X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-111-24695

Well Details

Well ID: 34-111-24695
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Perry Township
Operator Name: DIVERSIFIED PRODUCTION LLC
Well Pad ID: US-OH-001366
Farm/Lease Name: NICK NACK
License Status: Producing
License Date: 2016-11-29
Spud Date: 2016-12-16
Spud Drilling Contractor: H&P DRILLING
Final Drill Date: 2017-01-26
Well Total Depth: 20154.00 ft
Configuration: Horizontal
Latitude: 39.640000
Longitude: -81.050000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2016-11-29 Proposed Formations:POINT PLEASANT, Issued Date:11/29/2016, Expired Date:11/29/2018 12:00:00 PM, Drilling unit acres:442.35, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2017-01-26
Correction to Well 2017-03-10 CORRECTION TO TARGET INFORMATION (FOOTAGE AND COORDINATES) FROM AS DRILLED SURVEY PLAT.
Completion Report Received 2017-05-10
Record Last Modified 2018-03-22
Construction Permit Expires 2018-11-29

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2017-05-11 10358 10458 36
2017-05-11 19958 20058 36
19958 20058 36
10358 10458 36
10358 10458 36

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 02/20/2017 03/19/2017 8658 14,788,800.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Edgemarc Carrier/Base Fluid Water 7732-18-5 100 85.264 123,413,000.0
KFR-23 Keane Friction Reducer oleic acid diethanolamide 93-83-4 2 0.00225762 3267.72
Alcohols, C12-16, ethoxylated 68551-12-2 2 0.00225762 3267.72
Distillates (petroleum), hydrotreated light 64742-47-8 45 0.0507964 73523.7
copolymer of 2-propenamide 69418-26-4 10 0.0112881 16338.6
Hydrochloric Acid (15%) Keane Acidizing Hydrochloric Acid 7647-01-0 15 0.245649 355558
Water 7732-18-5 85 1.39201 2,014,830.0
MBC-516W Keane Biocide glutaral 111-30-8 26.7 0.00585923 8480.76
ethanol 64-17-5 2.8 0.000614451 889.368
didecyldimethylammonium chloride 7173-51-5 8 0.00174899 2531.52
quaternary ammonium compounds,

benzyl-C12-16-alkyldimethyl, chlorides

68424-85-1 5.3 0.00116526 1686.62
Other Chemical(s) Listed Above See Trade Name(s) List Cinnamaldehyde 104-55-2 10 0.00033982 491.863
ethanol 64-17-5 2.8 0.000614451 889.368
propan-2-ol 67-63-0 5 0.00016991 245.931
Ethoxylated alcohol 68131-39-5 10 0.00033982 491.863
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.00033982 491.863
quaternary ammonium compounds,

benzyl-C12-16-alkyldimethyl, chlorides

68424-85-1 5.3 0.00116526 1686.62
Water 7732-18-5 85 1.39201 2,014,830.0
Citric acid 77-92-9 40 0.006909 10000.2
didecyldimethylammonium chloride 7173-51-5 8 0.00174899 2531.52
Alkyl phosphonic acid Proprietary 5 0.00104911 1518.5
Alcohols, C12-16, ethoxylated 68551-12-2 2 0.00225762 3267.72
formic acid 64-18-6 10 0.00033982 491.863
copolymer of 2-propenamide 69418-26-4 10 0.0112881 16338.6
dipropylene gylcol, monomethyl ether 34590-94-8 20 0.000679641 983.725
oleic acid diethanolamide 93-83-4 2 0.00225762 3267.72
Terraprop Edgemarc Proppant Aluminum oxide 1344-28-1 90 1.69248 2,449,730.0
Sand (Proppant) Keane Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 100 11.0413 15,981,500.0
KFEAC-30 Keane Iron Control Citric acid 77-92-9 40 0.006909 10000.2
acetic acid 64-19-7 60 0.0103635 15000.3
KAI-13 Keane Acid Inhibitor dipropylene gylcol, monomethyl ether 34590-94-8 20 0.000679641 983.725
Ethoxylated alcohol 68131-39-5 10 0.00033982 491.863
propan-2-ol 67-63-0 5 0.00016991 245.931
ethanediol 107-21-1 40 0.00135928 1967.45
Cinnamaldehyde 104-55-2 10 0.00033982 491.863
formic acid 64-18-6 10 0.00033982 491.863
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.00033982 491.863
KSI-16 Keane Scale Inhibitor Alkyl phosphonic acid Proprietary 5 0.00104911 1518.5
ammonia 7664-41-7 0.5 0.000104911 151.85

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2017-03-19 H2O 15 219188 Gal 299140 Keane Frac STAGE 65 OF 65…SEE IMAGES FOR STAGES 2-64
2017-02-20 H2O 15 320880 Gal 296200 Keane Frac STAGE 1 OF 65…SEE IMAGES FOR STAGES 2-64

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2017 EM ENERGY OHIO LLC 3346060 0 263
2018 EM ENERGY OHIO LLC 2880150 0 365
2019 EM ENERGY OHIO LLC 462493 0 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2017 EM ENERGY OHIO LLC Brine 35680 263
2018 EM ENERGY OHIO LLC Brine 39166 365
2019 EM ENERGY OHIO LLC Brine 4110 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1309271630 2019-5-21 0:00: PL No Violations 0.50
0306922475 2019-01-25 Production Wells No Violations On this day, I found the pad fenced and gated with signage at the entrance. There are (2) producing wells, (2) gas processing units (GPU), and (3) 500-barrel steel production tanks within polymer lined steel containment. An Emergency Shutdown (ESD) button is present at the production facility. Additionally, concrete barriers surround the perimeter of the wellheads and GPUs. Identification and annular pressure monitoring devices are present at the wellheads. The 9.625 inch diameter intermediate casing has a pressure of 1,000 pounds per square inch (psi), and the 13.375 inch diameter surface casing has a pressure of 300 psi. Additionally, the pad is being used as a staging area during completion operations on a nearby pad.
0469518376 2017-04-24 Completion Testing No Violations Status check inspection on the well completion process found the well drilling and stimulation process complete and the well has the completion plugs drilled out. Colter Energy Services is on location flow testing the wells initial production. The well is being produced through the 5.5 production casing with (2) manually controlled master safety valves present and sold into a production sales line. The preliminary Restoration is due however construction is currently taking place on the well pad to the extent of the production flow lines being installed.
1309271630 2019-05-21 Preliminary Restoration No Violations On this day, I am conducting a preliminary restoration inspection. The site meets ORC 1509.072(A). I found the site gated with signage at the entrance and surrounded with an earthen berm. There are (2) producing wells and (2) gas processing units. The production facility consists of (3) 500 barrel steel tanks all within containment. Annular pressure monitoring devices are equipped. The 9.625 inch diameter casing has a pressure of 1,000 pounds per square inch (psi) and the 13.375 inch diameter casing has a pressure of 400 psi. Identification is posted at the wellhead, along with an emergency shutdown button. It will be noted that I spoke with EdgeMarc Production Superintendent Mark Toplovich onsite.
1482246240 2016-12-18 Casing String Witnessed No Violations On site to witness setting and cementing of 20 inch conductor pipe Halliburton cemented it in place with 240 sacks of Halcem ClassA Cement and they had 23 barrel of good cement returns to surface.

HAD drilling was the drilling contractor for the conductor job.

1483609943 2017-01-05 Casing String Witnessed No Violations On site inspection at 4:00 am to witness the surface casing cement job. H&P Drilling rig 521 is on location and has drilled a 17.5 surface borehole to a measured depth of 1,951 and inserted 1,921 of 13.375 diameter 54.5 pound per foot J-
1496837941 2017-06-07 Production Wells No Violations Status check inspection as a response to complaint number 5619 indicating a that there is a odor coming from the well pad. The company was contacted regarding the complaint and has attempted to address the complaint by decreasing the glycol heater running temperature in attempt to subside the vapor emission from the heater stack. Upon my inspection it was observed that 2 well heads are present on location along with 2 glycol heaters. The production valves were in the open position and selling into the glycol heaters. Also on location is a production facility consisting of 3- 400 barrel capacity steel tanks located inside a polymer line steel containment dike area. A slight odor was present on location but not noticeable in the surrounding area as before the complaint.
1531409052 2018-07-12 Production Wells No Violations Status check inspection found the well is equipped with a 20 diameter conductor casing string a 13.375 diameter surface casing string 9.625 diameter intermediate string and a 5.5 diameter production casing string. The well head assembly consists of a lower A section and upper B section with a the well producing off the 5.5 diameter production casing string. The well is producing through the production tree with 2 manual valves present on top of the well head B section. Atop of the completion stack is a production flow cross with 2 additional manual shut down valves present and 2 emergency shut down valve also in line. The well is selling into a 3 diameter sales line with a line pressure of 1,313 pounds per square inch line pressure (PSI). The 5.5 diameter production casing pressure is 1,811 psi. Annular pressure monitoring is in place with 300 psi on the 13.375 diameter surface casing and 1,200 psi on the 9.625 intermediate casing pressure. The well is selling through a flow back manifold with a sand trap vertical separator present. Down line from the sand trap separator is a gas processing unit followed by a contact tower and glycol heater. There is a 3rd party midstream valve point on the West side of the well pad. The production fluid facility consists of 3 steel construction tanks of 400 barrel capacity each, all tanks are situated inside a polymer lined steel containment dike area. The well pad perimeter does have an 8 chain link fence in place and a lock on the gate. I have also addressed a complaint identified as complaint # 5883 filed by a local landowner indicate a odor in the area of her home. I have spoken with a Edgemark representative identified as Jeff Dierdorf in regards to the complaint and also followed up on location.
1577328352 2017-01-12 Drill / Deepen / Reopen No Violations
1580760028 2020-2-3 0:00:0 PW No Violations 0.80
306922475 2019-1-25 0:00: PW No Violations 0.50
469518376 2017-4-24 0:00: CT No Violations 1.00
684796249 2020-7-15 0:00: PW No Violations 1.00

For data sources see[10]

References