34-111-24728

Well Details

Well ID: 34-111-24728
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Malaga Township
Operator Name: ANTERO RESOURCES CORPORATION
Well Pad ID: US-OH-001440
Farm/Lease Name: CRESTONE UNIT
License Status: Producing
License Date: 2017-03-27
Spud Date: 2017-04-12
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2017-06-09
Well Total Depth: 23145.00 ft
Configuration: Horizontal
Latitude: 39.850000
Longitude: -81.190000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2017-03-27 Proposed Formations:POINT PLEASANT, Issued Date:3/27/2017, Expired Date:3/27/2019 12:00:00 PM, Drilling unit acres:972.137, Proposed Well Type:OG, Proposed Well Class:NWC
Reached Total Depth 2017-06-09
Correction to Well 2017-10-20 UPDATE TAKE/TARGET PER AS-DRLLED PLAT
Completion Report Received 2018-10-04
Record Last Modified 2018-10-20
Construction Permit Expires 2019-03-27

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2018-10-19 9018 9187 0
2018-10-19 22926 23025 0
22926 23025 0
9018 9187 0
9018 9187 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 06/04/2018 06/28/2018 8886 23,369,100.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Bioclear 2000 U.S. Well Services, LLC Anti-Bacterial Agent 2,2-dibromo-3-nitrilopropionamide 10222-01-2 20 0.003867 8667.13
Deionized Water 7732-18-5 28 0.002209 4950.62
AI-303 U.S. Well Services, LLC Acid Corrosion Inhibitors Butyl cellosolve 111-76-2 20 0.00001300 30.0574
Polyether 60828-78-6 10 0.00000700 16.68
Acetophenone,thiourea,formaldehyde polymer 68527-49-1 5 0.00000400 8.34
Ethylene glycol 107-21-1 40 0.00004300 95.4096
Cinnamaldehyde 104-55-2 20 0.00001500 34.4942
Formic acid 64-18-6 20 0.00001500 33.36
Sand U.S. Well Services, LLC Proppant Crystalline Silica, quartz 14808-60-7 100 12.7078 28,484,300.0
AP One U.S. Well Services, LLC Gel Breakers Ammonium Persulfate 7727-54-0 100 0.001995 4471
LGC-15 U.S. Well Services, LLC Gelling Agents Guar Gum 9000-30-0 50 0.061873 138686
Suspending agent (solid) 14808-60-7 3 0.009463 21210.9
Surfactant 68439-51-0 3 0.003712 8321.18
Petroleum Distillates 64742-47-8 60 0.058597 131344
WFRA-405 U.S. Well Services, LLC Friction Reducer Hydrated light distillate (petroleum) 64742-47-8 30 0.017409 39021.4
2-Propenoic acid, polymer with 2 propenamide 9003-06-9 30 0.021626 48473.7
SI-1200s U.S. Well Services, LLC Scale Inhibitor Proprietary Scale Inhibitor Proprietary 10 0.001185 2655.06
HCL Acid (12.6%-17.5%) U.S. Well Services, LLC Bulk Acid Water 7732-18-5 87.4 0.129136 289454
Hydrogen Chloride 7647-01-0 17.5 0.030024 67297.5
Water Antero Resources Carrier/Base Fluid Water 7732-18-5 100 86.951 194,898,000.0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2018-06-04 H2O 15 5704 Bbl 246610 US Well Services Inc STAGE 1/71

STAGES 2-70 SEE IMAGES

2018-06-28 H2O 15 6675 Bbl 408080 US Well Services Inc STAGE 71/71

STAGES 2-70 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 ANTERO RESOURCES CORPORATION 2457029 61 153
2019 ANTERO RESOURCES CORPORATION 1405741 0 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 ANTERO RESOURCES CORPORATION Brine 30371 153
2019 ANTERO RESOURCES CORPORATION Brine 43483 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1009772447 2018-7-12 0:00: CT No Violations 0.10
-1059792604 2020-5-21 0:00: PW No Violations 1.00
-1454776867 2018-6-14 0:00: CT No Violations 0.50
-1481476818 2018-9-10 0:00: CT No Violations 0.20
-922080431 2018-5-2 0:00:0 CT No Violations 0.20
0042091749 2017-11-01 Preliminary Restoration No Violations Preliminary Restoration status check inspection found the well site meets ORC 1509.072 with vegetation established in the affected area of the well pad construction disturbance and erosion control in place. The well pad entrance is gated with signage in place. The lease road and well pad is of a stone surface. Addressing the wells on the pad, the drilling process is now complete and the 6 wells on the pad are awaiting stimulation with night caps on the well heads. Gauges are in place to monitor annular pressures. The tin horn cellars have been filled in with river gravel with fluid recovery tubes set inside the cellars. Also on the well pad is the tank battery consisting of 8 steel construction 400 barrel capacity tanks that are situated inside a polymer lined steel containment dike area. The well pad perimeter is constructed of an earthen berm with 3 catch basin fluid discharge points with the drain valves in the closed position. Contract workers from Hall Drilling are on site erecting the sales line and vapor recovery system burners.
0514124942 2017-04-13 Casing String Witnessed No Violations
0922080431 2018-05-02 Completion Testing No Violations Status check inspection found the well drilling process is now complete and crews from lighting energy are on site opening the toe sleeve valves and pressure testing the 5.5 diameter production casing string to 11,500 psi. The completion well head system is company identified as Downing and the well head consists of a manually operated lower master valve and the upper hydraulic master valve followed by a flow cross section. A support equipment is placed on polymer containment. Stimulation is slated begin in the next 14 days.
1009772447 2018-07-12 Completion Testing No Violations Status check inspection found the well stimulation process complete with a total of 71 stages complete. US Well is on location completing the last 2 wells on the pad out of 6 total wells. Annular pressure monitoring is in place on the 9.625 and 13.375 well head sections.
1454776867 2018-06-14 Completion Testing No Violations
1481476818 2018-09-10 Completion Testing No Violations Status check inspection fount the well drill -stimulation-and post stimulation drill out process is now complete. Crews are on site installing all the production equipment. A tank battery has been erected consisting of 8 steel tanks capable of holding 400 barrels of fluid each. All tanks are situated inside a polymer lined steel containment dike area. 6 wells are present on the pad and all 6 are complete. Once the production equipment has been installed flow back operations will begin.
1487320973 2017-06-06 Drill / Deepen / Reopen No Violations
1493272922 2017-04-27 Casing String Witnessed No Violations On site inspection arriving at 12:45 am to witness the surface casing cement job with Patterson Drilling on location along with Schlumberger Cement Service and Wyoming Casing Service. Patterson Drilling has drilled a 17.5 diameter surface borehole on air to a measured depth of 1,294 and ran 1,244 of 13.375 diameter 54.5 pound per foot J-
1493655724 2017-05-01 Drill / Deepen / Reopen No Violations
1534335728 2018-08-15 Completion Testing No Violations Status check inspection on the well completion process found a service rig on the hole owned by Fortis Well Service. Well head surface control is a combination of a snubbing unit owned by QES and 2 primary master valves owned by Cameron well head company. Fortis owns the fluid control service and the company is circulating with 10 pound per gallon brine while drilling out the completion plugs. The well bore total depth is 22,805 and 8,960 of 2.375 diameter EUE production tubing will be set in the well. 2 rigs are set up drilling out the completion plugs on 2 wells on the pad. All completion equipment is situated on polymer containment.
42091749 2017-11-1 0:00: PL No Violations 0.50
514124942 2017-4-13 0:00: CS No Violations 1.00