Well Details

Well ID: 34-111-24678
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Center Township
Operator Name: GULFPORT APPALACHIA LLC
Well Pad ID: US-OH-001405
Farm/Lease Name: POTTER 210631
License Status: Producing
License Date: 2016-09-27
Spud Date: 2016-10-05
Spud Drilling Contractor: PIONEER DRILLING
Final Drill Date: 2016-12-20
Well Total Depth: 18395.00 ft
Configuration: Horizontal
Latitude: 39.740000
Longitude: -81.070000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2016-09-27 Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:9/27/2016, Expired Date:9/27/2018 12:00:00 PM, Drilling unit acres:368.743, Proposed Well Type:OG, Proposed Well Class:NWC
Reached Total Depth 2016-12-20
Correction to Well 2018-08-31 TAKE TARGET AS-DRILLED
Construction Permit Expires 2018-09-27
Record Last Modified 2019-06-11

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
18089 18241 0
11237 11427 0
11237 11427 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 01/22/2019 02/10/2019 9668 12,781,000.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Ingredients Listed Above Listed Above Water 7732-18-5 100 0.112014 270844
EXCELERATE PS-2 Halliburton Friction Reducer Listed Below Listed Below 0 0 0
MC B-8614 Halliburton Biocide Listed Below Listed Below 0 0 0
FDP-S1296-17 Halliburton Additive Listed Below Listed Below 0 0 0
SCALECHEK LP-70 Halliburton Scale Inhibitor Listed Below Listed Below 0 0 0
Fresh Water Operator Base Fluid Water 7732-18-5 100 44.0317 106,465,000.0
SAND-PREMIUM WHITE-40/70, BULK Halliburton Proppant Listed Below Listed Below 0 0 0
HYDROCHLORIC ACID Halliburton Solvent Listed Below Listed Below 0 0 0
Ethoxylated alcohols Proprietary 5 0.00000607 15
Glutaraldehyde 111-30-8 30 0.00457804 11070
Telmer Proprietary 10 0.000738448 1786
Methanol 67-56-1 100 0.000142774 346
Propargyl alcohol 107-19-7 5 0.00000607 15
Modified thiourea polymer Proprietary 30 0.00003642 89
Hydrochloric acid 7647-01-0 15 0.010345 25015
Crystalline silica, quartz 14808-60-7 100 55.8333 135,001,000.0
Sodium polyacrylate 9003-04-7 1 0.00007384 179
Inorganic salt Proprietary 30 0.0129739 31370
Hydroteated light petroleum distillate 64742-47-8 30 0.0129739 31370
Ethylene glycol 107-21-1 60 0.00443069 10714
Acrylic acid 79-10-7 0.01 0.00000074 2
Quaternary ammonium compounds,

benzyl-C12-16-alkyldimethyl chlorides

68424-85-1 5 0.000763007 1845
Ethanol 64-17-5 1 0.000152601 369
Acrylamide acrylate polymer Proprietary 30 0.0129739 31370
Phosphoric acid 7664-38-2 0.1 0.00001526 37
SAND-COMMON WHITE-100 MESH, SSA-2, BULK (100003676) Halliburton Proppant Listed Below Listed Below 0 0 0

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2019 GULFPORT ENERGY CORPORATION 26378 0 4

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2019 GULFPORT ENERGY CORPORATION Brine 1035 4

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1429896177 2019-10-22 0:00 PL No Violations 0.30
-1462567506 2019-2-13 0:00: CT No Violations 0.10
-1522628944 2018-7-30 0:00: CT No Violations 0.20
0116398680 2018-07-30 Preliminary Restoration No Violations Preliminary Restoration status check inspection found vegetation established in the area affected by the well pad construction. There has been disturbance around the well pad where pipe lines have been installed that will require the vegetation to be established in those areas before the restoration can be signed off. The lease road and well pad surface does have a final grade of gravel present. Addressing the wells present on the pad. A total of 6 wells are present and to date only the drilling process has been completed on all 6 wells. The well are equipped with a lower A section and upper B section with a base plate and 2 master valves on top of the B section to allow access to the inside of the 5.5 diameter production casing. 2 diameter riser pipes are present on both the A & B well head sections with gauges present to monitor annular pressure. The pressure between the 5.5 diameter production casing and 9.625 is 600 pounds per square inch (PSI) and the pressure between the 13.375 and 9.625 is zero psi. Other than the midstream valve station no production equipment has been installed on the well pad.
116398680 2018-7-30 0:00: PL No Violations 0.20
1462567506 2019-02-13 Completion Testing No Violations On this day, I found the stimulation process has been completed and the wells are being prepared for drill-out, which is projected to commence on 2/25/19. I spoke with Gulfport Company Representative Aaron Nero onsite, and he stated that 5 of 6 wells were stimulated. Permit number 4676 (5A) was not hydraulically fractured during the stimulation process of the additional wells on the pad.
1480933978 2016-12-05 Casing String Witnessed No Violations -On site inspection to witness the surface casing cement job found Pioneer Drilling rig # 73 on location with a 17.5 surface borehole drilled to a depth of 1,306 and 1,302 of 13.375 54.5lb/ft J-55 casing ran. O-Tex Cement Service cemented the casing with the rig establishing circulation and the cemetn crews pumping 50 barrels of 6% gel spacer and 248 barrels or (1150 sacks) of class H cement with a cement weight of 15.6# & 1.21 yeild per gallon, the cement was displaced using 195.8 barrels of fluid with the casing being pressure tested to 500 psi over cement displacement pressure and cement returns witnessed to surface.
1522628944 2018-07-30 Completion Testing No Violations On this day, I accompanied ODNR Inspector William Stolarik. Please reference his comments for a detailed report. The drilling process has completed and the wellhead has been plumbed. No flowlines or production equipment are onsite. The wellhead has annular pressure monitoring devices attached. The well is awaiting completion.
218886434 2020-5-27 0:00: PW No Violations 1.00

For data sources see[9]