If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-119-28735 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.8,"lon":-81.84,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Muskingum | |
| Municipality: Blue Rock Township | |
| Operator Name: CAMERON PRODUCTION CO INC | |
| Well Pad ID: | |
| Farm/Lease Name: P & D ABELE | |
| License Status: Producing | |
| License Date: 2011-06-07 | |
| Spud Date: 2011-08-08 | |
| Spud Drilling Contractor: KILBARGER DRLG | |
| Final Drill Date: 2011-08-14 | |
| Well Total Depth: 4667.00 ft | |
| Configuration: Vertical | |
| Latitude: 39.800000 | |
| Longitude: -81.840000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2011-06-07 | Proposed Formations:CLINTON/MEDINA, Issued Date:6/7/2011, Expired Date:6/6/2013 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL |
| Reached Total Depth | 2011-08-14 | |
| Completion Report Received | 2011-08-30 | |
| Construction Permit Expires | 2013-06-06 | |
| Record Last Modified | 2017-02-15 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2011-12-01 | 4448 | 4464 | 34 |
| 2011-12-01 | 4538 | 4544 | 7 |
| 4448 | 4464 | 34 | |
| 4538 | 4544 | 7 | |
| 4448 | 4464 | 34 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| 2011-08-20 | H2O | 15 | 134743 Gal | 40000 | Producers Service Corporation |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2011 | CAMERON PRODUCTION CO INC | 755.00 | 478.00 | 0 |
| 2012 | CAMERON PRODUCTION CO INC | 3118.00 | 521.00 | 366 |
| 2013 | CAMERON PRODUCTION CO INC | 1559.00 | 262.00 | 365 |
| 2014 | CAMERON PRODUCTION CO INC | 1139.00 | 211.00 | 365 |
| 2015 | CAMERON PRODUCTION CO INC | 1089.00 | 197.00 | 365 |
| 2016 | CAMERON PRODUCTION CO INC | 972.00 | 196.00 | 365 |
| 2017 | CAMERON PRODUCTION CO INC | 744.00 | 66.00 | 365 |
| 2018 | CAMERON PRODUCTION CO INC | 408.00 | 119.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2011 | CAMERON PRODUCTION CO INC | Brine | 590 | |
| 2012 | CAMERON PRODUCTION CO INC | Brine | 424 | 366 |
| 2013 | CAMERON PRODUCTION CO INC | Brine | 257 | 365 |
| 2014 | CAMERON PRODUCTION CO INC | Brine | 235 | 365 |
| 2015 | CAMERON PRODUCTION CO INC | Brine | 100 | 365 |
| 2016 | CAMERON PRODUCTION CO INC | Brine | 60 | 365 |
| 2017 | CAMERON PRODUCTION CO INC | Brine | 50 | 365 |
| 2018 | CAMERON PRODUCTION CO INC | Brine | 70 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| 0274904708 | 2011-08-10 | Drill / Deepen / Reopen | No Violations | Kilbarger Rig 1 is setting surface. Formation Cementing will cement the 8.625 casing. |
| 0531658448 | 2011-08-14 | Drill / Deepen / Reopen | No Violations | Rig ran 4.5 production casing and cemented it in place using Formation Cementing. No circulation. Ran Kolite with cement. |
| 1369396706 | 2011-10-06 | Preliminary Restoration | No Violations | Preliminary Restoration passed on 10-06-11 by Patrick Shreve. |
| 274904708 | 2011-8-10 0:00: | DD | No Violations | 4.00 |
| 531658448 | 2011-8-14 0:00: | DD | No Violations | 5.00 |
For data sources see[9]