X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-111-24809

Well Details

Well ID: 34-111-24809
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Ohio Township
Operator Name: EQUINOR USA ONSHORE PROPERTIES
Well Pad ID: US-OH-001526
Farm/Lease Name: STALDER N
License Status: Producing
License Date: 2017-12-08
Spud Date: 2017-12-19
Spud Drilling Contractor: NABORS DRILLING
Final Drill Date: 2018-04-27
Well Total Depth: 25257.00 ft
Configuration: Horizontal
Latitude: 39.680000
Longitude: -80.920000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2017-12-08 Proposed Formations:POINT PLEASANT, Issued Date:12/8/2017, Expired Date:12/8/2019 12:00:00 PM, Drilling unit acres:715.957, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2018-04-27
Change of Owner 2018-08-08 Operator changed from 9065, STATOIL USA ONSHORE PROPERTIES INC to 10187, EQUINOR USA ONSHORE PROPERTIES INC.
Correction to Well 2019-01-25 UPDATE TARGET/TAKE PER AS-DRILLED PLAT
Completion Report Received 2019-02-07
Record Last Modified 2019-03-12
Construction Permit Expires 2019-12-08

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2019-03-12 10664 11288 0
2019-03-12 24292 25060 0
24292 25060 0
10664 11288 0
10664 11288 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 08/14/2018 08/14/2018 10664 22,473,400.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 HYDROCHLORIC ACID Halliburton Solvent Listed Below Listed Below 0 0 0
MC B-8614 Halliburton Biocide Listed Below Listed Below 0 0 0
FE-2A Halliburton Additive Listed Below Listed Below 0 0 0
FE-1 Halliburton Additive Listed Below Listed Below 0 0 0
Acetate compound Proprietary 5 0.00372087 8088
Propargyl alcohol 107-19-7 10 0.00009852 215
Hydrotreated light petroleum distillate 64742-47-8 30 0.0223252 48528
Ethoxylated alcohols Proprietary 30 0.000295559 643
Acrylamide 79-06-1 0.01 0.00000744 17
Sodium perborate tetrahydrate 10486-00-7 100 0.0100958 21945
Acrylamide polymer Proprietary 30 0.0223252 48528
Sobitan, mono-9-octadecenoate, (Z) 1338-43-8 5 0.00372087 8088
Modified thiourea polymer Proprietary 30 0.000295559 643
Phosphoric acid 7664-38-2 0.1 0.00002285 50
Ethanol 64-17-5 1 0.000228494 497
Fatty acids, tall oil Proprietary 30 0.000295559 643
Crystalline silica, quartz 14808-60-7 100 13.3582 29,036,300.0
Hydrochloric acid 7647-01-0 60 0.230403 500820
Ethoxylated branched C13 alcohol 78330-21-9 5 0.00372087 8088
Glutaraldehyde 111-30-8 30 0.00685481 14901
Sorbitan monooleate polyoxyethylene derivative 9005-65-6 5 0.00372087 8088
Methanol 67-56-1 60 0.000623107 1355
Acetic acid 64-19-7 100 0.0127016 27610
Quaternary ammonium compounds,

benzyl-C12-16-alkyldimethyl chlorides

68424-85-1 5 0.00114247 2484
Citric acid 77-92-9 60 0.0082434 17919
Olefins Proprietary 5 0.000118224 260
OptiKleen-WF(TM) Halliburton Concentrate Listed Below Listed Below 0 0 0
Ingredients Listed Above Listed Above Water 7732-18-5 100 0.455864 990899
HAI-OS ACID INHIBITOR Halliburton Corrosion Inhibitor Listed Below Listed Below 0 0 0
Fresh Water Operator Base Fluid Water 7732-18-5 100 86.123 187,203,000.0
FIGHTR EC-1 Halliburton Friction Reducer Listed Below Listed Below 0 0 0
SAND-PREMIUM WHITE-40/70, BULK Halliburton Proppant Listed Below Listed Below 0 0 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2018-07-27 H2O 15 331388 Gal 440720 Halliburton STAGE 66 OF 66…SEE IMAGES FOR STAGES 2-65
2018-06-10 H2O 15 384127 Gal 486000 Halliburton STAGE 1 OF 66

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 EQUINOR USA ONSHORE PROPERTIES 1714762 0 91
2019 EQUINOR USA ONSHORE PROPERTIES 1718650 0 88

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 EQUINOR USA ONSHORE PROPERTIES Brine 34367 91
2019 EQUINOR USA ONSHORE PROPERTIES Brine 25928 88

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1473546304 2018-4-4 0:00:0 DD No Violations 0.50
-1758708667 2019-12-9 0:00: PW No Violations 0.30
-1770284018 2020-6-9 0:00:0 WR No Violations 6.20
-308223664 2019-1-28 0:00: PW No Violations 0.30
-802226649 2019-4-16 0:00: PL No Violations 0.20
-945318629 2018-4-2 0:00:0 CS No Violations 5.00
-96396681 2017-12-22 0:00 CS No Violations 1.00
0096396681 2017-12-22 Casing String Witnessed No Violations Onsite inspection to witness the conductor casing cement job with Express Energy Services. The rig drilled a 26-inch diameter borehole to a depth of 100 feet from ground level. Then, 100 feet of 20-inch diameter weld connection casing was inserted into the borehole. They cemented the casing first with 9 barrels of fresh water, followed by 40 barrels of cement consisting of 191 sacks of Class A cement with a 1.18 yield, 2 percent calcium chloride, and 0.5 pound of flake, and displaced with 32 barrels of fresh water. The cement appears to be being lost to a formation approximately 40 feet in depth downhole. No cement returns were witnessed to surface. They are going to let it settle and solidify for a few days, and come back to top it off.
0308223664 2019-01-28 Production Wells No Violations On this day, I found the pad gated with signage at the entrance. The drilling and completions processes are finalized and the wells are now in production. There are (3) producing wells, (3) gas processing units with sand-traps, (3) 400-barrel steel production tanks within steel containment, and an Emergency Shutdown (ESD) button is present at the pad entrance. Concrete barriers surround the perimeter of the wellheads. Each well has identification and annular pressure monitoring devices equipped. The 9.625 inch diameter intermediate casing has a pressure of 1,400 pounds per square inch (psi), and the 13.375 inch diameter surface casing has a pressure of 80 psi. It will be noted that I spoke with Equinor representatives Jarrett Howell, Pat Reynolds, and Will Cramblett during the inspection. Additionally, EnerCorp is onsite with secondary sand-traps present at the wellheads.
0764778514 2018-04-20 Drill / Deepen / Reopen No Violations On this day, I found the Nabors X13 rig currently drilling the 8.5 inch diameter production borehole at a measured depth of 17,130 feet and true vertical depth of 10,539 feet, with an azimuth of 321.33 degrees and an inclination of 91.37 degrees. The projected total depth of this hole is 25, 240 feet. A perimeter walk of the pad was conducted and found no indication of pad instability along the slopes. Once the 5.5 inch diameter production casing is cemented, the rig will slide to permit number 2-4810, and complete the lateral section of that well.
0802226649 2019-04-16 Preliminary Restoration No Violations On this day, I am conducting a preliminary restoration inspection. The site meets ORC 1509.072 (A). Annular pressure monitoring devices are equipped, along with proper identification. The 9.625 inch diameter intermediate casing has a pressure of 400 pounds per square inch (psi), and the 13.375 inch diameter surface casing has a pressure of 0 psi. The production records are current.
0945318629 2018-04-02 Casing String Witnessed No Violations On this day, I am onsite to witness the 13.375-inch diameter surface casing cement job with Halliburton Energy Services. The Nabors X13 rig drilled a 17.5-inch diameter borehole to a depth of 1,874 feet from a KB of 32 feet. Wyoming Casing inserted 1,854 feet of 13.375-inch diameter J-55 54.50 lb./ft. casing into the wellbore. Halliburton Energy Services initially pumped 40 barrels of 6% gel spacer, followed by 10 barrels of fresh water spacer. They cemented the casing with 340 barrels total volume of 1,540 sacks of Class A cement with a 1.24 yield, and a weight of 15.8 pounds per gallon. It was displaced with 280 barrels of fresh water. The plug landed with 700 psi and then pressured up and held at 1,250 psi. 80 barrels of cement returns were brought to surface.
1225881247 2017-12-26 Casing String Witnessed No Violations Onsite inspection to witness the conductor casing cement job with Express Energy Services and Caldwell Redi-Mix. The conductor was topped off with redi mix concrete by dumping it down the annulus of the hole and filling it to surface. Cement is witnessed at surface and has stabilized at the cellar floor.
1473546304 2018-04-04 Drill / Deepen / Reopen No Violations On this day, I witnessed the Nabors X13 rig drilling the 12.25 inch diameter borehole at a depth of 3,900 feet. The projected total depth for this borehole is 9,860 feet. I spoke with Company Man Colin Hecker, and discussed a nearby complaint that was reported at Opossum Creek. He indicated that he was unaware of the issue and didnt notice any changes in their drilling procedures.
1523281202 2018-04-09 Drill / Deepen / Reopen No Violations
764778514 2018-4-20 0:00: DD No Violations 1.00

For data sources see[10]

References