If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-111-24723 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.85,"lon":-81.18,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Malaga Township | |
Operator Name: ANTERO RESOURCES CORPORATION | |
Well Pad ID: US-OH-001440 | |
Farm/Lease Name: CARLIN UNIT | |
License Status: Producing | |
License Date: 2017-03-14 | |
Spud Date: 2017-04-12 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2017-07-07 | |
Well Total Depth: 18304.00 ft | |
Configuration: Horizontal | |
Latitude: 39.850000 | |
Longitude: -81.180000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2017-02-08 | Proposed Formations:POINT PLEASANT, Issued Date:2/8/2017, Expired Date:2/8/2019 12:00:00 PM, Drilling unit acres:478.637, Proposed Well Type:OG, Proposed Well Class:POOL |
APP | 2017-03-14 | Proposed Formations:POINT PLEASANT, Issued Date:3/14/2017, Expired Date:3/14/2019 12:00:00 PM, Drilling unit acres:478.637, Proposed Well Type:OG, Proposed Well Class:EOUT |
Reached Total Depth | 2017-07-07 | |
Completion Report Received | 2018-10-04 | |
Record Last Modified | 2018-10-19 | |
Construction Permit Expires | 2019-03-14 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2018-10-18 | 9063 | 9232 | 0 |
2018-10-18 | 18085 | 18183 | 0 |
18085 | 18183 | 0 | |
9063 | 9232 | 0 | |
9063 | 9232 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 05/12/2018 | 06/03/2018 | 8886 | 17,336,400.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Antero Resources | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 85.9613 | 144,585,000.0 |
SI-1200s | U.S. Well Services, LLC | Scale Inhibitor | Proprietary Scale Inhibitor | Proprietary | 10 | 0.00117 | 1968.07 | |
AP One | U.S. Well Services, LLC | Gel Breakers | Ammonium Persulfate | 7727-54-0 | 100 | 0.002043 | 3436 | |
Bioclear 2000 | U.S. Well Services, LLC | Anti-Bacterial Agent | Deionized Water | 7732-18-5 | 28 | 0.002314 | 3892.78 | |
2,2-dibromo-3-nitrilopropionamide | 10222-01-2 | 20 | 0.004052 | 6815.14 | ||||
AI-303 | U.S. Well Services, LLC | Acid Corrosion Inhibitors | Acetophenone,thiourea,formaldehyde polymer | 68527-49-1 | 5 | 0.00000300 | 5.838 | |
Butyl cellosolve | 111-76-2 | 20 | 0.00001300 | 21.0402 | ||||
Ethylene glycol | 107-21-1 | 40 | 0.00004000 | 66.7867 | ||||
Polyether | 60828-78-6 | 10 | 0.00000700 | 11.676 | ||||
Cinnamaldehyde | 104-55-2 | 20 | 0.00001400 | 24.146 | ||||
Formic acid | 64-18-6 | 20 | 0.00001400 | 23.352 | ||||
LGC-15 | U.S. Well Services, LLC | Gelling Agents | Surfactant | 68439-51-0 | 3 | 0.003864 | 6498.51 | |
Guar Gum | 9000-30-0 | 50 | 0.064394 | 108309 | ||||
Suspending agent (solid) | 14808-60-7 | 3 | 0.009848 | 16564.8 | ||||
Petroleum Distillates | 64742-47-8 | 60 | 0.060984 | 102575 | ||||
Sand | U.S. Well Services, LLC | Proppant | Crystalline Silica, quartz | 14808-60-7 | 100 | 13.7019 | 23,046,300.0 | |
WFRA-405 | U.S. Well Services, LLC | Friction Reducer | 2-Propenoic acid, polymer with 2 propenamide | 9003-06-9 | 30 | 0.022881 | 38485.8 | |
Hydrated light distillate (petroleum) | 64742-47-8 | 30 | 0.018419 | 30981 | ||||
HCL Acid (12.6%-17.5%) | U.S. Well Services, LLC | Bulk Acid | Water | 7732-18-5 | 87.4 | 0.119057 | 200251 | |
Hydrogen Chloride | 7647-01-0 | 17.5 | 0.027681 | 46558.1 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2018-06-03 | H2O | 15 | 8264 Bbl | 511980 | US Well Services Inc | STAGE 46/46
STAGES 2-45 SEE IMAGES |
2018-05-12 | H2O | 15 | 6538 Bbl | 307840 | US Well Services Inc | STAGE 1/46
STAGES 2-45 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | ANTERO RESOURCES CORPORATION | 1685460 | 0 | 153 |
2019 | ANTERO RESOURCES CORPORATION | 982492 | 0 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | ANTERO RESOURCES CORPORATION | Brine | 41571 | 153 |
2019 | ANTERO RESOURCES CORPORATION | Brine | 17586 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1708146792 | 2020-5-21 0:00: | PW | No Violations | 1.00 |
0749748438 | 2017-11-01 | Preliminary Restoration | No Violations | Preliminary Restoration status check inspection found the well site meets ORC 1509.072 with vegetation established in the affected area of the well pad construction disturbance and erosion control in place. The well pad entrance is gated with signage in place. The lease road and well pad is of a stone surface. Addressing the wells on the pad, the drilling process is now complete and the 6 wells on the pad are awaiting stimulation with night caps on the well heads. Gauges are in place to monitor annular pressures. The tin horn cellars have been filled in with river gravel with fluid recovery tubes set inside the cellars. Also on the well pad is the tank battery consisting of 8 steel construction 400 barrel capacity tanks that are situated inside a polymer lined steel containment dike area. The well pad perimeter is constructed of an earthen berm with 3 catch basin fluid discharge points with the drain valves in the closed position. Contract workers from Hall Drilling are on site erecting the sales line and vapor recovery system burners. |
1235903468 | 2018-07-12 | Completion Testing | No Violations | Status check inspection found the well stimulation proses complete with a total of 46 stages complete. US Well is on location completing the last 2 wells on the pad out of 6 total wells. Annular pressure monitoring is in place on the 9.625 and 13.375 well head sections. |
1498399838 | 2017-06-24 | Casing String Witnessed | No Violations | On site towitness running and cementing of surface casing Patterson rig 342 drilled 17.5 hole to 1263 and ran 1250 of 13.375 casig and Halliburton cemented it in place with 1080 sacks of Halcem cement and they had 27 bbl of good returns to surface.
Note: Verified mix water to be fresh water prior to cement job and they had established good circulation of water prior to cementing operations. |
1563571197 | 2017-04-13 | Casing String Witnessed | No Violations | |
1872518193 | 2018-08-15 | Production Wells | No Violations | Status check inspection on the well completion process found a service rig on the hole owned by Fortis Well Service. Well head surface control is a combination of a snubbing unit owned by QES and 2 primary master valves owned by Cameron well head company. Fortis owns the fluid control service and the company is circulating with 9.8 pound per gallon brine while drilling out the completion plugs. The well bore total depth is 18,055. 2.375 diameter EUE production tubing will be set at 9,003 in the well bore. 2 rigs are set up drilling out the completion plugs on 2 wells on the pad. All completion equipment is situated on polymer containment. |
2060099090 | 2018-05-02 | Completion Testing | No Violations | Status check inspection found the well drilling process is now complete and crews from lighting energy are on site opening the toe sleeve valves and pressure testing the 5.5 diameter production casing string to 11,500 psi. The completion well head system is company identified as Downing and the well head consists of a manually operated lower master valve and the upper hydraulic master valve followed by a flow cross section. A support equipment is placed on polymer containment. Stimulation is slated begin in the next 14 days. |
749748438 | 2017-11-1 0:00: | PL | No Violations | 0.50 |
For data sources see[10]