X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-111-24714

Well Details

Well ID: 34-111-24714
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Center Township
Operator Name: GULFPORT APPALACHIA LLC
Well Pad ID: US-OH-001439
Farm/Lease Name: PAULUS 211153
License Status: Well Drilled
License Date: 2017-02-22
Spud Date: 2017-04-07
Spud Drilling Contractor:
Final Drill Date:
Well Total Depth:
Configuration: Horizontal
Latitude: 39.740000
Longitude: -81.060000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2017-01-19 Proposed Formations:TRENTON, Issued Date:1/19/2017, Expired Date:1/19/2019 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2017-02-22 Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:2/22/2017, Expired Date:2/22/2019 12:00:00 PM, Drilling unit acres:436.201, Proposed Well Type:OG, Proposed Well Class:EOUT
Correction to Well 2018-02-09 CHANGE TO TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT.
Record Last Modified 2018-03-12 STATUS PER AS-DRILLED SURVEY
Construction Permit Expires 2019-02-22 STATUS PER AS-DRILLED SURVEY

For data sources see[2]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-140100077 2017-2-5 0:00:0 DD No Violations 7.00
-1609325673 2017-4-17 0:00: DD No Violations 1.50
-2071506420 2018-6-18 0:00: CT No Violations 0.10
0140100077 2017-02-05 Drill / Deepen / Reopen No Violations On the day inspection I witnessed that Lightning Energy Services had drilled a 36 inch diameter hole to the depth of 110 feet, hitting water at 40 feet and ran 110 feet of 26 inch diameter 85.6 pounds per foot conductor pipe. Stingray Pressure Pumping was onsite and pumped 2 barrels of fresh water, performed a 1300 pounds per square inch pressure test, gained circulation with 20 barrels of fresh water, pumped 15 barrels of gel, pumped 10 barrels of fresh water and cemented pipe with 410 sacks Class A cement with 2% CaCl and .25 pound per sack of Celluseal weighing 15.6 pounds per gallon and a yield of 1.2 cubic foot per sack. Cement was weight was verified with pressurized mud scales and displaced to 95 feet with 59 barrels of fresh water with good cement returns of 15 barrels to surface. Mix water was tested revealing chlorides of 50 parts per million, pH 7 and 56 degrees.
1491563572 2017-04-07 Casing String Witnessed No Violations On site inspection arriving at 5:00 am to witness the surface casing cement job with Pioneer Drilling rig # 73 on location along with O-Tex cement service. The drilling rig has drilled a 17.5 diameter surface borehole to a measured depth of 1,390 and ran 1,390 of 13.375 diameter 54.5 pound per foot J-55 buttress thread casing with a guide shoe and float collar casing equipment ran along with 9 casing centralizers. The rig established fluid circulation while circulating the last casing joint in the hole. O-Tex cemented the casing by first pumping 50 barrels of 6% gel dyed spacer followed by a 262.9 barrel class H cement mix consisting of 1,220 sacks of cement. With the cement weight being verified by weight of scale. The cement was displaced with 210 barrels of recycled water with 38 barrels of cement returns to surface and the casing pressure tested to 1100 psi upon the landing of the cement plug.
1609325673 2017-04-17 Drill / Deepen / Reopen No Violations
2071506420 2018-06-18 Completion Testing No Violations On this day, I am conducting an inspection per request of ODNR Inspector William Stolarik. I spoke with Company Man, Ken Miller, during my inspection. (10) wells were drilled on the pad. They are currently plumbing the intermediate and surface casing, at the wellhead, and preparing to install pressure monitoring devices. The grates will be replaced over the cellar, when they are finished.
2117038446 2018-09-24 Completion Testing No Violations Status update inspection found a total of 10 wells present on this well pad. All 10 have been drilled and not completed. Each well is equipped with a lower A and upper well head section with 2 diameter riser pipes present on each section with valves and gauges present on each section for annular pressure monitoring. The casing head does have a multi valve set up with a mechanical gauge present. No tubing is in the well. No production equipment is present on the well pad other than the 3rd party mid stream pipeline. The well pad does have an earthen berm in place. The well pad surface and lease road is of stone construction and in good repair. Addressing the preliminary restoration. There is an area along the lease road that is within the well site boundary that was recently disturbed by the installation of a transportation pipeline. There is also a area on the West side of the well pad that was disturbed and vegetation not established. Larger diameter wooden poles are set on the East side of the well pad along the pad surface boundary for sound barrier during stimulation. There are (2) 12 diameter trunk lines that have been laid along the well pad perimeter, these lines are fresh water lines to support the stimulation process. The lease road does have a gate present.

For data sources see[3]

References