If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-111-24691 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.86,"lon":-81.17,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Malaga Township | |
Operator Name: ANTERO RESOURCES CORPORATION | |
Well Pad ID: US-OH-001411 | |
Farm/Lease Name: STREAMER UNIT | |
License Status: Producing | |
License Date: 2016-11-28 | |
Spud Date: 2016-12-14 | |
Spud Drilling Contractor: H&P DRILLING | |
Final Drill Date: 2017-03-26 | |
Well Total Depth: 18219.00 ft | |
Configuration: Horizontal | |
Latitude: 39.860000 | |
Longitude: -81.170000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2016-11-28 | Proposed Formations:POINT PLEASANT, Issued Date:11/28/2016, Expired Date:11/28/2018 12:00:00 PM, Drilling unit acres:639.5, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2017-03-26 | REQUEST TO HOLD ALL LOGS CONFIDENTIAL FOR 12 MONTHS RCVD 5-11-17-ALE. |
Correction to Well | 2017-05-19 | UPDATE TARGET/TAKEPOINT PER AS-DRILLED PLAT RCVD 5-12-17 ALE. |
Completion Report Received | 2018-01-02 | REQUEST TO HOLD ALL LOGS CONFIDENTIAL FOR 12 MONTHS RCVD 5-11-17-ALE. |
Record Last Modified | 2018-01-10 | REQUEST TO HOLD ALL LOGS CONFIDENTIAL FOR 12 MONTHS RCVD 5-11-17-ALE. |
Construction Permit Expires | 2018-11-28 | REQUEST TO HOLD ALL LOGS CONFIDENTIAL FOR 12 MONTHS RCVD 5-11-17-ALE. |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2018-01-09 | 9211 | 9295 | 30 |
2018-01-09 | 17826 | 17995 | 30 |
17826 | 17995 | 30 | |
9211 | 9295 | 30 | |
9211 | 9295 | 30 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 07/27/2017 | 08/16/2017 | 9001 | 17,340,800.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | WFRA-405 | U.S. Well Services, LLC | Friction Reducer | 2-Propenoic acid, polymer with 2 propenamide | 9003-06-9 | 30 | 0.026988 | 45098.6 |
Hydrated light distillate (petroleum) | 64742-47-8 | 30 | 0.021725 | 36304.3 | ||||
SI-1200s | U.S. Well Services, LLC | Scale Inhibitor | Alkyl Phosphonic Acid | Proprietary | 5 | 0.000624 | 1042.08 | |
Ammonia | 7664-41-7 | 0.5 | 0.00009500 | 159.439 | ||||
Bioclear 2000 | U.S. Well Services, LLC | Anti-Bacterial Agent | 2,2-dibromo-3-nitrilopropionamide | 10222-01-2 | 20 | 0.004071 | 6802.88 | |
Deionized Water | 7732-18-5 | 28 | 0.002325 | 3885.77 | ||||
Sand | U.S. Well Services, LLC | Proppant | Crystalline Silica, quartz | 14808-60-7 | 100 | 13.1608 | 21,992,500.0 | |
Water | Antero Resources | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 86.5452 | 144,622,000.0 | |
LGC-15 | U.S. Well Services, LLC | Gelling Agents | Suspending agent (solid) | 14808-60-7 | 3 | 0.005901 | 9860.58 | |
Surfactant | 68439-51-0 | 3 | 0.002315 | 3868.38 | ||||
Guar Gum | 9000-30-0 | 50 | 0.038582 | 64473 | ||||
Petroleum Distillates | 64742-47-8 | 60 | 0.03654 | 61059.8 | ||||
AI-303 | U.S. Well Services, LLC | Acid Corrosion Inhibitors | Acetophenone,thiourea,formaldehyde polymer | 68527-49-1 | 5 | 0.00000400 | 6.672 | |
Ethylene glycol | 107-21-1 | 40 | 0.00004600 | 76.3277 | ||||
Formic acid | 64-18-6 | 20 | 0.00001600 | 26.688 | ||||
Cinnamaldehyde | 104-55-2 | 20 | 0.00001700 | 27.5954 | ||||
Polyether | 60828-78-6 | 10 | 0.00000800 | 13.344 | ||||
Butyl cellosolve | 111-76-2 | 20 | 0.00001400 | 24.0459 | ||||
HCL Acid (12.6%-17.5%) | U.S. Well Services, LLC | Bulk Acid | Hydrogen Chloride | 7647-01-0 | 17.5 | 0.028875 | 48251.1 | |
Water | 7732-18-5 | 87.4 | 0.124193 | 207533 | ||||
AP One | U.S. Well Services, LLC | Gel Breakers | Ammonium Persulfate | 7727-54-0 | 100 | 0.00164 | 2741 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2017-08-16 | H2O | 15 | 294588 Gal | 500808 | US Well Services Inc | STAGE 44/44
STAGES 2-43 SEE IMAGES |
2017-07-27 | H2O | 15 | 324450 Gal | 500882 | US Well Services Inc | STAGE 1/44
STAGES 2-43 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | ANTERO RESOURCES CORPORATION | 200833 | 0 | 61 |
2018 | ANTERO RESOURCES CORPORATION | 4114053 | 0 | 363 |
2019 | ANTERO RESOURCES CORPORATION | 365462 | 0 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | ANTERO RESOURCES CORPORATION | Brine | 4796 | 61 |
2018 | ANTERO RESOURCES CORPORATION | Brine | 76450 | 363 |
2019 | ANTERO RESOURCES CORPORATION | Brine | 5156 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1485733545 | 2017-11-1 0:00: | PW | No Violations | 0.50 |
-1492167820 | 2017-2-15 0:00: | CS | No Violations | 2.00 |
-1691092660 | 2017-2-15 0:00: | DD | No Violations | 0.50 |
-1800665871 | 2017-7-31 0:00: | CT | No Violations | 1.00 |
-596434314 | 2017-6-6 0:00:0 | PL | No Violations | 0.50 |
0197375682 | 2017-02-15 | Casing String Witnessed | No Violations | The purpose of my inspection is to witness the 13.375 inch diameter surface casing being cemented within a 17.5 inch diameter borehole that is 1270 feet in depth. A pre-job safety meeting was held with all personnel on location including Schlumberger, H&P, and Antero. Schlumberger pumped 200 barrels of fresh water, 30 barrels of gel, 10 barrels of fresh water, and 242 barrels of cement. The cement was Class A cement weighing 15.6 pounds per gallon. A cement sample was pulled and weighed in pressurized scales confirming the cement weight of 15.6 pounds per gallon. The plug was dropped and 190 barrels of fresh water was used for displacement. An estimated 33 barrels of cement returns were established. |
0596434314 | 2017-06-06 | Preliminary Restoration | No Violations | Preliminary Restoration status check inspection found the affected area depicted in the pre construction drawings has vegetation established and erosion control in place meeting ORC 1509.072. Signage is posted at the well pad entrance. Crews are on site erecting a polymer lined steel containment tank battery dike area. Baker Hughes pressure pumping service is on location and has assisted in the well bore toe prep operations. US Well service is slated to mobilize in the next 48 hours onto location to begin the well stimulation operation with a 6 existing wells on location slated to be stimulated. The well head assembly consists of a Cactus well head completion stack made up of a single Hydraulic Master Valve and Manual Master Valve sitting on top of the B-Section 10,000 psi rated lower well head assembly. |
1481903485 | 2016-12-14 | Casing String Witnessed | No Violations | Initial call out to witness the conductor casing cement job at 7:00 pm on 12/14/2016. While enroot to the location at 8:00 PM the company man notified me that the cement contractors had not arrived and were reporting a delayed arrival of at least 4 hours. I notified my supervisor Brent Bear of the delay and the decision was made to not attempt to witness the job due to the time delays and sub zero temperatures possibly causing further delays. The cement job did not commence until 1:30 am on 12/15/16. 135 of 26 conductor was set inside a 32 hole and cemented to surface. |
1485733545 | 2017-11-01 | Production Wells | No Violations | Status check inspection found the well drilling and completion process finished with the well equipped with a production tree and the production valve open. The tin horn cellars and mouse holes have been filled in. There is a total of 6 complete active wells on the pad all in production. There is also a total of 8 production tanks all of 400 barrel capacity each. There is 2 vapor recovery burner units attached to the tank battery and 6 gas processing units on location also. The location signage is present at the entry point and there is also a gate across the lease road. The well pad location and lease road is of stone construction and in good repair. The well pad has a total of 6 outlet drain catch basins that are in the closed position. |
1492167820 | 2017-02-15 | Casing String Witnessed | No Violations | During my inspection I met with Antero Company man Tommy. Tommy and I went over the cement proposal for the 13.375 inch diameter surface casing. Tommy stated that they will be cementing the 13.375 inch diameter surface casing within a 17.5 inch diameter borehole at a depth of 1270 feet. During my inspection the HP Drilling Rig 519 was running the 13.375 inch diameter surface casing. |
1691092660 | 2017-02-15 | Drill / Deepen / Reopen | No Violations | 7:30 am Status check inspection on the well drilling process found H&P Drilling rig 519 on location and has drilled a 17.5 diameter surface borehole to a measured depth of 1,280. I have been on will call stand by and delayed for 24 hours awaiting the 13.375 surface cement job due to the rig having problems with the air body lower sealing leaking between the air body and conductor casing and having to be repaired. The 13.375 diameter surface casing cement job is now scheduled for 13:00 Hours on this day Inspector Austin Guthridge is on will call stand by to cover the job. |
1800665871 | 2017-07-31 | Completion Testing | No Violations | Status check inspection on the well completion process found Allied Horizontal Wireline Service preparing to hav the wireline gun pumped down the hole by US Well Service to perforate stage 8 of 39 total stages to be stimulated in the well. The well will be perforated with 6 clusters of 10 shots between the depths of 16,590 and 16,423 with a composite completion plug set in the well bore at 16,608. All support equipment on location is placed on polymer containment. |
197375682 | 2017-2-15 0:00: | CS | No Violations | 7.00 |
2096359097 | 2018-05-14 | Production Wells | No Violations | Status check inspection found a total of 6 wells on the pad all in operation and producing. There is emergency shut down devices on both the tubing and well head production outlet flow lines with manual valves also present. Annular pressure monitoring gauges are present on the 13.375 and 9.625 well head sections with flow lines attached to each annular port leading to on site vapor recovery system. The wells are still flowing through sand trap separators before the product enters the gas processing units. Also on site is a 3rd party gas processing and distribution system. |
631077164 | 2020-2-7 0:00:0 | PW | No Violations | 1.20 |
For data sources see[10]