If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-111-24681 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.74,"lon":-81.07,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Monroe | |
| Municipality: Center Township | |
| Operator Name: GULFPORT APPALACHIA LLC | |
| Well Pad ID: US-OH-001405 | |
| Farm/Lease Name: POTTER 211254 | |
| License Status: Producing | |
| License Date: 2016-09-27 | |
| Spud Date: 2016-10-06 | |
| Spud Drilling Contractor: PIONEER DRILLING | |
| Final Drill Date: 2016-12-01 | |
| Well Total Depth: 18428.00 ft | |
| Configuration: Horizontal | |
| Latitude: 39.740000 | |
| Longitude: -81.070000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2016-09-27 | Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:9/27/2016, Expired Date:9/27/2018 12:00:00 PM, Drilling unit acres:396.619, Proposed Well Type:OG, Proposed Well Class:NWC |
| Reached Total Depth | 2016-12-01 | |
| Construction Permit Expires | 2018-09-27 | |
| Record Last Modified | 2019-06-11 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 18123 | 18279 | 0 | |
| 10149 | 10338 | 0 | |
| 10149 | 10338 | 0 |
For data sources see[3]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 01/27/2019 | 02/10/2019 | 9692 | 9,990,320.0 | 0 |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | HYDROCHLORIC ACID | Halliburton | Solvent | Listed Below | Listed Below | 0 | 0 | 0 |
| SCALECHEK LP-70 | Halliburton | Scale Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 | |
| FDP-S1296-17 | Halliburton | Corrosion Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 | |
| SAND-COMMON WHITE-100 MESH, SSA-2, BULK (100003676) | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
| Ingredients | Listed Above | Listed Above | Water | 7732-18-5 | 100 | 0.255765 | 242623 | |
| MC B-8614 | Halliburton | Biocide | Listed Below | Listed Below | 0 | 0 | 0 | |
| Inorganic salt | Proprietary | 30 | 0.0239834 | 22751 | ||||
| Modified thiourea polymer | Proprietary | 30 | 0.00009057 | 86 | ||||
| Propargyl alcohol | 107-19-7 | 5 | 0.00001510 | 15 | ||||
| Methanol | 67-56-1 | 100 | 0.00034565 | 329 | ||||
| Acrylic acid | 79-10-7 | 0.01 | 0.00000157 | 2 | ||||
| Ethoxylated alcohols | Proprietary | 5 | 0.00001510 | 15 | ||||
| Ethanol | 64-17-5 | 1 | 0.000312398 | 297 | ||||
| Ethylene glycol | 107-21-1 | 60 | 0.00939466 | 8912 | ||||
| Acrylamide acrylate polymer | Proprietary | 30 | 0.0239834 | 22751 | ||||
| Crystalline silica, quartz | 14808-60-7 | 100 | 11.9729 | 11,357,700.0 | ||||
| Hydrotreated light petroleum distillate | 64742-47-8 | 30 | 0.0239834 | 22751 | ||||
| Phosphoric acid | 7664-38-2 | 0.1 | 0.00003124 | 30 | ||||
| Sodium polyacrylate | 9003-04-7 | 1 | 0.000156578 | 149 | ||||
| Glutaraldehyde | 111-30-8 | 30 | 0.00937194 | 8891 | ||||
| Hydrochloric acid | 7647-01-0 | 15 | 0.0258712 | 24542 | ||||
| Quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl chlorides |
68424-85-1 | 5 | 0.00156199 | 1482 | ||||
| Telmer | Proprietary | 10 | 0.00156578 | 1486 | ||||
| EXCELERATE PS-2 | Halliburton | Friction Reducer | Listed Below | Listed Below | 0 | 0 | 0 | |
| Fresh Water | Operator | Base Fluid | Water | 7732-18-5 | 100 | 87.7274 | 83,219,100.0 | |
| SAND-PREMIUM WHITE-40/70, BULK | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2019 | GULFPORT ENERGY CORPORATION | 22465 | 0 | 4 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2019 | GULFPORT ENERGY CORPORATION | Brine | 11633 | 4 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -118868067 | 2019-2-13 0:00: | CT | No Violations | 0.10 |
| -840978055 | 2018-7-30 0:00: | PL | No Violations | 0.20 |
| -960175291 | 2020-5-27 0:00: | PW | No Violations | 1.00 |
| 0118868067 | 2019-02-13 | Completion Testing | No Violations | On this day, I found the stimulation process has been completed and the wells are being prepared for drill-out, which is projected to commence on 2/25/19. I spoke with Gulfport Company Representative Aaron Nero onsite, and he stated that 5 of 6 wells were stimulated. Permit number 4676 (5A) was not hydraulically fractured during the stimulation process of the additional wells on the pad. |
| 0840978055 | 2018-07-30 | Preliminary Restoration | No Violations | Preliminary Restoration status check inspection found vegetation established in the area affected by the well pad construction. There has been disturbance around the well pad where pipe lines have been installed that will require the vegetation to be established in those areas before the restoration can be signed off. The lease road and well pad surface does have a final grade of gravel present. Addressing the wells present on the pad. A total of 6 wells are present and to date only the drilling process has been completed on all 6 wells. The well are equipped with a lower A section and upper B section with a base plate and 2 master valves on top of the B section to allow access to the inside of the 5.5 diameter production casing. 2 diameter riser pipes are present on both the A & B well head sections with gauges present to monitor annular pressure. The pressure between the 5.5 diameter production casing and 9.625 is zero pounds per square inch (PSI) and the pressure between the 13.375 and 9.625 is zero psi. Other than the midstream valve station no production equipment has been installed on the well pad. |
| 1478963937 | 2016-11-12 | Casing String Witnessed | No Violations | On site inspection to witness the surface casing cement job with Pioneer Drilling rig # 73 on location. Upon arrival it was observed that the rig was attempting to get the casing to bottom with the last joint in and the string setting down approximately 18 off bottom, they have been circulating and trying to was the sting to bottom for 4 hours. The 17.5 borehole was drilled to 1,307.03 -O-Tex cement service is standing by to cement the casing. |
| 1962921201 | 2018-07-30 | Completion Testing | No Violations | On this day, I accompanied ODNR Inspector William Stolarik. Please reference his comments for a detailed report. The drilling process has completed and the wellhead has been plumbed. No flowlines or production equipment are onsite. The wellhead has annular pressure monitoring devices attached. The well is awaiting completion. |
| 2031811334 | 2019-10-22 0:00 | PL | No Violations | 0.30 |
For data sources see[9]