X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-119-28763

Well Details

Well ID: 34-119-28763
Loading map...
Country: United States
State: Ohio
County: Muskingum
Municipality: Jackson Township
Operator Name: DONALD BYERS OIL & GAS LLC
Well Pad ID:
Farm/Lease Name: WOLFORD
License Status: Producing
License Date: 2012-04-10
Spud Date: 2012-08-23
Spud Drilling Contractor: B & J DRLG
Final Drill Date: 2012-12-17
Well Total Depth: 3049.00 ft
Configuration: Vertical
Latitude: 40.150000
Longitude: -82.150000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2012-04-10 Proposed Formations:CLINTON, Issued Date:4/10/2012, Expired Date:4/10/2014 12:00:00 PM, Drilling unit acres:88, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2012-12-17
Completion Report Received 2013-03-12
Construction Permit Expires 2014-04-10
Record Last Modified 2017-10-24

For data sources see[2]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2012-12-17 H2O 0 62624 Gal 30000 Producers Service Corporation No friction reducer was ran. Porosity was at 48%.

For data sources see[3]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2012 DONALD BYERS OIL & GAS LLC 0.00 0.00 0
2013 DONALD BYERS OIL & GAS LLC 0.00 1341.00 365
2014 DONALD BYERS OIL & GAS LLC 0.00 844.00 365
2015 DONALD BYERS OIL & GAS LLC 0.00 591.00 365
2016 DONALD BYERS OIL & GAS LLC 0.00 493.00 365
2017 DONALD BYERS OIL & GAS LLC 0.00 419.00 365
2018 DONALD BYERS OIL & GAS LLC 0.00 416.00 365

For data sources see[4] [5]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2012 DONALD BYERS OIL & GAS LLC Brine 160 0
2013 DONALD BYERS OIL & GAS LLC Brine 420 365
2014 DONALD BYERS OIL & GAS LLC Brine 210 365
2015 DONALD BYERS OIL & GAS LLC Brine 75 365
2016 DONALD BYERS OIL & GAS LLC Brine 75 365
2017 DONALD BYERS OIL & GAS LLC Brine 0 365
2018 DONALD BYERS OIL & GAS LLC Brine 40 365

For data sources see[6] [7]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1077704518 2013-6-18 0:00: PL No Violations 1.00
-132522211 2012-11-13 0:00 DD No Violations 1.00
-1397745843 2012-9-14 0:00: DD No Violations 1.50
-1410384614 2012-12-4 0:00: DD No Violations 2.00
-1951044723 2012-9-5 0:00:0 DD No Violations 1.00
-741923355 2012-9-28 0:00: DD No Violations 2.00
0132522211 2012-11-13 Drill / Deepen / Reopen No Violations Cable tool rig is still in the last 100of the Big Lime. Rig at depth of 2700. Making a lot of water at this point in time.
0326439174 2013-06-19 Preliminary Restoration No Violations Restoration meets all requirements 1509.072A. (Inspected by Jesse Dodds)
0741923355 2012-09-28 Drill / Deepen / Reopen No Violations Rig was at depth of 1550. They are currently about 150 into the Big Cinnamon.
1077704518 2013-06-18 Preliminary Restoration No Violations Everything passed according to 1509.072A.
1351780403 2012-11-01 Drill / Deepen / Reopen No Violations Rig is shut down on day of inspection. They have been drilling in the Big Lime section. No current depth is availible at this time.
1355246942 2012-12-06 Drill / Deepen / Reopen No Violations B&J Drilling is running pipe in to set 5.5casing and Cemenco will be cementing 5.5casing in place. They found that with running pipe in at about depth of 1600 the insert on the float shoe was compromised and that was a good reason for pulling casing back out. I watched as the joint was pulled out and the shoe and the internal parts were all busted. They decided to run another style shoe and finish job on 12-7-12.
1355762052 2012-12-17 Completion Testing No Violations Well is being fraced by Producers and the well is open hole at bottom and cased on top. Break down was at 618 psi. Average rate is at 25 barrel per minute. 5 minute shut in pressure is at 674 psi. Open hole from 3047-2976. Formation is the Clinton.
1397745843 2012-09-14 Drill / Deepen / Reopen No Violations Well is being drilled by B&J Drilling. On 9-13-12 the 7casing was set at depth of 734. The rig is at depth of 800. Rig is currenty drilling and bailing.
1410384614 2012-12-04 Drill / Deepen / Reopen No Violations Rig is at depth of 2955.They drilled thru the Packer Shell and is at the Gray Shale. Rig will have a 5.5casing job on 12-6-12.
1951044723 2012-09-05 Drill / Deepen / Reopen No Violations Rig is drilling at depth of 400with a 8drill bit. I picked up cement ticket because I was on a plug job and unable to attend.
326439174 2013-6-19 0:00: PL No Violations

For data sources see[8]

References