X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-111-24722

Well Details

Well ID: 34-111-24722
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Malaga Township
Operator Name: ANTERO RESOURCES CORPORATION
Well Pad ID: US-OH-001440
Farm/Lease Name: CARLIN UNIT
License Status: Producing
License Date: 2017-03-14
Spud Date: 2017-04-12
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2017-07-18
Well Total Depth: 18874.00 ft
Configuration: Horizontal
Latitude: 39.850000
Longitude: -81.180000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2017-02-08 Proposed Formations:POINT PLEASANT, Issued Date:2/8/2017, Expired Date:2/8/2019 12:00:00 PM, Drilling unit acres:478.637, Proposed Well Type:OG, Proposed Well Class:POOL
APP 2017-03-14 Proposed Formations:POINT PLEASANT, Issued Date:3/14/2017, Expired Date:3/14/2019 12:00:00 PM, Drilling unit acres:478.637, Proposed Well Type:OG, Proposed Well Class:EOUT
Reached Total Depth 2017-07-18
Correction to Well 2017-10-20 UPDATE TAKE/TARGET PER AS-DRILLED PLAT
Completion Report Received 2018-10-04
Record Last Modified 2018-10-19
Construction Permit Expires 2019-03-14

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2018-10-18 9011 9181 0
2018-10-18 18655 18753 0
18655 18753 0
9011 9181 0
9011 9181 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 06/09/2018 06/27/2018 8874 18,644,800.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 AP One U.S. Well Services, LLC Gel Breakers Ammonium Persulfate 7727-54-0 100 0.002014 3644
Bioclear 2000 U.S. Well Services, LLC Anti-Bacterial Agent Deionized Water 7732-18-5 28 0.002131 3855.42
2,2-dibromo-3-nitrilopropionamide 10222-01-2 20 0.003731 6749.73
HCL Acid (12.6%-17.5%) U.S. Well Services, LLC Bulk Acid Hydrogen Chloride 7647-01-0 17.5 0.02503 45288.3
Water 7732-18-5 87.4 0.107658 194790
WFRA-405 U.S. Well Services, LLC Friction Reducer 2-Propenoic acid, polymer with 2 propenamide 9003-06-9 30 0.022174 40119.6
Hydrated light distillate (petroleum) 64742-47-8 30 0.01785 32296.3
Water Antero Resources Carrier/Base Fluid Water 7732-18-5 100 85.942 155,498,000.0
SI-1200s U.S. Well Services, LLC Scale Inhibitor Proprietary Scale Inhibitor Proprietary 10 0.001237 2237.41
AI-303 U.S. Well Services, LLC Acid Corrosion Inhibitors Formic acid 64-18-6 20 0.00001300 23.352
Acetophenone,thiourea,formaldehyde polymer 68527-49-1 5 0.00000300 5.838
Ethylene glycol 107-21-1 40 0.00003700 66.7867
Polyether 60828-78-6 10 0.00000600 11.676
Cinnamaldehyde 104-55-2 20 0.00001300 24.146
Butyl cellosolve 111-76-2 20 0.00001200 21.0402
LGC-15 U.S. Well Services, LLC Gelling Agents Petroleum Distillates 64742-47-8 60 0.061481 111239
Suspending agent (solid) 14808-60-7 3 0.009929 17964.1
Surfactant 68439-51-0 3 0.003895 7047.46
Guar Gum 9000-30-0 50 0.064918 117458
Sand U.S. Well Services, LLC Proppant Crystalline Silica, quartz 14808-60-7 100 13.7359 24,852,900.0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2018-06-09 H2O 15 6520 Bbl 311880 US Well Services Inc STAGE 1/49

STAGES 2-48 SEE IMAGES

2018-06-27 H2O 15 8066 Bbl 509830 US Well Services Inc STAGE 49/49

STAGES 2-48 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 ANTERO RESOURCES CORPORATION 2036409 0 153
2019 ANTERO RESOURCES CORPORATION 1226715 0 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 ANTERO RESOURCES CORPORATION Brine 50021 153
2019 ANTERO RESOURCES CORPORATION Brine 21563 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1255805673 2018-9-10 0:00: CT No Violations 0.20
-1989523769 2017-6-19 0:00: DD No Violations 0.80
-293126727 2020-5-21 0:00: PW No Violations 1.00
-43165940 2018-9-10 0:00: CT No Violations 0.20
0043165940 2018-09-10 Completion Testing No Violations Status check inspection fount the well drill -stimulation-and post stimulation drill out process is now complete. Crews are on site installing all the production equipment. A tank battery has been erected consisting of 8 steel tanks capable of holding 400 barrels of fluid each. All tanks are situated inside a polymer lined steel containment dike area. 6 wells are present on the pad and all 6 are complete. Once the production equipment has been installed flow back operations will begin.
0342625626 2017-06-15 Drill / Deepen / Reopen No Violations Status check inspection on the well drilling process found Patterson Drilling rig 342 on location and currently drilling the 17.5 diameter surface borehole at a measured depth of 506 on air with a proposed total depth of 1,250. The drilling rig and support equipment is placed on polymer containment with the well pad earthen perimeter serving as the primary containment.
0956660428 2018-06-14 Completion Testing No Violations
1211701623 2018-07-12 Completion Testing No Violations Status check inspection found the well stimulation proses complete with a total of 49 stages complete. US Well is on location completing the last 2 wells on the pad out of 6 total wells. Annular pressure monitoring is in place on the 9.625 and 13.375 well head sections.
1254650234 2017-04-13 Casing String Witnessed No Violations
1255805673 2018-09-10 Completion Testing No Violations Status check inspection fount the well drill -stimulation-and post stimulation drill out process is now complete. Crews are on site installing all the production equipment. A tank battery has been erected consisting of 8 steel tanks capable of holding 400 barrels of fluid each. All tanks are situated inside a polymer lined steel containment dike area. 6 wells are present on the pad and all 6 are complete. Once the production equipment has been installed flow back operations will begin.
1497706489 2017-06-16 Casing String Witnessed No Violations On site to witness running and cementing of 13.375 surface casing Patterson Drilling rig 342 drilled to a depth of 1240 of 17.5 hole and ran 1230 of casing and Halliburton cemented it in place with 1130 sacks of Halcem blend cement and they had 35 bbl of good cement returns.
1509545545 2017-11-01 Preliminary Restoration No Violations Preliminary Restoration status check inspection found the well site meets ORC 1509.072 with vegetation established in the affected area of the well pad construction disturbance and erosion control in place. The well pad entrance is gated with signage in place. The lease road and well pad is of a stone surface. Addressing the wells on the pad, the drilling process is now complete and the 6 wells on the pad are awaiting stimulation with night caps on the well heads. Gauges are in place to monitor annular pressures. The tin horn cellars have been filled in with river gravel with fluid recovery tubes set inside the cellars. Also on the well pad is the tank battery consisting of 8 steel construction 400 barrel capacity tanks that are situated inside a polymer lined steel containment dike area. The well pad perimeter is constructed of an earthen berm with 3 catch basin fluid discharge points with the drain valves in the closed position. Contract workers from Hall Drilling are on site erecting the sales line and vapor recovery system burners.
1525271029 2018-05-02 Completion Testing No Violations Status check inspection found the well drilling process is now complete and crews from lighting energy are on site opening the toe sleeve valves and pressure testing the 5.5 diameter production casing string to 11,500 psi. The completion well head system is company identified as Downing and the well head consists of a manually operated lower master valve and the upper hydraulic master valve followed by a flow cross section. A support equipment is placed on polymer containment. Stimulation is slated begin in the next 14 days.
1989523769 2017-06-19 Drill / Deepen / Reopen No Violations
342625626 2017-6-15 0:00: DD No Violations 2.00
956660428 2018-6-14 0:00: CT No Violations 0.50

For data sources see[10]

References