If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-119-24522 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.8,"lon":-81.81,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Muskingum | |
Municipality: Meigs Township | |
Operator Name: J M ADAMS ROUSTABOUT PIPE | |
Well Pad ID: | |
Farm/Lease Name: CAMPBELL | |
License Status: Producing | |
License Date: 1978-11-21 | |
Spud Date: 1979-02-28 | |
Spud Drilling Contractor: | |
Final Drill Date: 1979-03-05 | |
Well Total Depth: 1514.00 ft | |
Configuration: Vertical | |
Latitude: 39.800000 | |
Longitude: -81.810000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1978-11-21 | 1500 TRIDENT MKT GROUP CORP GeoDate 11/21/78 |
Oil and Gas | 1978-11-21 | Issued Date 11/21/78 Expired Date 11/21/79 Acres 0000000 Tool Type Proposed Formation Proposed Depth 00000 Proposed Drill Depth 00000 |
Original Spud | 1979-02-28 | |
Completed | 1979-03-05 | |
Reached Total Depth | 1979-03-05 | |
Construction Permit Expires | 1979-11-21 | |
CO | 1994-04-26 | 171 LYDIC W J INC GeoDate 11/21/78 |
CO | 1995-02-28 | 5053 STALLION PETROLEUM INC GeoDate 11/21/78 |
CO | 1996-10-16 | 3388 ADAMS JM ROUSTABOUT/PIPE GeoDate 11/21/78 |
Record Last Modified | 2013-10-03 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 1366 | 1426 | 12 |
1366 | 1426 | 12 | |
1366 | 1426 | 12 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 40000 Gal | 30000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1987 | ENERGY DISTRIBUTORS INC | 434.00 | 0.00 | 0 |
1988 | KINGSTON OIL CORP | 847.00 | 12.00 | 0 |
1989 | KINGSTON OIL CORP | 591.00 | 6.00 | 365 |
1990 | KINGSTON OIL CORP | 414.00 | 18.00 | 365 |
1991 | KINGSTON OIL CORP | 271.00 | 0.00 | 365 |
1992 | KINGSTON OIL CORP | 397.00 | 27.00 | 350 |
1993 | KINGSTON OIL CORP | 365.00 | 0.00 | 350 |
1994 | KINGSTON OIL CORP | 89.00 | 15.00 | 116 |
1995 | STALLION PETROLEUM INC | 475.00 | 18.00 | 335 |
1996 | STALLION PETROLEUM INC | 292.00 | 0.00 | 290 |
1997 | J M ADAMS ROUSTABOUT PIPE | 353.00 | 4.00 | 300 |
1998 | J M ADAMS ROUSTABOUT PIPE | 210.00 | 0.00 | 365 |
1999 | J M ADAMS ROUSTABOUT PIPE | 246.00 | 0.00 | 365 |
2000 | J M ADAMS ROUSTABOUT PIPE | 249.00 | 6.00 | 365 |
2001 | J M ADAMS ROUSTABOUT PIPE | 198.00 | 0.00 | 331 |
2002 | J M ADAMS ROUSTABOUT PIPE | 211.00 | 0.00 | 350 |
2003 | J M ADAMS ROUSTABOUT PIPE | 304.00 | 7.00 | 365 |
2004 | J M ADAMS ROUSTABOUT PIPE | 240.00 | 12.00 | 365 |
2005 | J M ADAMS ROUSTABOUT PIPE | 199.00 | 0.00 | 365 |
2006 | J M ADAMS ROUSTABOUT PIPE | 0.00 | 0.00 | 365 |
2007 | J M ADAMS ROUSTABOUT PIPE | 419.00 | 16.00 | 365 |
2008 | J M ADAMS ROUSTABOUT PIPE | 417.00 | 7.00 | 365 |
2009 | J M ADAMS ROUSTABOUT PIPE | 405.00 | 9.00 | 365 |
2010 | J M ADAMS ROUSTABOUT PIPE | 355.00 | 14.00 | 365 |
2011 | J M ADAMS ROUSTABOUT PIPE | 318.00 | 7.00 | 365 |
2012 | J M ADAMS ROUSTABOUT PIPE | 328.00 | 14.00 | 366 |
2013 | J M ADAMS ROUSTABOUT PIPE | 218.00 | 4.00 | 365 |
2014 | J M ADAMS ROUSTABOUT PIPE | 113.00 | 0.00 | 365 |
2015 | J M ADAMS ROUSTABOUT PIPE | 131.00 | 10.00 | 365 |
2016 | J M ADAMS ROUSTABOUT PIPE | 108.00 | 0.00 | 365 |
2017 | J M ADAMS ROUSTABOUT PIPE | 91.00 | 0.00 | 365 |