If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-111-24720 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.82,"lon":-80.96,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Monroe | |
| Municipality: Switzerland Township | |
| Operator Name: CNX GAS COMPANY LLC | |
| Well Pad ID: US-OH-001436 | |
| Farm/Lease Name: FOLLOWAY BRIAN SCOTT | |
| License Status: Producing | |
| License Date: 2017-02-06 | |
| Spud Date: 2017-02-12 | |
| Spud Drilling Contractor: PATTERSON DRILLING | |
| Final Drill Date: 2017-05-15 | |
| Well Total Depth: 21145.00 ft | |
| Configuration: Horizontal | |
| Latitude: 39.820000 | |
| Longitude: -80.960000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2017-02-06 | Proposed Formations:POINT PLEASANT, Issued Date:2/6/2017, Expired Date:2/6/2019 12:00:00 PM, Drilling unit acres:668.49, Proposed Well Type:OG, Proposed Well Class:EOUT |
| Reached Total Depth | 2017-05-15 | WELL DRILLED TO TD OF 21145', DUE TO HOLE ISSUES PROD CASING SET @ 19738' ALE. |
| Completion Report Received | 2017-12-21 | WELL DRILLED TO TD OF 21145', DUE TO HOLE ISSUES PROD CASING SET @ 19738' ALE. |
| Correction to Well | 2018-01-05 | UPDATE TARGET/TAKE POINT PER AS-DRILLED PLAT |
| Record Last Modified | 2018-01-22 | WELL DRILLED TO TD OF 21145', DUE TO HOLE ISSUES PROD CASING SET @ 19738' ALE. |
| Construction Permit Expires | 2019-02-06 | WELL DRILLED TO TD OF 21145', DUE TO HOLE ISSUES PROD CASING SET @ 19738' ALE. |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2017-12-27 | 10621 | 10796 | 0 |
| 2017-12-27 | 19767 | 21167 | 0 |
| 19767 | 21167 | 0 | |
| 10621 | 10796 | 0 | |
| 10621 | 10796 | 0 |
For data sources see[3]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 09/20/2017 | 10/06/2017 | 10285 | 24,236,100.0 | 0 |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | AP Breaker | UPP | Gel breaker | Ammonium peroxydisulfate | 7727-54-0 | 100 | 0.000610479 | 1438 |
| Sulfuric acid | 7664-93-9 | 0.5 | 0.00000305 | 7.19 | ||||
| Ceramic Proppant | Carbo Ceramics | Proppant | Ceramic materials and wares, chemicals | 66402-68-4 | 100 | 3.18735 | 7,507,880.0 | |
| Sand | UPP | Proppant | Crystalline Silica in the form of Quartz | 14808-60-7 | 99.9 | 10.0338 | 23,635,000.0 | |
| Scale Inhibitor E | UPP | Scale Inhibitor | Hexamethylene Triamine Penta(Methylene Phosphonic Acid) | 34690-00-1 | 5 | 0.000733597 | 1728.01 | |
| DETA phosphonate | 15827-60-8 | 5 | 0.000733597 | 1728.01 | ||||
| Copolymer of Maleic and Acrylic Acid | 52255-49-9 | 20 | 0.00293439 | 6912.03 | ||||
| Water | Consol | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 85.8621 | 202,251,000.0 | |
| WGA-7 | UPP | Viscosifier | Distillates (petroleum), hydrotreated light | 64742-47-8 | 55 | 0.0144364 | 34005.3 | |
| Guar Gum | 9000-30-0 | 55 | 0.0144364 | 34005.3 | ||||
| HCL Acid (15%) | UPP | Acidizing | Hydrochloric Acid | 7647-01-0 | 15 | 0.115469 | 271991 | |
| Aqucar 714 | UPP | Biocide | Ethanol | 64-17-5 | 0.3 | 0.00003018 | 71.092 | |
| Quarternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides |
68424-85-1 | 2.5 | 0.000251508 | 592.434 | ||||
| Water | 7732-18-5 | 83 | 0.00835007 | 19668.8 | ||||
| Glutaraldehyde | 111-30-8 | 14 | 0.00140845 | 3317.63 | ||||
| Other Chemical(s) | Listed Above | See Trade Name(s) List | Alcohols, ethoxylated | 68439-50-9 | 5 | 0.00423259 | 9969.99 | |
| Sulfuric acid | 7664-93-9 | 0.5 | 0.00000305 | 7.19 | ||||
| Alcohols, C10-16, ethoxylated | 68002-97-1 | 50 | 0.000301469 | 710.118 | ||||
| Distillates (petroleum), hydrotreated light | 64742-47-8 | 55 | 0.0144364 | 34005.3 | ||||
| DETA phosphonate | 15827-60-8 | 5 | 0.000733597 | 1728.01 | ||||
| Thiourea | 62-56-6 | 1 | 0.00000603 | 14.202 | ||||
| Ammonium acetate | 631-61-8 | 13 | 0.0110047 | 25922 | ||||
| Water | 7732-18-5 | 83 | 0.00835007 | 19668.8 | ||||
| Alcohols, ethoxylated | 68002-97-1 | 5 | 0.00423259 | 9969.99 | ||||
| Quarternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides |
68424-85-1 | 2.5 | 0.000251508 | 592.434 | ||||
| Ethanol | 64-17-5 | 0.3 | 0.00003018 | 71.092 | ||||
| Formaldehyde | 50-00-0 | 1 | 0.00000603 | 14.202 | ||||
| Hexamethylene Triamine Penta(Methylene Phosphonic Acid) | 34690-00-1 | 5 | 0.000733597 | 1728.01 | ||||
| Methanol | 67-56-1 | 5 | 0.00003015 | 71.012 | ||||
| Alcohols, ethoxylated | 68551-12-2 | 5 | 0.00423259 | 9969.99 | ||||
| Unihib G | UPP | Acid inhibitor | Formaldehyde | 50-00-0 | 1 | 0.00000603 | 14.202 | |
| Methanol | 67-56-1 | 5 | 0.00003015 | 71.012 | ||||
| Butyl diglycol | 112-34-5 | 75 | 0.000452203 | 1065.18 | ||||
| Thiourea | 62-56-6 | 1 | 0.00000603 | 14.202 | ||||
| Alcohols, C10-16, ethoxylated | 68002-97-1 | 50 | 0.000301469 | 710.118 | ||||
| Unislick ST50 | UPP | Friction reducer | Petroleum distillates, hydrotreated light | 64742-47-8 | 30 | 0.0253956 | 59819.9 | |
| Alcohols, ethoxylated | 68439-50-9 | 5 | 0.00423259 | 9969.99 | ||||
| Alcohols, ethoxylated | 68002-97-1 | 5 | 0.00423259 | 9969.99 | ||||
| Alcohols, ethoxylated | 68551-12-2 | 5 | 0.00423259 | 9969.99 | ||||
| Ammonium acetate | 631-61-8 | 13 | 0.0110047 | 25922 |
For data sources see[4]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| 2017-10-06 | H2O | 15 | 11476 Bbl | 652590 | Universal Well Services Inc. | STAGE 52/52
STAGES 8-51 SEE IMAGES |
| 2017-09-21 | H2O | 15 | 92864 Bbl | 4097239 | Universal Well Services Inc. | STAGES 1-7/52
STAGES 8-51 SEE IMAGES |
For data sources see[5]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2017 | CNX GAS COMPANY LLC | 1004893 | 0 | 57 |
| 2018 | CNX GAS COMPANY LLC | 4998969 | 0 | 361 |
| 2019 | CNX GAS COMPANY LLC | 709280 | 0 | 89 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2017 | CNX GAS COMPANY LLC | Brine | 57920 | 57 |
| 2018 | CNX GAS COMPANY LLC | Brine | 133167 | 361 |
| 2019 | CNX GAS COMPANY LLC | Brine | 16010 | 89 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1558013652 | 2018-5-21 0:00: | PW | No Violations | 0.20 |
| -523988128 | 2018-2-21 0:00: | PW | No Violations | 0.50 |
| 0486242582 | 2017-08-16 | Completion Testing | No Violations | The pad is named Switz 26 and consists of 4 wells. During my inspection Universal Pressure Pumping, Allied Wireline, and CNX Company Man were on location. Universal Pressure Pumping was rigged up for hydraulic stimulation operations on the C and A well. Operations were at a stand-still and there was not any equipment in operation. I discussed with CNX Company Man annular pressure monitoring. He stated that they monitor the annular pressure at the wellhead and then run a line to the frac van when operations begin to record and monitor their pressures. The wellhead was equipped with a frac stack with all valves in the close position. Annular pressure monitoring was present. A 2 inch diameter steel line was plumbed up to the 9.625 inch diameter casing and ran to a bled off tank. |
| 0523988128 | 2018-02-21 | Production Wells | No Violations | Status check inspection found the well drilling and completion process now complete and the well in line and producing from the tubing flow cross section. The casing section of the well head is isolated with no flow lines attached. All well head annulis have pressure gauges and flow lines present with check valves present on the flow lines. On location is also a production fluid tank battery consisting of a total of (4) tanks of steel construction design situated inside a polymer lined steel containment area. Also on location is 4 gas processing units on each servicing each well on the pad. EQT also has a midstream operation off the back corner of the well pad. Emergency Shut down devices are located at the well pad entrance-at each well head -the tank battery and the gas processing units. |
| 0688006282 | 2017-08-03 | Completion Testing | No Violations | The purpose of my inspection was a status check. During my inspection the well was equipped with a frac valve in the closed position. The pad surface was lined with containment liner and frac tanks were being placed on containment. Location was in preparation for hydraulic stimulation operations. |
| 1493252547 | 2017-04-26 | Casing String Witnessed | No Violations | The purpose of my inspection was to witness the surface-mine string cement job. The coal seam is from 623 feet to 639 feet in depth. Patterson Drilling Rig 803 drilled a 24 inch diameter borehole to a depth of 713 feet. The 18.625 inch diameter casing, 87.5 pounds per foot, was run to a depth of 687 feet. Allied Cement Services was on location to cement the casing string in two stages with a packer set at 409 feet. I witnessed the last casing joint being landed. A pre job safety meeting was held with all personnel on location. Allied pumped 150 barrels of fresh water, 50 barrels of gel, and 10 barrels of fresh water were pumped ahead of the cement. 78 barrels of Class A cement with 1.5 percent calcium and 207 barrels of displacement were pumped to complete the first stage. The plug landed and the packer was energized. The second stage was completed using 190 barrels of fresh water, 50 barrels of gel, 10 barrels of fresh water, and 137 barrels of Class A cement with 1.5 percent calcium. 125 barrels of displacement were pumped, the floats held, and 15 barrels of cement returns were witnessed in the cellar. Cement density from both stages was checked during the job using pressurized scales confirming the weight of 15.6 pounds per gallon. |
| 1503594621 | 2017-08-24 | Completion Testing | No Violations | On site inspection during the well stimulation process found 4 wells on location and the company currently stimulating the (A) well on location identified as 34111247210000. The annular pressure of the (B) well was indeed verified prior to stimulating the 21st stage on the (B) well. The annular pressure was blead down from 400 psi to 36 pi and remained consistent at 36 psi throughout the stage. |
| 1558013652 | 2018-05-21 | Production Wells | No Violations | Producing well status check found that a total of 4 wells are present on the well pad and in production with the production valves on the tubing head assemblies in the open position. There is a total od 4 gas processing units on location and 4 steel design production tanks. A 3rd party midstream operator identified as EQT is set up at the rear of the well pad. There is a large portable water storage tank used in the stimulation process set up on the well pad also. |
| 1962194925 | 2020-5-18 0:00: | PL | No Violations | 1.00 |
| 486242582 | 2017-8-16 0:00: | CT | No Violations | 0.50 |
| 688006282 | 2017-8-3 0:00:0 | CT | No Violations | 0.10 |
For data sources see[10]