If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-117-24262 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.41,"lon":-82.84,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Morrow | |
| Municipality: Peru Township | |
| Operator Name: KNOX ENERGY INC. | |
| Well Pad ID: | |
| Farm/Lease Name: TOMLIN UNIT | |
| License Status: Dry and Abandoned | |
| License Date: 2015-11-02 | |
| Spud Date: 2015-11-13 | |
| Spud Drilling Contractor: KILBARGER DRLG | |
| Final Drill Date: 2015-11-21 | |
| Well Total Depth: 3228.00 ft | |
| Configuration: Directional | |
| Latitude: 40.410000 | |
| Longitude: -82.840000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2015-11-02 | Proposed Formations:ONONDAGA THRU TREMPEALEAU, Issued Date:11/2/2015, Expired Date:11/1/2017 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
| Reached Total Depth | 2015-11-21 | |
| Plugged/Abandoned | 2015-11-24 | |
| Completion Report Received | 2016-07-25 | |
| Record Last Modified | 2017-02-10 | |
| Construction Permit Expires | 2017-11-01 |
For data sources see[2]
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1000552374 | 2015-11-25 0:00 | PB | No Violations | |
| -342242638 | 2015-11-13 0:00 | DD | No Violations | |
| 0342242638 | 2015-11-13 | Drill / Deepen / Reopen | No Violations | 10:00pm Kilbarger reached total depth on the surface hole 467. |
| 1000552374 | 2015-11-25 | Plug / Plug Back | No Violations | Received call from the operator that the top plug had slid approximately 250 feet. Filled from top using Lexington Concrete (4 yards total). |
| 1218743627 | 2015-11-16 | Casing String Witnessed | No Violations | 1:30am Kilbarger had difficulty on the second joint of casing (possible mud ring). Work casing up and down and washed casing in. 3:05am Kilbarger finished running 11 joints 9.625 new, 26#, centralized, open ended casing at 452. Petroset cementing hooked up, broke circulation and displaced 165 sacks Class A cement to surface, plug down 3:45 am, estimate 9 barrels of returns on 40% excess. Surface casing emplacement co-witnessed by Knox Energy representative Mr. Bill Mitton. |
| 1447690724 | 2015-11-13 | Drill / Deepen / Reopen | No Violations | Kilbarger Drilling rig #1 spud Tomlin Unit #1 (#4262) with 12.25 bit on fresh water mud at 1:00 am. This is a directional Black River/Trempealeau well. |
| 1448372480 | 2015-11-20 | Drill / Deepen / Reopen | No Violations | Kilbarger Rig #1 reached total depth (on air) at 3226 with 7.875 bit. |
| 1448900621 | 2015-11-24 | Plug / Plug Back | No Violations | 2:45 pm Knox Energy service rig finish running 1.5 inch tubing to 3217. Petroset Cementing hooked up, broke circulation and displaced 65 sack bottom hole plug: plug down 3:02 pm. Knox Energy lay down tubing, Petroset hooked up, broke circulation and displaced 35 sack Black River/Trenton Formation plug: plug down 3:39 pm. Knox Energy lay down tubing, Petroset hooked up, broke circulation and displaced 40 sack Newburg plug: plug down 4:30 pm. Knox lay down tubing, Petroset hooked up, broke circulation and displaced 100 sack Big Lime/Bottom of surface casing combination plug: plug down 5:07 pm. Knox lay down tubing, Petroset hooked up and displaced 55 sacks to surface: plug down 5:40 pm. Knox Energy finished laying down tubing and Petroset topped off the hole. Plugging operation co-witnessed by Knox Energy representative Mr. Bill Mitton and Consultant Mr. Eric Brown. **The Tomlin Unit #1-3784 is officially plugged and abandoned** |
| 1450711968 | 2015-12-18 | Final Restoration | No Violations | Pits closed, topsoil replaced and the site has been rough graded. |
For data sources see[3]