If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-111-24663 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.76,"lon":-80.91,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Salem Township | |
Operator Name: EQUINOR USA ONSHORE PROPERTIES | |
Well Pad ID: US-OH-001388 | |
Farm/Lease Name: PIRL SOUTH | |
License Status: Producing | |
License Date: 2016-07-08 | |
Spud Date: 2016-12-28 | |
Spud Drilling Contractor: ORION DRILLING | |
Final Drill Date: 2017-05-12 | |
Well Total Depth: 20660.00 ft | |
Configuration: Horizontal | |
Latitude: 39.760000 | |
Longitude: -80.910000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2016-07-08 | Proposed Formations:POINT PLEASANT, Issued Date:7/8/2016, Expired Date:7/8/2018 12:00:00 PM, Drilling unit acres:466.2, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2017-05-12 | |
Correction to Well | 2017-07-21 | UPDATE TARGET/TAKE PER AS-DRILLED PLAT RCVD 7-12-17 ALE. |
Completion Report Received | 2018-01-24 | |
Construction Permit Expires | 2018-07-08 | |
Change of Owner | 2018-08-08 | Operator changed from 9065, STATOIL USA ONSHORE PROPERTIES INC to 10187, EQUINOR USA ONSHORE PROPERTIES INC. |
Record Last Modified | 2018-08-08 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2018-02-05 | 10590 | 10710 | 45 |
2018-02-05 | 20350 | 20510 | 45 |
20350 | 20510 | 45 | |
10590 | 10710 | 45 | |
10590 | 10710 | 45 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 10/19/2017 | 10/19/2017 | 10618 | 17,347,600.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | MC B-8614 | Halliburton | Biocide | Listed Below | Listed Below | 0 | 0 | 0 |
FDP-S1176-15 | Halliburton | Friction Reducer | Listed Below | Listed Below | 0 | 0 | 0 | |
SAND-PREMIUM WHITE-40/70, BULK | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
Ingredients | Listed Above | Listed Above | Water | 7732-18-5 | 100 | 0.685619 | 1,148,390.0 | |
FE-1A ACIDIZING COMPOSITION | Halliburton | Additive | Listed Below | Listed Below | 0 | 0 | 0 | |
Sodium chloride | 7647-14-5 | 5 | 0.00626968 | 10502 | ||||
Methanol | 67-56-1 | 60 | 0.000444447 | 745 | ||||
Modified thiourea polymer | Proprietary | 30 | 0.000207042 | 347 | ||||
Ammonium chloride | 12125-02-9 | 5 | 0.00626968 | 10502 | ||||
Hydrochloric acid | 7647-01-0 | 15 | 0.0879915 | 147383 | ||||
Quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl chlorides |
68424-85-1 | 5 | 0.00108438 | 1817 | ||||
Ethanol | 64-17-5 | 1 | 0.000216875 | 364 | ||||
Propargyl alcohol | 107-19-7 | 10 | 0.00006901 | 116 | ||||
Castor oil, ethoxylated | 61791-12-6 | 5 | 0.00626968 | 10502 | ||||
Polyacrylate | Proprietary | 30 | 0.0376181 | 63009 | ||||
Phosphoric acid | 7664-38-2 | 0.1 | 0.00002169 | 37 | ||||
Crystalline silica, quartz | 14808-60-7 | 100 | 12.974 | 21,731,000.0 | ||||
Hydrotreated light petroleum distillate | 64742-47-8 | 30 | 0.0376181 | 63009 | ||||
Olefins | Proprietary | 5 | 0.00008282 | 140 | ||||
Acetic acid | 64-19-7 | 60 | 0.00500701 | 8387 | ||||
9-Octadecenamide, n,n-bis-2(hydroxy-ethyl)-,(Z) | 93-83-4 | 5 | 0.00626968 | 10502 | ||||
Fatty acids, tall oil | Proprietary | 30 | 0.000207042 | 347 | ||||
Glutaraldehyde | 111-30-8 | 30 | 0.00650625 | 10898 | ||||
Sobitan, mono-9-octadececenoate, (Z) | 1338-43-8 | 5 | 0.00626968 | 10502 | ||||
Citric acid | 77-92-9 | 60 | 0.00577259 | 9669 | ||||
Acetic anhydride | 108-24-7 | 100 | 0.00834502 | 13978 | ||||
Ethoxylated alcohols | Proprietary | 30 | 0.000207042 | 347 | ||||
Fresh Water | Operator | Base Fluid | Water | 7732-18-5 | 100 | 86.2737 | 144,505,000.0 | |
HYDROCHLORIC ACID | Halliburton | Solvent | Listed Below | Listed Below | 0 | 0 | 0 | |
FE-2A | Halliburton | Additive | Listed Below | Listed Below | 0 | 0 | 0 | |
HAI-OS ACID INHIBITOR | Halliburton | Corrosion Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2017-10-13 | H2O | 15 | 336863 Gal | 448114 | Halliburton | STAGE 50/50
STAGES 2-49 SEE IMAGES |
2017-09-06 | H2O | 15 | 468751 Gal | 442508 | Halliburton | STAGE 1/50
STAGES 2-49 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | EQUINOR USA ONSHORE PROPERTIES | 4965926 | 0 | 350 |
2019 | EQUINOR USA ONSHORE PROPERTIES | 558272 | 0 | 88 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | EQUINOR USA ONSHORE PROPERTIES | Brine | 53330 | 350 |
2019 | EQUINOR USA ONSHORE PROPERTIES | Brine | 5850 | 88 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1490903283 | 2019-10-17 0:00 | PL | No Violations | 0.50 |
0571325965 | 2017-09-20 | Completion Testing | No Violations | |
1483136117 | 2016-12-30 | Casing String Witnessed | No Violations | On site inspection to witness the surface casing cement job at 13:30 Hours. Well Service Group rig # 1 is on location and has drilled a 26 diameter surface borehole on air with a hammer bit to a measured depth of 546 and ran 516 of 94 pound per foot 20 buttress thread casing with a double valve Halliburton float shoe casing equipment and bow string centralizers on every collar. The drill string was stung into the float shoe and upon attempting to begin circulation the Halliburton Cement Service operator indicated he was unsuccessful in being able to circulate out the bottom of the casing shoe with pressure increasing to 500 psi. The rig pulled the drill string and attempted to pull the casing off bottom unsuccessfully, they company then attempted to load the casing and work the drill string while pressuring up on the casing string. The drilling rig blew a hydraulic line at 15:15 hours while attempting to pull the casing string. I left location at 18:00 hours and directed the company man to notify me once they resumed operations. The job was pumped on the morning of 12/31/2016 after the company pulled the casing string and found the shoe track plugged up. |
1490110543 | 2017-03-21 | Drill / Deepen / Reopen | No Violations | |
2138897288 | 2018-05-22 | Production Wells | No Violations | On site inspection found the well drilling and completion process now complete and well in production. The well is selling off the 5.5 diameter production casing through a primary 7.187 master valve with 2 additional in line manual and 2 hydraulic shut down valves in the production flow line. The company has annular pressure monitoring in place with riser pipes and gauges on the 13.375 and 9.625 well head sections. The 13.375 casing well head section gauge showed 100 pounds per square inch (psi) and the 9.625 well head section had 0 psi. Also on site is a total of 3 gas processing units one for each well on the pad along with a production facility consisting of 2 steel construction 400 barrel production tanks situated inside a polymer lined steel containment area. With the wells in the initial flow back stages he company has an additional 8 steel 500 barrel tanks that are being used to capture the flow back fluid from the wells, the 3 wells in production is generating approximately 800 barrels of fluid total each day. The preliminary restoration is also due- no earthen slips or deficiencies was observed on this day, vegetation is present throughout the disturbed area depicted on the initial construction design. The lease road is in good repair and consists of a gravel surface. The well pad entry point is gated with signage present. I will follow back up on the restoration later in the year and re confirm proper vegetation is still present. I also called the company and asked them to address the mouse holes used in the drilling process that have not been plugged. |
571325965 | 2017-9-20 0:00: | CT | No Violations | 0.70 |
For data sources see[10]