If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-111-24733 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.85,"lon":-81.18,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Malaga Township | |
Operator Name: ANTERO RESOURCES CORPORATION | |
Well Pad ID: US-OH-001440 | |
Farm/Lease Name: HARRISON UNIT | |
License Status: Producing | |
License Date: 2017-04-21 | |
Spud Date: 2017-04-12 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2017-09-04 | |
Well Total Depth: 19531.00 ft | |
Configuration: Horizontal | |
Latitude: 39.850000 | |
Longitude: -81.180000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2017-04-05 | Proposed Formations:POINT PLEASANT, Issued Date:4/5/2017, Expired Date:4/5/2019 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2017-04-21 | Proposed Formations:POINT PLEASANT, Issued Date:4/21/2017, Expired Date:4/21/2019 12:00:00 PM, Drilling unit acres:457.371, Proposed Well Type:OG, Proposed Well Class:EOUT |
Reached Total Depth | 2017-09-04 | OP REQUEST ONE YEAR CONF ON ALL LOGS-ALE |
Correction to Well | 2017-10-20 | UPDATE TARGET/TAKE PER AS-DRILLED PLAT |
Completion Report Received | 2018-10-04 | OP REQUEST ONE YEAR CONF ON ALL LOGS-ALE |
Record Last Modified | 2018-10-20 | OP REQUEST ONE YEAR CONF ON ALL LOGS-ALE |
Construction Permit Expires | 2019-04-21 | OP REQUEST ONE YEAR CONF ON ALL LOGS-ALE |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2018-10-19 | 9123 | 9292 | 0 |
2018-10-19 | 19323 | 19417 | 0 |
19323 | 19417 | 0 | |
9123 | 9292 | 0 | |
9123 | 9292 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 06/29/2018 | 07/18/2018 | 8856 | 19,747,000.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Sand | U.S. Well Services, LLC | Proppant | Crystalline Silica, quartz | 14808-60-7 | 100 | 13.375 | 25,512,300.0 |
AP One | U.S. Well Services, LLC | Gel Breakers | Ammonium Persulfate | 7727-54-0 | 100 | 0.00173 | 3299 | |
SI-1200s | U.S. Well Services, LLC | Scale Inhibitor | Proprietary Scale Inhibitor | Proprietary | 10 | 0.001203 | 2294.52 | |
Water | Antero Resources | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 86.3403 | 164,690,000.0 | |
Bioclear 2000 | U.S. Well Services, LLC | Anti-Bacterial Agent | 2,2-dibromo-3-nitrilopropionamide | 10222-01-2 | 20 | 0.004413 | 8417.74 | |
Deionized Water | 7732-18-5 | 28 | 0.002521 | 4808.18 | ||||
LGC-15 | U.S. Well Services, LLC | Gelling Agents | Surfactant | 68439-51-0 | 3 | 0.002659 | 5072.69 | |
Suspending agent (solid) | 14808-60-7 | 3 | 0.006779 | 12930.4 | ||||
Petroleum Distillates | 64742-47-8 | 60 | 0.041977 | 80068.9 | ||||
Guar Gum | 9000-30-0 | 50 | 0.044323 | 84544.8 | ||||
WFRA-405 | U.S. Well Services, LLC | Friction Reducer | Hydrated light distillate (petroleum) | 64742-47-8 | 30 | 0.018429 | 35152.3 | |
2-Propenoic acid, polymer with 2 propenamide | 9003-06-9 | 30 | 0.022893 | 43667.4 | ||||
HCL Acid (12.6%-17.5%) | U.S. Well Services, LLC | Bulk Acid | Water | 7732-18-5 | 87.4 | 0.111664 | 212995 | |
Hydrogen Chloride | 7647-01-0 | 17.5 | 0.025962 | 49520.8 | ||||
AI-303 | U.S. Well Services, LLC | Acid Corrosion Inhibitors | Ethylene glycol | 107-21-1 | 40 | 0.00003800 | 71.5572 | |
Butyl cellosolve | 111-76-2 | 20 | 0.00001200 | 22.543 | ||||
Polyether | 60828-78-6 | 10 | 0.00000700 | 12.51 | ||||
Acetophenone,thiourea,formaldehyde polymer | 68527-49-1 | 5 | 0.00000300 | 6.255 | ||||
Cinnamaldehyde | 104-55-2 | 20 | 0.00001400 | 25.8707 | ||||
Formic acid | 64-18-6 | 20 | 0.00001300 | 25.02 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2018-07-18 | H2O | 15 | 7944 Bbl | 504300 | US Well Services Inc | STAGE 52/52
STAGES 2-51 SEE IMAGES |
2018-06-29 | H2O | 15 | 6765 Bbl | 296860 | US Well Services Inc | STAGE 1/52
STAGES 2-51 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | ANTERO RESOURCES CORPORATION | 1819036 | 0 | 140 |
2019 | ANTERO RESOURCES CORPORATION | 1603401 | 0 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | ANTERO RESOURCES CORPORATION | Brine | 79922 | 140 |
2019 | ANTERO RESOURCES CORPORATION | Brine | 31463 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-321317408 | 2018-7-12 0:00: | CT | No Violations | 0.20 |
-83109310 | 2017-11-1 0:00: | PL | No Violations | 0.50 |
0083109310 | 2017-11-01 | Preliminary Restoration | No Violations | Preliminary Restoration status check inspection found the well site meets ORC 1509.072 with vegetation established in the affected area of the well pad construction disturbance and erosion control in place. The well pad entrance is gated with signage in place. The lease road and well pad is of a stone surface. Addressing the wells on the pad, the drilling process is now complete and the 6 wells on the pad are awaiting stimulation with night caps on the well heads. Gauges are in place to monitor annular pressures. The tin horn cellars have been filled in with river gravel with fluid recovery tubes set inside the cellars. Also on the well pad is the tank battery consisting of 8 steel construction 400 barrel capacity tanks that are situated inside a polymer lined steel containment dike area. The well pad perimeter is constructed of an earthen berm with 3 catch basin fluid discharge points with the drain valves in the closed position. Contract workers from Hall Drilling are on site erecting the sales line and vapor recovery system burners. |
0321317408 | 2018-07-12 | Completion Testing | No Violations | Status check inspection on the well completion process found US Well Service was on location with their pressure pumping equipment stimulating the well and Horizontal Wireline Service was providing wireline perforating and plug setting. 34 out of 52 stages have been completed. The company does have annular pressure monitoring in place and hooked to the well head during stimulation. Attached to the well head B section is the completion well control stack consisting of a manual master valve followed by a hydraulic master valve then a flow cross and a 3rd manual master valve atop the flow cross. The completion head attachment point for the fluid missile is atop the 3rd master valve. Present on location is 15 pressure pump truck and 3 pump down trucks. All completion support equipment is situated on polymer containment. The well pad perimeter earthen berm drain valves are in the closed position. |
1500923237 | 2017-07-24 | Casing String Witnessed | No Violations | On site inspection to witness the surface casing installation and cement job with Patterson Drilling rig 342 on location along with Wyoming Casing and Halliburton Cement Service. The rig has drilled a 17.5 diameter surface borehole to a measured depth of 25 off of a drilling rig Kelly bushing heigth of 25. The rig pulled the drill string and inserted 1,256 of 13.375 diameter J- |
1535381124 | 2018-08-27 | Completion Testing | No Violations | Status check inspection on the well completion process found Fortis Energy rig # 1072 on location and rigged up on the well drilling out the completion plugs using 10.4 pound per gallon brine to maintain well control. There is a snubbing unit owned by Great White Energy rigged up on the well control blow out preventer. 4 plugs have been drilled out and Falcon Flow Back services is maintaining well control. Annular pressure is being monitored throughout the procedure. The rig and support equipment is situated on polymer containment with the well pad perimeter earthen berm serving as the primary containment. |
1536603904 | 2018-09-10 | Completion Testing | No Violations | Status check inspection fount the well drill -stimulation-and post stimulation drill out process is now complete. Crews are on site installing all the production equipment. A tank battery has been erected consisting of 8 steel tanks capable of holding 400 barrels of fluid each. All tanks are situated inside a polymer lined steel containment dike area. 6 wells are present on the pad and all 6 are complete. Once the production equipment has been installed flow back operations will begin. |
2004229484 | 2017-04-13 | Casing String Witnessed | No Violations | |
2029282110 | 2018-05-02 | Completion Testing | No Violations | Status check inspection found the well drilling process is now complete and crews from lighting energy are on site opening the toe sleeve valves and pressure testing the 5.5 diameter production casing string to 11,500 psi. The completion well head system is company identified as Downing and the well head consists of a manually operated lower master valve and the upper hydraulic master valve followed by a flow cross section. A support equipment is placed on polymer containment. Stimulation is slated begin in the next 14 days. |
7999366 | 2020-5-21 0:00: | PW | No Violations | 1.00 |
For data sources see[10]