X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-111-24681

Well Details

Well ID: 34-111-24681
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Center Township
Operator Name: GULFPORT APPALACHIA LLC
Well Pad ID: US-OH-001405
Farm/Lease Name: POTTER 211254
License Status: Producing
License Date: 2016-09-27
Spud Date: 2016-10-06
Spud Drilling Contractor: PIONEER DRILLING
Final Drill Date: 2016-12-01
Well Total Depth: 18428.00 ft
Configuration: Horizontal
Latitude: 39.740000
Longitude: -81.070000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2016-09-27 Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:9/27/2016, Expired Date:9/27/2018 12:00:00 PM, Drilling unit acres:396.619, Proposed Well Type:OG, Proposed Well Class:NWC
Reached Total Depth 2016-12-01
Construction Permit Expires 2018-09-27
Record Last Modified 2019-06-11

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
18123 18279 0
10149 10338 0
10149 10338 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 01/27/2019 02/10/2019 9692 9,990,320.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 HYDROCHLORIC ACID Halliburton Solvent Listed Below Listed Below 0 0 0
SCALECHEK LP-70 Halliburton Scale Inhibitor Listed Below Listed Below 0 0 0
FDP-S1296-17 Halliburton Corrosion Inhibitor Listed Below Listed Below 0 0 0
SAND-COMMON WHITE-100 MESH, SSA-2, BULK (100003676) Halliburton Proppant Listed Below Listed Below 0 0 0
Ingredients Listed Above Listed Above Water 7732-18-5 100 0.255765 242623
MC B-8614 Halliburton Biocide Listed Below Listed Below 0 0 0
Inorganic salt Proprietary 30 0.0239834 22751
Modified thiourea polymer Proprietary 30 0.00009057 86
Propargyl alcohol 107-19-7 5 0.00001510 15
Methanol 67-56-1 100 0.00034565 329
Acrylic acid 79-10-7 0.01 0.00000157 2
Ethoxylated alcohols Proprietary 5 0.00001510 15
Ethanol 64-17-5 1 0.000312398 297
Ethylene glycol 107-21-1 60 0.00939466 8912
Acrylamide acrylate polymer Proprietary 30 0.0239834 22751
Crystalline silica, quartz 14808-60-7 100 11.9729 11,357,700.0
Hydrotreated light petroleum distillate 64742-47-8 30 0.0239834 22751
Phosphoric acid 7664-38-2 0.1 0.00003124 30
Sodium polyacrylate 9003-04-7 1 0.000156578 149
Glutaraldehyde 111-30-8 30 0.00937194 8891
Hydrochloric acid 7647-01-0 15 0.0258712 24542
Quaternary ammonium compounds,

benzyl-C12-16-alkyldimethyl chlorides

68424-85-1 5 0.00156199 1482
Telmer Proprietary 10 0.00156578 1486
EXCELERATE PS-2 Halliburton Friction Reducer Listed Below Listed Below 0 0 0
Fresh Water Operator Base Fluid Water 7732-18-5 100 87.7274 83,219,100.0
SAND-PREMIUM WHITE-40/70, BULK Halliburton Proppant Listed Below Listed Below 0 0 0

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2019 GULFPORT ENERGY CORPORATION 22465 0 4

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2019 GULFPORT ENERGY CORPORATION Brine 11633 4

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-118868067 2019-2-13 0:00: CT No Violations 0.10
-840978055 2018-7-30 0:00: PL No Violations 0.20
-960175291 2020-5-27 0:00: PW No Violations 1.00
0118868067 2019-02-13 Completion Testing No Violations On this day, I found the stimulation process has been completed and the wells are being prepared for drill-out, which is projected to commence on 2/25/19. I spoke with Gulfport Company Representative Aaron Nero onsite, and he stated that 5 of 6 wells were stimulated. Permit number 4676 (5A) was not hydraulically fractured during the stimulation process of the additional wells on the pad.
0840978055 2018-07-30 Preliminary Restoration No Violations Preliminary Restoration status check inspection found vegetation established in the area affected by the well pad construction. There has been disturbance around the well pad where pipe lines have been installed that will require the vegetation to be established in those areas before the restoration can be signed off. The lease road and well pad surface does have a final grade of gravel present. Addressing the wells present on the pad. A total of 6 wells are present and to date only the drilling process has been completed on all 6 wells. The well are equipped with a lower A section and upper B section with a base plate and 2 master valves on top of the B section to allow access to the inside of the 5.5 diameter production casing. 2 diameter riser pipes are present on both the A & B well head sections with gauges present to monitor annular pressure. The pressure between the 5.5 diameter production casing and 9.625 is zero pounds per square inch (PSI) and the pressure between the 13.375 and 9.625 is zero psi. Other than the midstream valve station no production equipment has been installed on the well pad.
1478963937 2016-11-12 Casing String Witnessed No Violations On site inspection to witness the surface casing cement job with Pioneer Drilling rig # 73 on location. Upon arrival it was observed that the rig was attempting to get the casing to bottom with the last joint in and the string setting down approximately 18 off bottom, they have been circulating and trying to was the sting to bottom for 4 hours. The 17.5 borehole was drilled to 1,307.03 -O-Tex cement service is standing by to cement the casing.
1962921201 2018-07-30 Completion Testing No Violations On this day, I accompanied ODNR Inspector William Stolarik. Please reference his comments for a detailed report. The drilling process has completed and the wellhead has been plumbed. No flowlines or production equipment are onsite. The wellhead has annular pressure monitoring devices attached. The well is awaiting completion.
2031811334 2019-10-22 0:00 PL No Violations 0.30

For data sources see[9]

References