If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-111-24711 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.74,"lon":-81.06,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Monroe | |
| Municipality: Center Township | |
| Operator Name: GULFPORT APPALACHIA LLC | |
| Well Pad ID: US-OH-001439 | |
| Farm/Lease Name: PAULUS 211268 | |
| License Status: Producing | |
| License Date: 2017-02-24 | |
| Spud Date: 2017-04-17 | |
| Spud Drilling Contractor: PIONEER DRILLING | |
| Final Drill Date: 2017-06-02 | |
| Well Total Depth: 18868.00 ft | |
| Configuration: Horizontal | |
| Latitude: 39.740000 | |
| Longitude: -81.060000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2017-01-19 | Proposed Formations:TRENTON, Issued Date:1/19/2017, Expired Date:1/19/2019 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
| APP | 2017-02-24 | Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:2/24/2017, Expired Date:2/24/2019 12:00:00 PM, Drilling unit acres:346.413, Proposed Well Type:OG, Proposed Well Class:EOUT |
| Correction to Well | 2017-06-09 | CHANGE IN TARGET INFORMATION & UNIT SIZE FROM AS DRILLED SURVEY PLAT. |
| Record Last Modified | 2018-02-01 | |
| Correction to Well | 2018-02-02 | UPDATE TARGET/TAKE/ACREAGE PER AS-DRILLED PLAT |
| Construction Permit Expires | 2019-02-24 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 18559 | 18724 | 0 | |
| 10783 | 10921 | 0 | |
| 10783 | 10921 | 0 |
For data sources see[3]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 03/08/2019 | 03/30/2019 | 9973 | 13,837,100.0 | 0 |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Ingredients | Listed Above | Listed Above | Water | 7732-18-5 | 100 | 0.731363 | 966202 |
| Acrylic acid | 79-10-7 | 0.01 | 0.00000167 | 3 | ||||
| Hydrotreated light petroleum distillate | 64742-47-8 | 30 | 0.0268798 | 35511 | ||||
| Sodium polyacrylate | 9003-04-7 | 1 | 0.000167302 | 222 | ||||
| Modified thiourea polymer | Proprietary | 0 | 0 | 0 | ||||
| Propargyl alcohol | 107-19-7 | 0 | 0 | 0 | ||||
| Ethanol | 64-17-5 | 1 | 0.000333456 | 441 | ||||
| Hydrochloric acid | 7647-01-0 | 15 | 0.383933 | 80919 | ||||
| Ethylene glycol | 107-21-1 | 60 | 0.0100381 | 13262 | ||||
| Telmer | Proprietary | 10 | 0.00167302 | 2211 | ||||
| Ethoxylated alcohols | Proprietary | 0 | 0 | 0 | ||||
| Phosphoric acid | 7664-38-2 | 0.1 | 0.00003335 | 45 | ||||
| Glutaraldehyde | 111-30-8 | 30 | 0.0100037 | 13216 | ||||
| Quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl chlorides |
68424-85-1 | 5 | 0.00166728 | 2203 | ||||
| Acrylamide acrylate polymer | Proprietary | 30 | 0.0268798 | 35511 | ||||
| Methanol | 67-56-1 | 0.14 | 0.00004668 | 62 | ||||
| Crystalline silica, quartz | 14808-60-7 | 100 | 11.9722 | 15,816,500.0 | ||||
| Inorganic salt | Proprietary | 30 | 0.0268798 | 35511 | ||||
| SCALECHEK LP-70 | Halliburton | Scale Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 | |
| FDP-S1296-17 | Halliburton | Corrosion Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 | |
| HYDROCHLORIC ACID | Halliburton | Solvent | Listed Below | Listed Below | 0 | 0 | 0 | |
| SAND-PREMIUM WHITE-40/70, BULK | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
| MC B-8614 | Halliburton | Biocide | Listed Below | Listed Below | 0 | 0 | 0 | |
| SAND-COMMON WHITE-100 MESH, SSA-2, BULK (100003676) | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
| EXCELERATE PS-2 | Halliburton | Friction Reducer | Listed Below | Listed Below | 0 | 0 | 0 | |
| Fresh Water | Operator | Base Fluid | Water | 7732-18-5 | 100 | 87.2479 | 115,263,000.0 |
For data sources see[4]
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1694285279 | 2017-5-16 0:00: | CS | No Violations | 8.00 |
| -2008413293 | 2018-6-18 0:00: | CT | No Violations | 0.10 |
| -394693946 | 2017-5-22 0:00: | DD | No Violations | 1.00 |
| 0206552669 | 2018-09-24 | Completion Testing | No Violations | Status update inspection found a total of 10 wells present on this well pad. All 10 have been drilled and not completed. Each well is equipped with a lower A and upper well head section with 2 diameter riser pipes present on each section with valves and gauges present on each section for annular pressure monitoring. The casing head does have a multi valve set up with a mechanical gauge present. No tubing is in the well. No production equipment is present on the well pad other than the 3rd party mid stream pipeline. The well pad does have an earthen berm in place. The well pad surface and lease road is of stone construction and in good repair. Addressing the preliminary restoration. There is an area along the lease road that is within the well site boundary that was recently disturbed by the installation of a transportation pipeline. There is also a area on the West side of the well pad that was disturbed and vegetation not established. Larger diameter wooden poles are set on the East side of the well pad along the pad surface boundary for sound barrier during stimulation. There are (2) 12 diameter trunk lines that have been laid along the well pad perimeter, these lines are fresh water lines to support the stimulation process. The lease road does have a gate present. |
| 0394693946 | 2017-05-22 | Drill / Deepen / Reopen | No Violations | |
| 1492452224 | 2017-04-17 | Drill / Deepen / Reopen | No Violations | Status check inspection on the current well drilling progress found Butchs Rat Hole drilling service on location and has spudded the said well on this day. The auger rig is drilling a 36 diameter conductor borehole to a proposed depth of 110 and will run 26 diameter conductor casing. |
| 1694285279 | 2017-05-16 | Casing String Witnessed | No Violations | On site inspection to witness the surface casing cement job with Pioneer Drilling rig # 73 on location along with Wyoming Casing and O-Tex Cement Service. The rig has drilled a 17.5 diameter surface borehole to a measured depth of 1,392 and ran 1,390 of 54.5 pound per foot J-55 grade Buttress Thread casing with a casing float shoe an on the bottom of the string and a float collar set in the string at a depth of 1,346. All measurement were off of a 28.5 rig Kelly Bushing. Upon the landing of the casing joint the rig circulated the hole and established circulation to surface. O-Tex cemented the casing using a 262 barrel cement mix consisting of 1,220 sacks of class H cement with 3% calcium and 1/4 pound per sack cement additives with the cement weight verified at 15.6 pound per gallon by weight of scale. 50 barrels of 6% gel spacer was ran ahead of the cement. The cement was displaced with 208 barrels of fresh water with cement returns witnessed to surface at 165 barrels into displacement with the final displacement pressure being 630 psi upon the landing of the plug with the casing pressure tested to 1,190 psi upon the landing of the plug. |
| 1866474604 | 2019-05-16 | Completion Testing | No Violations | On this day, I found the drilling and hydraulic fracturing processes are completed. The frac plugs have been drilled out and the well is currently in the flowback stage. I spoke with Gulfport Representatives Corey Cloud and Robert Coots during the inspection. Annular pressure monitoring devices are in place and pressures are logged daily. Identification is posted at the wellhead. |
| 2008413293 | 2018-06-18 | Completion Testing | No Violations | On this day, I am conducting an inspection per request of ODNR Inspector William Stolarik. I spoke with Company Man, Ken Miller, during my inspection. (10) wells were drilled on the pad. They are currently plumbing the intermediate and surface casing, at the wellhead, and preparing to install pressure monitoring devices. The grates will be replaced over the cellar, when they are finished. |
| 206552669 | 2018-9-24 0:00: | CT | No Violations | 0.20 |
For data sources see[5]