well Total Depth: 18235.00 ft | |
Configuration: Horizontal | |
Latitude: 39.700000 | |
Longitude: -81.180000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2016-03-10 | Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:3/10/2016, Expired Date:3/10/2018 12:00:00 PM, Drilling unit acres:606.534, Proposed Well Type:OG, Proposed Well Class:EOUT |
Reached Total Depth | 2016-06-30 | PR STATUS BASED ON 2Q PRODUCTION REPORTED...SO |
Correction to Well | 2017-03-24 | UPDATE TARGET/TAKEPOINT PER AS DRILLED PLAT-RC |
Correction to Well | 2017-12-29 | UPDATE TAKE POINT PER FINAL AS-DRILLED PLAT |
Construction Permit Expires | 2018-03-10 | PR STATUS BASED ON 2Q PRODUCTION REPORTED...SO |
Record Last Modified | 2018-04-06 | PR STATUS BASED ON 2Q PRODUCTION REPORTED...SO |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2017-11-20 | 9773 | 9918 | 50 |
2017-11-20 | 17921 | 18074 | 40 |
17921 | 18074 | 40 | |
9773 | 9918 | 50 | |
9773 | 9918 | 50 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 01/08/2017 | 01/26/2017 | 9175 | 11,121,300.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Sand (40/70 White Proppant) | Taylor Frac | Proppant | Silica Substrate | 14808-60-7 | 100 | 10.9046 | 11,529,000.0 |
FRA-409 | Lubrizol | Friction Reducer | Water | 7732-18-5 | 70 | 0.0537442 | 56821.4 | |
Distillates, Petroleum, Hydrotreated Light | 64742-47-8 | 30 | 0.0230332 | 24352 | ||||
SI-20W | Stingray Pressure Pumping, LLC | Scale Inhibitor | Water | 7732-18-5 | 55 | 0.00895629 | 9469.11 | |
Phosphinocarboxylic Acid | 110224-99-2 | 45 | 0.00732788 | 7747.46 | ||||
Bio B2512 | Lubrizol | Biocide | Water | 7732-18-5 | 90 | 0.0319167 | 33744.2 | |
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 10 | 0.0035463 | 3749.35 | ||||
Water | Gulfport Energy | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 87.7815 | 92,807,600.0 | |
Hydrochloric Acid (28%) | Oxy | Acidizing | Water | 7732-18-5 | 64 | 0.126569 | 133817 | |
Hydrochloric Acid (Hydrogen Chloride) | 7732-18-5 | 36 | 0.0711953 | 75271.8 | ||||
NEFE-180 | Chemplex | Corrosion Inhibitor/Iron Control | Fatty acids, tall oil | 61790-12-3 | 5 | 0.00006134 | 64.853 | |
2-Ethylhexanol | 104-76-7 | 10 | 0.000122682 | 129.706 | ||||
2-Propyn-1-ol | 107-19-7 | 5 | 0.00006134 | 64.853 | ||||
Alcohols, C14-15, ethoxylated | 68951-67-7 | 5 | 0.00006134 | 64.853 | ||||
Acetic acid | 64-19-7 | 65 | 0.000797432 | 843.091 | ||||
Coconut oil acid diethanolamine | 68603-42-9 | 5 | 0.00006134 | 64.853 | ||||
Methanol | 67-56-1 | 35 | 0.000429386 | 453.972 | ||||
Olefin | Proprietary | 5 | 0.00006134 | 64.853 | ||||
Sand (100 Mesh Proppant) | Taylor Frac | Proppant | Silica Substrate | 14808-60-7 | 100 | 0.986439 | 1,042,920.0 | |
Other Chemical(s) | Listed Above | See Trade Name(s) List | Water | 7732-18-5 | 64 | 0.126569 | 133817 | |
Alcohols, C14-15, ethoxylated | 68951-67-7 | 5 | 0.00006134 | 64.853 | ||||
Water | 7732-18-5 | 70 | 0.0537442 | 56821.4 | ||||
Methanol | 67-56-1 | 35 | 0.000429386 | 453.972 | ||||
Fatty acids, tall oil | 61790-12-3 | 5 | 0.00006134 | 64.853 | ||||
Olefin | Proprietary | 5 | 0.00006134 | 64.853 | ||||
Water | 7732-18-5 | 90 | 0.0319167 | 33744.2 | ||||
2-Ethylhexanol | 104-76-7 | 10 | 0.000122682 | 129.706 | ||||
2-Propyn-1-ol | 107-19-7 | 5 | 0.00006134 | 64.853 | ||||
Water | 7732-18-5 | 55 | 0.00895629 | 9469.11 | ||||
Coconut oil acid diethanolamine | 68603-42-9 | 5 | 0.00006134 | 64.853 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2017-01-08 | H2O | 15 | 260106 Gal | 275080 | STINGRAY PRESSURE PUMPING LLC | STAGE 1/46
STAGES 2-45 SEE IMAGES |
2017-01-25 | H2O | 15 | 268926 Gal | 275320 | STINGRAY PRESSURE PUMPING LLC | STAGE 46/46
STAGES 2-45 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | GULFPORT ENERGY CORPORATION | 2627463 | 0 | 266 |
2018 | GULFPORT ENERGY CORPORATION | 1247183 | 0 | 364 |
2019 | GULFPORT ENERGY CORPORATION | 200546 | 0 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | GULFPORT ENERGY CORPORATION | Brine | 54015 | 266 |
2018 | GULFPORT ENERGY CORPORATION | Brine | 18778 | 364 |
2019 | GULFPORT ENERGY CORPORATION | Brine | 3335 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1972106698 | 2016-6-23 0:00: | DD | No Violations | 2.00 |
-2038220295 | 2016-11-7 0:00: | PL | No Violations | 0.50 |
-588528864 | 2018-3-15 0:00: | PW | No Violations | 0.20 |
-691385743 | 2016-6-16 0:00: | CS | No Violations | 1.50 |
0588528864 | 2018-03-15 | Production Wells | No Violations | On this day, I found the well equipped with annular pressure monitoring devices. The pressure gauges are labeled with surface pressure reading 0 pounds per square inch, and the intermediate gauge reading 1,400 pounds per square inch. There are (6) total wellheads, all in production, with concrete barriers surrounding them, and an electronic shutdown button at each wellhead. The facility is gated with proper signage, and an electronic shutdown button on the left-side, prior to the pad. The back right-side of the pad is equipped with (4) 400 barrel steel tanks and (1) 50 barrel steel tank all within containment, and an electronic shutdown button is present. There are (6) gas processing units along the right-side of the pad with electronic shutdown buttons on each, and a midstream facility on the right, at the entrance. |
0691385743 | 2016-06-16 | Casing String Witnessed | No Violations | Status check inspection on the well driling process found the 12.250 intermediate well bore has been drilled to a measured depth of 8,535.06. The company will load the hole with recycled water and circulate bottoms up and then pull the drill string up approximately 1,000 before returning the string to bottom and conditioning the hole further before pulling the drill string in preparation of running the 9.625 intermediate casing string. |
1445408905 | 2017-06-27 | Preliminary Restoration | No Violations | Preliminary Restoration status check inspection found the area affected by the well site construction has vegetation established and erosion control in place and is in compliance with ORC 1509.072. Addressing the well site. There is 6 producing wells on the pad all in line and selling product with tubing well heads installed on each well and the production valves in the open position. The wells are selling into gas processing units (GPU) with (6) units present. Also on the well site is the production fluid storage facility consisting of (4) steel production tanks all located inside a polymer lined steel containment dike area. The company has installed electrically controlled emergency shut down devices at each well head and also at the production facility and the well pad entrance. Located along the well site entrance lease road is a mid stream operation owned by Rice Energy in which all the wells on the pad sell into. Signage is posted at the well pad entrance and at each well head. |
1458318145 | 2016-03-18 | Casing String Witnessed | No Violations | The said well was spudded on 03/18/2016 with a 110 x 36 conductor borehole being drilled by Butches Rat Hole Service, with 110 of 26 .375 wall-weld connection conductor pipe being set and cemented by Stingray Cement Service using 490 sacks of Class A cement with 2% calcium and .125 lb/sk lcm additives. Circulation was established prior to cementing and maintained throughout the job with cement displaced with 62 barrels of fresh water and cement returns witnessed to surface. |
1465629302 | 2016-06-11 | Casing String Witnessed | No Violations | On site inspection to witness the 13.375 surface casing running and cement job. Upon inspection it was observed that Nomac Drilling rig 83 is on location and has drilled a 17.5 diameter surface borehole on air to a measured depth of 1,365. Upon attempting to run the 13.375 54.5lb/ft J-55 casing the rig was unable to get the last casing joint to bottom and set the casing at 1,325. Stingray Cement Service was on location to cement the casing with circulation established to surface prior to cementing and the casing cemented with 1,200 sacks of Class H-15.6 lb/gl 1.21 yield cement with 25 barrels of 6% gel spacer ran ahead of the cement and circulation maintained throughout the cement job with the casing pressure tested to 500 psi over cement displacement pressure upon the landing of the cement plug. Cement returns were witnessed to surface. |
1592635164 | 2020-4-15 0:00: | PW | No Violations | 0.30 |
1972106698 | 2016-06-23 | Drill / Deepen / Reopen | No Violations | |
1978682397 | 2017-03-06 | Preliminary Restoration | No Violations | Preliminary Restoration status check inspection accompanied by ODNR Inspector Austin Gutridge. The area affected by the well pad construction meets ORC 1509.072 with vegetation established and erosion control in place. The lease road is stoned and in good repair. Signage is posted at the well pad entrance. Hybrid Services completion rig # 102 is on location drilling out the completion plugs on the Roger # 4-A well. The rig is situated on polymer containment with the well pad perimeter earthen berm serving as the primary containment with the pad drain valves closed. There is 6 total wells on the pad that have been drilled and stimulated that will now be completed and the initial flow back operations commenced. |
2038220295 | 2016-11-07 | Preliminary Restoration | No Violations | Preliminary Restoration status check inspection found the well site meets ORC 1509.072. The well has been drilled and is awaiting completion. |
2056502973 | 2016-06-27 | Drill / Deepen / Reopen | No Violations |
For data sources see[10]