| Well ID: 34-119-28741 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.88,"lon":-81.83,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Muskingum | |
| Municipality: Salt Creek Township | |
| Operator Name: ARTEX OIL COMPANY | |
| Well Pad ID: | |
| Farm/Lease Name: DICKSON-COX UNIT | |
| License Status: Producing | |
| License Date: 2011-08-03 | |
| Spud Date: 2011-09-01 | |
| Spud Drilling Contractor: WARREN DRLG | |
| Final Drill Date: 2011-09-13 | |
| Well Total Depth: 6696.00 ft | |
| Configuration: Vertical | |
| Latitude: 39.880000 | |
| Longitude: -81.830000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2011-08-03 | Proposed Formations:OHIO SHALE THRU KNOX, Issued Date:8/3/2011, Expired Date:8/2/2013 12:00:00 PM, Drilling unit acres:95.5, Proposed Well Type:OG, Proposed Well Class:EOUT |
| Reached Total Depth | 2011-09-13 | |
| Completion Report Received | 2011-11-25 | |
| Construction Permit Expires | 2013-08-02 | |
| Record Last Modified | 2017-10-24 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2012-01-20 | 6526 | 6601 | 84 |
| 6526 | 6601 | 84 | |
| 6526 | 6601 | 84 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| 2011-09-20 | ACID | 15 | 13200 Gal | 0 | Producers Service Corporation |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2011 | ARTEX OIL COMPANY | 1851.00 | 0.00 | 365 |
| 2012 | ARTEX OIL COMPANY | 158722.00 | 532.00 | 366 |
| 2013 | ARTEX OIL COMPANY | 123908.00 | 126.00 | 365 |
| 2014 | ARTEX OIL COMPANY | 81959.00 | 173.00 | 365 |
| 2015 | ARTEX OIL COMPANY | 53939.00 | 0.00 | 365 |
| 2016 | ARTEX OIL COMPANY | 35110.00 | 42.00 | 365 |
| 2017 | ARTEX OIL COMPANY | 24384.00 | 0.00 | 365 |
| 2018 | ARTEX OIL COMPANY | 21150.00 | 21.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2011 | ARTEX OIL COMPANY | Brine | 1317 | 365 |
| 2012 | ARTEX OIL COMPANY | Brine | 504 | 366 |
| 2013 | ARTEX OIL COMPANY | Brine | 432 | 365 |
| 2014 | ARTEX OIL COMPANY | Brine | 268 | 365 |
| 2015 | ARTEX OIL COMPANY | Brine | 356 | 365 |
| 2016 | ARTEX OIL COMPANY | Brine | 262 | 365 |
| 2017 | ARTEX OIL COMPANY | Brine | 360 | 365 |
| 2018 | ARTEX OIL COMPANY | Brine | 185 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1450878049 | 2011-9-1 0:00:0 | DD | No Violations | 2.50 |
| -245512787 | 2011-9-3 0:00:0 | DD | No Violations | 6.00 |
| -540306675 | 2012-8-28 0:00: | PL | No Violations | 1.00 |
| 0245512787 | 2011-09-03 | Drill / Deepen / Reopen | No Violations | Warren Drilling Rig 7 set 8.625 casing and cemented in place using Universal. There was good circulation. |
| 0540306675 | 2012-08-28 | Preliminary Restoration | No Violations | Well is equipped with a gas plunger lift system. 4.5mandrel well head and 2.375 upset tubing. There is a 210 barrel tank battery with dike and id present. There are no violations noted. Preliminary Restoration passed by Patrick Shreve on 8-28-12. |
| 0771556811 | 2011-09-20 | Completion Testing | No Violations | On day of inspection frac was in progress. Break down was at 2075 PSI and average pressure was 3000 PSI. |
| 1319279559 | 2011-09-13 | Drill / Deepen / Reopen | No Violations | Warren rig set 4.5 production casing. Good circulation was established. |
| 1450878049 | 2011-09-01 | Drill / Deepen / Reopen | No Violations | Warren rig 7 set conductor pipe. Formation Cementing cemented to surface with good circulation. |
| 771556811 | 2011-9-20 0:00: | CT | No Violations | 1.00 |
For data sources see[9]