Well Details

Well ID: 34-111-24706
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Malaga Township
Operator Name: ANTERO RESOURCES CORPORATION
Well Pad ID: US-OH-001414
Farm/Lease Name: MANN UNIT
License Status: Producing
License Date: 2016-12-23
Spud Date: 2017-01-05
Spud Drilling Contractor: FRONTIER DRILLING
Final Drill Date: 2017-03-15
Well Total Depth: 18787.00 ft
Configuration: Horizontal
Latitude: 39.860000
Longitude: -81.170000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2016-12-23 Proposed Formations:POINT PLEASANT, Issued Date:12/23/2016, Expired Date:12/23/2018 12:00:00 PM, Drilling unit acres:998.971, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2017-03-15 12 MONTHS CONFIDENTIALITY REQUEST ON ALL LOGS-ALE 05/23/2017
Correction to Well 2017-06-30 UPDATE TARGET/TAKE PER AS-DRILLED PLAT RCVD 5-23-17 ALE
Correction to Well 2017-09-01 UPDATE TAKE PER AS-DRILLED PLAT-ALE
Completion Report Received 2018-01-02 12 MONTHS CONFIDENTIALITY REQUEST ON ALL LOGS-ALE 05/23/2017
Record Last Modified 2018-01-12 12 MONTHS CONFIDENTIALITY REQUEST ON ALL LOGS-ALE 05/23/2017
Construction Permit Expires 2018-12-23 12 MONTHS CONFIDENTIALITY REQUEST ON ALL LOGS-ALE 05/23/2017

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2018-01-11 9264 9433 4
2018-01-11 18458 18627 4
18458 18627 4
9264 9433 4
9264 9433 4

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 06/07/2017 08/13/2017 9518 18,642,900.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 DWP-641 CWS Friction Reducer Listed Below Green Line Listed Below 0 0 0
Citric acid 77-92-9 60 0.00047 842.7
Quaternary ammonium compounds,

bis(hydrogenated tallow alkyl)dimethyl, salts with bentonite

68953-58-2 5 0.00319 5749.33
Oxirane, 2-methyl-, polymer with oxirane, monodecyl ether 37251-67-5 1.5 0.00096 1724.8
Sodium bromide 7647-15-6 4 0.00045 807.95
1,2-Propanediol 57-55-6 10 0.00151 2720.17
Polyethylene glycol mixture 25322-68-3 54.5 0.00612 11008.3
Guar gum 9000-30-0 60 0.03833 68992
Amines, tallow alkyl, ethoxylated 61791-26-2 1 0.00083 1485.26
Ilmenite 98072-94-7 0.1 0.00302 5429.1
Ammonium chloride 12125-02-9 11 0.00908 16337.9
Polymer 26100-47-0 45 0.03713 66836.8
Distillates (petroleum), hydrotreated middle 64742-46-7 60 0.03833 68992
Crystalline silica (Quartz) 14808-60-7 100 13.214 23,787,400.0
Dibromoacetonitrile 3252-43-5 3 0.00034 605.96
Calcite 471-34-1 1 0.02152 38747.4
Biotite 1302-27-8 0.1 0.00404 7274.22
Goethite 1310-14-1 0.1 0.00609 10964.5
Acrylamide 79-06-1 0.1 0.00008000 148.53
Ammonium Persulfate 7727-54-0 0 0.00135 2437
Paraffinic hydrocarbon solvent 64742-47-8 30 0.02475 44557.9
Hydrochloric acid 7647-01-0 37 0.04974 89537.9
Vinylidene chloride-methyl acrylate copolymer 25038-72-6 0 0.00027 487.4
Apatite 64476-38-6 0.1 0.00404 7274.22
Sorbitan monooleate 1338-43-8 4 0.0033 5941.05
Sorbitol tetraoleate 61723-83-9 2 0.00165 2970.53
2-Propenoic acid, homopolymer, sodium salt 9003-04-7 40 0.00604 10880.7
Illite 12173-60-3 1 0.00814 14658.6
2,2-Dibromo-3-Nitrilopropionamide 10222-01-2 0 0.00224 4039.73
Polyethylene glycol monooleate 9004-96-0 3 0.00248 4455.79
Alcohols, C12-14, ethoxylated 84133-50-6 0.5 0.00041 742.63
DAP-103 CWS Iron Control Listed Below Green Line Listed Below 0 0 0
DWP-111 CWS Gel Slurry Listed Below Green Line Listed Below 0 0 0
DAP-902 CWS Scale Inhibitor Listed Below Green Line Listed Below 0 0 0
Water Supplied by Operator Base Fluid Water 7732-18-5 100 86.5101 0
Other Chemical(s) Listed Above See Trade Name(s) List Listed Below
Sand (Proppant) CWS Propping Agent Listed Below Green Line Listed Below 0 0 0
Calbreak 5501 CWS Breaker Listed Below Green Line Listed Below 0 0 0
SANIFRAC 8844 CWS Biocide Listed Below Green Line Listed Below 0 0 0
Hydrochloric Acid CWS Clean Perforations Listed Below Green Line Listed Below 0 0 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2017-06-07 H2O 15 8628 Bbl 508300 CalFrac STAGE 1/47

STAGES 2-46 SEE IMAGES

2017-08-13 H2O 15 10044 Bbl 513860 CalFrac STAGE 47/47

STAGES 2-46 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2017 ANTERO RESOURCES CORPORATION 224217 0 61
2018 ANTERO RESOURCES CORPORATION 5790669 0 364
2019 ANTERO RESOURCES CORPORATION 610556 0 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2017 ANTERO RESOURCES CORPORATION Brine 4703 61
2018 ANTERO RESOURCES CORPORATION Brine 75962 364
2019 ANTERO RESOURCES CORPORATION Brine 6825 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1386769843 2017-2-28 0:00: CS No Violations 6.00
-217515233 2018-5-14 0:00: PW No Violations 0.20
-619681464 2017-2-27 0:00: DD No Violations 1.00
-64154142 2017-6-6 0:00:0 CT No Violations
-91308496 2020-3-10 0:00: PW No Violations 1.00
0064154142 2017-06-06 Completion Testing No Violations Status check inspection on the well completion process found CalFrac Pressure Pumping Service rigging up on the hole and preparing to begin the stimulation process within the next 48 hours. Nine Energy Wireline will be providing wireline services. The well head consists of a Cameron B section pressure rated at 15,000 pound per square inch (psi) working pressure with a Cactus Completion stack consisting of a lower manual and hydraulic upper master control valves topped off with a flow cross valve section all rated at 15,000 psi working pressure. All stimulation equipment is situated on polymer containment with the well pad perimeter earthen berm being the primary containment.
0089571564 2017-01-06 Casing String Witnessed No Violations I was on location to witness Express Energy cement the 26 inch diameter conductor casing into a 32 inch diameter bore hole. Express drilled a 100 foot 32 inch diameter bore hole and set 100 feet of 26 inch diameter conductor casing into the hole. Express ran 8 barrels of fresh water gel ahead of the cement. Express then ran 330 sacks of cement, 2% CaCL, and .50 parts per sack of floseal with 69.35 barrels of fresh water at 15.6 pounds and a yield of 1.18. Express then circulated with 55.74 barrels of fresh water until we got cement to surface. Express circulated about 18 barrels of cement to surface and finished cementing the conductor into the bore hole.
0217515233 2018-05-14 Production Wells No Violations Status check inspection found the well in production and selling off the production tree with 3 primary production valves open along with the (ESD) emergency shut down valve. The company has installed on the 9.625 and 13.375 well head sections annular pressure gauges and flow lines that are tied into the low pressure recover system, the company is monitoring all annuli. There is a total of 4 wells on the pad all with the same similar construction with all 4 wells producing through sand trap separators during the initial production stages. There is also 4 gas processing units on location. Also present is a production fluid storage facility consisting of a total of 8 steel construction tanks of 400 barrel capacity located inside a polymer lined steel containment area.
0619681464 2017-02-27 Drill / Deepen / Reopen No Violations During my inspection Frontier Drilling Rig 32 was preparing to spud the 17.5 inch diameter borehole surface section. Antero Company man stated that they will run 13.375 inch diameter casing to an estimated depth of 1227 feet. I will receive a notification of the spud and estimated cement time.
1386769843 2017-02-28 Casing String Witnessed No Violations The purpose of my inspection is to witness 1232 feet of the 54.5 pound per foot 13.375 inch diameter surface casing being cemented within a 17.5 inch diameter borehole that is 1260 feet in depth. A pre-job safety meeting was held with all personnel on location including Halliburton Cementing, Frontier, and Antero Company man. Halliburton pumped 230 barrels of fresh water ahead to break circulation, 50 barrels of gel, 10 barrels of fresh water, and 245 barrels of cement. The cement was Class A cement weighing 15.6 pounds per gallon. I witnessed Halliburton pull a cement sample and weigh it using pressurized scales to confirm the weight of 15.6 pounds per gallon. The plug was dropped and 183 barrels of fresh water was used for displacement. An estimated 90 barrels of cement returns were witnessed in the cellar. Floats held.
1489084725 2017-03-09 Drill / Deepen / Reopen No Violations Status check inspection on the well drilling progress found Frontier Drilling rig 32 on location running in the hole with the 8.5 directional drilling assembly preparing to begin drilling the production borehole. The 9.625 casing string was recently set at a measured depth of 8,316 with a reported 60 barrels of cement returns to surface during the cement job. I also spoke with ODNR Engineer Tech Andy Thomas in regards to the condition of the affected area outside the well pad and the need for attention to the bare earth exposed to the elements with noticeable erosion beginning within the limits of disturbance. Andy will follow up with the company. The well pad construction was completed during the last quarter of 2016 and will need erosion control addressed and vegetation established before the Preliminary Restoration can be signed off as complete.
1948152600 2017-11-01 Preliminary Restoration No Violations Preliminary Restoration status check inspection found the area affected by the well pad construction to have vegetation and erosion control present. At the time of my inspection contract workers from Myers Well Service were on site removing the erosion control filter socks from the well pad perimeter. Also noted is the well pad perimeter has a total of 6 catch basins with fluid outlet discharge drains in the closed position. Addressing the 4 active wells on the location, all 4 wells have been drilled and completed and the initial flow back stages are complete. The wells are complete with production trees and the production outlet valves are in the open position. The tin horn cellars have been filled with river gravel and have siphon tubes in place for fluid recovery. The mouse holes have also been closed in. There is annular monitoring in place on the well heads. The wells are selling into gas processing units with a total of 4 units present on location one each supporting each well. The well production fluid is being discharged into a tank battery consisting of 8 steel tanks holding a capacity of 400 barrels of fluid each, downstream from the tanks are 2 low pressure vapor burner stacks. The well pad and lease road are of stone construction with signage posted at the well pad entrance and a gate present half way down the lease road.
89571564 2017-1-6 0:00:0 CS No Violations 4.50