If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-111-24731 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.85,"lon":-81.2,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Malaga Township | |
Operator Name: ANTERO RESOURCES CORPORATION | |
Well Pad ID: US-OH-001442 | |
Farm/Lease Name: LORAINE UNIT | |
License Status: Producing | |
License Date: 2018-01-26 | |
Spud Date: 2018-01-29 | |
Spud Drilling Contractor: H&P DRILLING | |
Final Drill Date: 2018-06-09 | |
Well Total Depth: 25588.00 ft | |
Configuration: Horizontal | |
Latitude: 39.850000 | |
Longitude: -81.200000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2017-03-30 | Proposed Formations:POINT PLEASANT, Issued Date:3/30/2017, Expired Date:3/30/2019 12:00:00 PM, Drilling unit acres:604.336, Proposed Well Type:OG, Proposed Well Class:EOUT |
APP | 2018-01-26 | Proposed Formations:POINT PLEASANT, Issued Date:1/26/2018, Expired Date:1/26/2020 12:00:00 PM, Drilling unit acres:386.125, Proposed Well Type:OG, Proposed Well Class:EOUT |
Reached Total Depth | 2018-06-09 | |
Correction to Well | 2018-09-21 | TAKE/TARGET PER AS-DRILLED PLAT |
Completion Report Received | 2019-05-01 | |
Record Last Modified | 2019-05-10 | |
Construction Permit Expires | 2020-01-26 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2019-05-09 | 8963 | 9132 | 0 |
2019-05-09 | 25418 | 25472 | 0 |
25418 | 25472 | 0 | |
8963 | 9132 | 0 | |
8963 | 9132 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 12/11/2018 | 01/14/2019 | 8958 | 28,578,100.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | LGC-15 | U.S. Well Services, LLC | Gelling Agents | Suspending agent (solid) | 14808-60-7 | 3 | 0.007226 | 19695.1 |
Surfactant | 68439-51-0 | 3 | 0.002835 | 7726.56 | ||||
Guar Gum | 9000-30-0 | 50 | 0.047248 | 128776 | ||||
Petroleum Distillates | 64742-47-8 | 60 | 0.044746 | 121958 | ||||
SI-1200 | U.S. Well Services, LLC | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 40 | 0.00681 | 18561.9 | |
Sodium Chloride | 7647-14-5 | 10 | 0.001191 | 3245.09 | ||||
Sodium Salt of Diethylenetriaminepenta
(methylenephophonic acid) |
68155-78-2 | 10 | 0.001191 | 3245.09 | ||||
Water | 7732-18-5 | 80 | 0.009525 | 25960.8 | ||||
AP One | U.S. Well Services, LLC | Gel Breakers | Ammonium Persulfate | 7727-54-0 | 100 | 0.001408 | 3838 | |
WFRA-405 | U.S. Well Services, LLC | Friction Reducer | 2-Propenoic acid, polymer with 2 propenamide | 9003-06-9 | 30 | 0.024766 | 67501.5 | |
Hydrated light distillate (petroleum) | 64742-47-8 | 30 | 0.019937 | 54338.7 | ||||
Sand | U.S. Well Services, LLC | Proppant | Crystalline Silica, quartz | 14808-60-7 | 100 | 12.228 | 33,328,100.0 | |
Bioclear 2000 | U.S. Well Services, LLC | Anti-Bacterial Agent | 2,2-dibromo-3-nitrilopropionamide | 10222-01-2 | 20 | 0.004122 | 11234.6 | |
Deionized Water | 7732-18-5 | 28 | 0.002354 | 6417.13 | ||||
Water | Antero Resources | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 87.4471 | 238,342,000.0 | |
HCL Acid (12.6%-17.5%) | U.S. Well Services, LLC | Bulk Acid | Water | 7732-18-5 | 87.4 | 0.122898 | 334966 | |
Hydrogen Chloride | 7647-01-0 | 17.5 | 0.028574 | 77878.9 | ||||
AI-303 | U.S. Well Services, LLC | Acid Corrosion Inhibitors | Formic acid | 64-18-6 | 20 | 0.00001400 | 38.364 | |
Acetophenone,thiourea,formaldehyde polymer | 68527-49-1 | 5 | 0.00000400 | 9.591 | ||||
Cinnamaldehyde | 104-55-2 | 20 | 0.00001500 | 39.6684 | ||||
Butyl cellosolve | 111-76-2 | 20 | 0.00001300 | 34.566 | ||||
Ethylene glycol | 107-21-1 | 40 | 0.00004000 | 109.721 | ||||
Polyether | 60828-78-6 | 10 | 0.00000700 | 19.182 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2019-01-13 | H2O | 15 | 301014 Gal | 407920 | US Well Services Inc | STAGE 83 OF 83 SEE IMAGES FOR STAGES 2-82 |
2018-12-11 | H2O | 15 | 175014 Gal | 173680 | US Well Services Inc | STAGE 1 OF 83 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2019 | ANTERO RESOURCES CORPORATION | 0 | 0 | 31 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2019 | ANTERO RESOURCES CORPORATION | Brine | 0 | 31 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-617674635 | 2019-2-4 0:00:0 | CT | No Violations | 0.20 |
-845491474 | 2020-5-21 0:00: | PL | No Violations | 1.00 |
-85159621 | 2018-1-30 0:00: | CS | No Violations | 0.50 |
0085159621 | 2018-01-30 | Casing String Witnessed | No Violations | On 01/28/2018 the rig drilled a 32-inch diameter borehole to a depth of 100 feet from ground level. Then, 100 feet of 26-inch diameter weld connection casing was inserted into the borehole. They cemented the casing with 67 barrels total volume of 322 sacks of Class A cement with a 1.18 yield, 2 percent calcium chloride, 0.5 pound of flake per sack, displaced with 56 barrels of fresh water, and had 11 barrels of returns at surface |
0617674635 | 2019-02-04 | Completion Testing | No Violations | On site inspection found the well drilling and stimulation process is now complete. The well was stimulated in 83 stages with isolation plugs set in the 5.5 diameter production casing at depths of 8,840 and 8,750. A tubing snubbing unit owned by Deep Well Services was on location and rigging up on the said well. The snubbing unit identified as unit # 6 will drill out the completion plugs on all 6 wells on the pad. The completion well control blow out preventer is owned by KLX Energy. The pressure pumping service is will be provided by Key Energy with a Sand X system for filtration of the well bore materials returned to surface. The completion equipment is situated on polymer containment with poly mats placed on the containment. The well pad perimeter drain valves are in the closed position. Production equipment is present on the pad. Also noted on this day I spoke with the Antero Company Representative on site Bryan Carter and we also called a Doug Phenix regarding the absence of annular pressure monitoring on the well head A&B sections. The men were informed of ORC 1501-9-1-08 section (5) of the well construction rules regarding annular pressure monitoring. |
1526309916 | 2018-05-14 | Drill / Deepen / Reopen | No Violations | |
1526911377 | 2018-05-21 | Drill / Deepen / Reopen | No Violations | Status check inspection on the current well drilling process found H&P Drilling rig 519 on location and rigged up on the well. The rig is currentlyreached a total drilling depth in the 8.5 production well bore at a measured depth of 18,593and is pulling the drill bit at 9,168 for a directional drilling motor change. The total drilling depth proposed it 25,400. |
1528817442 | 2018-06-12 | Drill / Deepen / Reopen | No Violations | |
1529412912 | 2018-02-20 | Drill / Deepen / Reopen | No Violations | Status check inspection found H&P Drilling Rig 519 on location and preparing to begin drilling the 12.250 diameter intermediate well bore section. The Blow Out Preventer has been installed on top of the B section of the well head sub base and consists of a manual master valve with a flow cross assembly on top of the master valve, 2 choke valves are on each side of the flow cross section outlet lines on being manual on being hydraulic. Situated above the flow cross section is 2 sets of pipe rams with a set of blind rams in between the pipe rams. The 13.375 diameter casing string was set on 02/19/2017 and not witnessed due to the holiday. The 13.375 diameter casing was set to a depth of 1,222 and the cement report indicated 58 barrels of cement returns to surface. |
For data sources see[10]