X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-115-24180

Well Details

Well ID: 34-115-24180
Loading map...
Country: United States
State: Ohio
County: Morgan
Municipality: Deerfield Township
Operator Name: R C POLING CO INC
Well Pad ID:
Farm/Lease Name: PATTERSON
License Status: Final Restoration
License Date: 2012-10-19
Spud Date: 2008-03-01
Spud Drilling Contractor: UNGER DRILLING
Final Drill Date: 2008-03-03
Well Total Depth: 1434.00 ft
Configuration: Vertical
Latitude: 39.660000
Longitude: -81.980000

For data sources see[1]

Well History

Well Status Well Status Date Comment
Oil and Gas 1990-10-10 Issued Date 10/10/90 Expired Date 10/10/91 Acres 0040000 Tool Type RTA Proposed Formation CLINTON Proposed Depth 04263 Proposed Drill Depth 04263
Original Spud 1990-10-23 OTD: 4263' IN CLINTON
Completed 1990-10-29 OTD: 4263' IN CLINTON
CO 1990-12-15 302 STEWART DRILLING CO. INC GeoDate 10/10/90
CO 1991-12-05 2867 DNL OIL CORP GeoDate 10/10/90
CO 1992-04-22 2867 DNL OIL CORP GeoDate 4/22/92
GAS WELL 1992-04-22 Issued Date 4/22/92 Expired Date 4/22/93 Proposed Purpose OG Was Plug Supervised N Who Superivsed BY CO.Plug and Abandon Date 9/17/92
Change of Owner 2007-12-04 Operator changed from 2867, DNL OIL CORP to 236, POLING R C CO INC
APP 2007-12-17 Proposed Formations:BEREA, Issued Date:12/17/2007, Expired Date:12/16/2008 6:00:00 AM, Drilling unit acres:10, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2008-03-03 OTD: 4263' IN CLINTON
Completion Report Received 2008-12-22 OTD: 4263' IN CLINTON
APP 2012-10-19 Proposed Formations:BEREA, Issued Date:10/19/2012, Expired Date:10/19/2014 12:00:00 PM, Drilling unit acres:10, Proposed Well Type:OG, Proposed Well Class:
Plugged/Abandoned 2012-11-29 OTD: 4263' IN CLINTON
Construction Permit Expires 2014-10-19 OTD: 4263' IN CLINTON
Record Last Modified 2017-02-15 OTD: 4263' IN CLINTON

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2009-02-06 1361 1367 14
4140 4185 0
1997-06-29 4140 4185 0
4158 4164 24
1361 1367 14
1361 1367 14
2006-09-11 4158 4164 24

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 72000 Gal 60000 FRAC W/72M GAL WATER & 600 SX SAND
H2O 0 38000 Gal 20000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2009 R C POLING CO INC 108.00 0.00 336
2010 R C POLING CO INC 90.00 0.00 365
2011 R C POLING CO INC 109.00 0.00 365
2012 R C POLING CO INC 153.00 0.00 366
2013 R C POLING CO INC 22.00 2.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2009 R C POLING CO INC Brine 140 336
2010 R C POLING CO INC Brine 75 365
2011 R C POLING CO INC Brine 145 365
2012 R C POLING CO INC Brine 162 366
2013 R C POLING CO INC Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1829768186 2008-4-2 0:00:0 DD No Violations
-1872904059 2011-12-5 0:00: PW No Violations 0.50
0000005221 Final Restoration No Violations PASSED Y WITNESSED 6/12/95 INSPECTOR MIKE KAVAGE DATE 06/1219/95 DATA FROM OLD VAX INFO
0000005222 Preliminary Restoration No Violations PASSED Y WITNESSED 9/11/91 INSPECTOR TOM HALL DATE 09/1119/91 DATA FROM OLD VAX INFO
1206646862 2008-03-27 Drill / Deepen / Reopen No Violations Well is being reopened by JAM Drilling(Todd Altier) according to driller they were 130 deep drilling cement proposed T.D. is 1800.
1829768186 2008-04-02 Drill / Deepen / Reopen No Violations Well was reopened to 1425 driller noted gas flow after drilling cement plug out at bottom of surface pipe@1039 service rig will run production casing in well bore at later date(Ken Wright) will update report after casing is run and cemented in place.
1872904059 2011-12-05 Production Wells No Violations Inspection this day found well equipped with a pumping unit and in production. The tank battery has proper identification posted and the dike is in good condition. The gas meter is down the road and across creek.
2008762400 2011-12-21 Production Wells No Violations Well is in production, one production tank, no violations at this time.
2054632246 2012-11-29 Plug / Plug Back No Violations Wrights service rig is plugging for Poling. Formation is cementing the plugs. The 1st plug is bottom plug and is at the depth of 1405-1005. 2nd plug is at Bottom of surface pipe which is at 1039 and set plug at 992-792. The 3rd plug is at 200-0. All plugs circulated. Well plugged on day of 11-29-12 by inspector Patrick Shreve.
5221 FR No Violations
5222 PL No Violations
iDIAN00087 1999-02-22 Final Restoration No Violations
iDIAN000877 1999-2-22 0:00: FR No Violations

For data sources see[9]

References