Well ID: 34-111-24857 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.63,"lon":-80.94,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Lee Township | |
Operator Name: ECLIPSE RESOURCES I LP | |
Well Pad ID: US-OH-001421 | |
Farm/Lease Name: HERRICK B-M | |
License Status: Producing | |
License Date: 2018-11-20 | |
Spud Date: 2018-12-10 | |
Spud Drilling Contractor: H&P DRILLING | |
Final Drill Date: 2019-03-09 | |
Well Total Depth: 17180.00 ft | |
Configuration: Horizontal | |
Latitude: 39.630000 | |
Longitude: -80.940000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2018-11-20 | Proposed Formations:MARCELLUS, Issued Date:11/20/2018, Expired Date:11/19/2020 12:00:00 PM, Drilling unit acres:509.308, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2019-03-09 | |
Correction to Well | 2019-04-12 | CHANGE IN UNIT SIZE AND TARGET FOOTAGE INFORMATION. |
Correction to Well | 2019-04-19 | UPDATE TARGTE/TAKE PER AS-DRILLED PLAT |
Record Last Modified | 2019-04-19 | |
Construction Permit Expires | 2020-11-19 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
16906 | 17010 | 0 | |
7011 | 7153 | 0 | |
7011 | 7153 | 0 |
For data sources see[3]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-432512498 | 2020-8-18 0:00: | PL | No Violations | 1.60 |
1544541643 | 2018-12-11 | Casing String Witnessed | No Violations | On site inspection at 10:00 am to witness the conductor casing cement job with Precision Rathole Inc and C&J Cement Service. The well was spudded on 12/10/2018 by Precision Rathole who drilled a 30 diameter conductor borehole to a measured depth of 120 from ground level elevation. Upon reaching total depth 120 of 24 diameter .375 wall thickness weld connection conductor pipe was ran into the well bore. C&J Cement Service cemented the casing using a 65 barrel cement mix consisting of 305 sacks of class A cement weighing 15.6 pounds per gallon by weight of scale with 2% calcium and 1/4 pound per sack loss circulation material. The cement was displaced with 57 barrels of fresh water with 20 barrels of cement returns witnessed to surface. The cement returns stayed up to surface inside the tin horn cellar and did not fall back. The job was delayed due to the cementers arriving late and having trouble with the lines on the truck being froze. |
1551266554 | 2019-02-27 | Casing String Witnessed | No Violations | Status check inspection on the surface casing cement job found H&P Drilling rig 608 on location and rigged up on the said well. The rig has drilled a 17.5 diameter surface borehole to a measured depth of 401 with the depth measured from a drilling rig floor heigth f 28.6 above ground level elevation. Upon reaching total depth the rig pulled the drill string and inserted 352 of 13.375 casing. The casing was cemented with a 94.5 barrel cement mix consisting of 450 sacks of class A cement. The cement was displaced to the float collar with 48 barrels of fresh water. The final lift pressure was 230 pounds pressure and the casing test pressure was1,020 pounds pressure. 20 barrels of cement returns were witnessed to surface. |
1551815302 | 2019-03-05 | Drill / Deepen / Reopen | No Violations |
For data sources see[4]